Loading...
HomeMy WebLinkAboutP200D - FOUNDATION PLUMBING PLAN - AREA DFCO FCO FCO 6" W NOTE: SANITARY AND STROM DRAIN LINES TO BE COORDINATED WITH STRUCTURAL FOUNDATIONS AND ROUTED OUT OF BUILDING. UNDERGROUND DETENTION CHAMBER 14" ST 12" ST 8" ST 14" ST 8" ST 8"ST 8"ST DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN08/19/22 ABT KC 2020058 P200D FOUNDATION PLUMBING PLAN - AREA D CARMEL, INNORTH A BC D KEY PLAN 1/8" = 1'-0" FOUNDATION - PLUMBING PLAN - AREA D1