Loading...
HomeMy WebLinkAboutC801 SITE DETAILS8AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO REVISION RECORD 1 05/26/2023 CARMEL ADLS/DP SUBMITTAL DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:DRAWING NO.:321-189 MAY 26, 2023 BEB ACH DILLON CONSTRUCTION MERCHANTS BANK OFFICE BUILDING 210 3RD AVENUE SW CARMEL, INDIANA 46032REFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204 317-655-7777 · 877-746-0749 www.cecinc.com DATE: DWG SCALE: DRAWN BY: CHECKED BY: APPROVED BY: PROJECT NO:SHEETOFDRAWING NO.:SITE DETAILS SGJ BEB ACHC801 DETAIL 210 - ONE-WAY DIRECTIONAL PERPENDICULAR CURB RAMP(INDOT STANDARD DRAWING E 604-SWCR-05)DETAIL 218B - CONCRETE DRIVE W/ COMBINEDDEPRESSED CURB AND GUTTERDETAIL 212 - CONCRETE WHEEL STOPDETAIL 213 - ADA ACCESSIBLE PARKING STALLSDETAIL 215 - SIGNAGE DETAILDETAIL 214 - PAINTED ADA ACCESSIBLESYMBOL DETAILNOT TO SCALEARMOR-TILE TACTILE SYSTEMDETAIL 211 - DETECTABLE WARNING STRIP DETAILDETAIL 216 - LIGHT DUTY ASPHALTPAVEMENT SECTION DETAIL 217 - HEAVY DUTY ASPHALTPAVEMENT SECTIONDETAIL 218A - COMMECIAL DRIVE W/ COMBINEDDEPRESSED CURB AND GUTTER