Loading...
HomeMy WebLinkAboutSite PlanH 0^0 meFLOD uilder Services, LLC 3114 W Tulip Tree Drive Greenfield, IN 46140 317-363-8167 djr.hbs@gmail.com THIS PLOT PLAN WAS PREPARED BASED ON INFORMATION TAKEN FROM RECORD PLATS, SUBDIVISION PLANS, RECORD DRAWINGS AND PLANS PROVIDED BY CLIENT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY SITE CONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY HOME BUILDER SERVICES LLC OF ANY DISCREPANCIES. NOTE: BUILDER TO ENSURE POSITIVE FLOW AWAY FROM STRUCTURE. LOT= 8,712 ±S.F. PROPOSED ADDITION= 306 S.F. EXISTING RESIDENCE= 2,425 S.F. EXISTING DRIVE= 1,530 S.F. BUILDING WIDTH = 40'10" LOT COVERAGE AT 48.9t% TOTAL DISTURBED AREA= 500t S.F. PLOT PLAN Prepared For: ELEVATION HOMES Record Description (Per Inst. # 20020048352) Part of the East Half of the Southeast Quarter of Section 25, Township 18 North, Range 3 East, bounded as fallows: begin 560.44 feet South and 138 feet East of the Northwest corner of said East half of said Southeast Quarter and ren thence South 132 feet; thence East 66 feet, thence North 132 feet; thence West 66 feet to the place of beginning Also known as lot 5 in Frank M. Hawkins Addition. Address: 310 2nd Street SW APPARENT VACATED ALLEY 66.00' 5' REAR YARD PROPOSED ADDITION TO MATCH EXISTING LO STRUCTURE. FINISHED 06 M FLOOR TO MATCH EXISTING STRUCTURE AT 834.8t 1 M.E.G. M.E.G. 2 00 1.00 0 F' EXISTING 21.9' p 0 o GARAGE FFE=834.0 EXISTING COt�C a a DRIVE 12.01 O o NEi. O I / � O EXISTING STRUCTURE la } FFE=834.✓j > 40' 10 IW o N N 6.2� ILO U N f i 66.00' M.E.G. wm CONC WAL 1N CURB 9N1 URB INLET SN! SN! W! SW SN! WI- 2nd Street SW Apparent 50' R/W 000.0 PROPOSED GRADE PER PLAN GROUND WATER FLOW SUBJECT PROPERTY — - — - — - — CENTER LINE — — — — — — — — — — RIGHT OF WAY — °— — FLOW LINE OF SWALE %H �+ SANITARY SEWER LINE rn rn STORM SEWER LINE — — — — — — — — — — SUB SURFACE DRAIN rm wm WATER LINE -------------------- EASEMENT LINE BUILDING SETBACK LINE CONTOUR MINOR — — — — — — — — CONTOUR MAJOR SILT FENCE EROSION CONTROL NOTE: 1. Builder shall maintain in good repair all existing erosion control measures necessary to soil erosion for said site during the construction period. Refer to the erosion control for the home builder publication by IDNR Division of Soil Conservation for additional information. 2. Finished grades to be in conformance with subdivision grading plan and plot plan; Excess soil to be disposed of in approved fill area. 3. All sediment tracked onto roadway to be removed by scrapping at the end of each work day. 4. All disturbed areas to be permanently seeded after finished grading has occurred. 5. All sediment control practices to be maintained during construction process to ensure proper functioning. ``x%%J11111/11 ®��,�',.,�. &STE,p�!II�, . Y No. 10911288 O STATE OF Q Date: April 21, 2023