HomeMy WebLinkAboutP200C - FOUNDATION PLUMBING PLAN - AREA CSMOD
SEE CIVIL ENG.
DRAWINGS FOR
CONTINUATION
6" WASTE
SEE CIVIL ENG.
DRAWINGS FOR
CONTINUATION
6" WASTE
6" FIRE PROTECTION
4" DOMESTIC WATER
4" TO FDC
SEE CIVIL ENG.
DRAWINGS FOR
CONTINUATION
SEE CIVIL ENG.
DRAWINGS FOR
CONTINUATION
GAS SERVICE
BY UTILITY
FCO
6" W
6" W
NOTE:
SANITARY AND STORM DRAIN LINES
TO BE COORDINATED WITH
STRUCTURAL FOUNDATIONS AND
SHOWN ROUTED OUT OF BUILDING.
G
8" ST
8" ST
10" ST
8"ST
8"ST
4"FD
FROM CAR WASH DRAIN TO MAIN
DRAWING TITLE:
CERTIFIED BY:
DRAWING NUMBER
PROJECT NUMBER
REVISIONS:
SCOPE DRAWINGS:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN08/19/22 ABT KC
2020058
P200C
FOUNDATION
PLUMBING
PLAN - AREA
C CARMEL, INNORTH
A
BC
D
KEY PLAN
1/8" = 1'-0"
FOUNDATION - PLUMBING PLAN - AREA C1