Loading...
HomeMy WebLinkAboutP200C - FOUNDATION PLUMBING PLAN - AREA CSMOD SEE CIVIL ENG. DRAWINGS FOR CONTINUATION 6" WASTE SEE CIVIL ENG. DRAWINGS FOR CONTINUATION 6" WASTE 6" FIRE PROTECTION 4" DOMESTIC WATER 4" TO FDC SEE CIVIL ENG. DRAWINGS FOR CONTINUATION SEE CIVIL ENG. DRAWINGS FOR CONTINUATION GAS SERVICE BY UTILITY FCO 6" W 6" W NOTE: SANITARY AND STORM DRAIN LINES TO BE COORDINATED WITH STRUCTURAL FOUNDATIONS AND SHOWN ROUTED OUT OF BUILDING. G 8" ST 8" ST 10" ST 8"ST 8"ST 4"FD FROM CAR WASH DRAIN TO MAIN DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN08/19/22 ABT KC 2020058 P200C FOUNDATION PLUMBING PLAN - AREA C CARMEL, INNORTH A BC D KEY PLAN 1/8" = 1'-0" FOUNDATION - PLUMBING PLAN - AREA C1