HomeMy WebLinkAboutP200D - FOUNDATION PLUMBING PLAN - AREA DFCO
FCO
FCO
6" W
NOTE:
SANITARY AND STROM DRAIN LINES
TO BE COORDINATED WITH
STRUCTURAL FOUNDATIONS AND
ROUTED OUT OF BUILDING.
UNDERGROUND DETENTION CHAMBER
14" ST
12" ST
8" ST
14" ST
8" ST
8"ST
8"ST
DRAWING TITLE:
CERTIFIED BY:
DRAWING NUMBER
PROJECT NUMBER
REVISIONS:
SCOPE DRAWINGS:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN08/19/22 ABT KC
2020058
P200D
FOUNDATION
PLUMBING
PLAN - AREA
D CARMEL, INNORTH
A
BC
D
KEY PLAN
1/8" = 1'-0"
FOUNDATION - PLUMBING PLAN - AREA D1