HomeMy WebLinkAboutP201A - FIRST FLOOR PLUMBING PLAN - AREA AVESTIBULE
?
ELEV 2
EL2-1
ELEV 1
EL1-1
STAIR 1
ST1-1
HYD-1
WC-2
L-2
BIKE STORAGE
130
IDF
131
MDF
132
CORRIDOR
XX3
UNIT T1,
SEE ENLARGED
PLANS.
UNIT T1,
SEE ENLARGED
PLANS.
UNIT T2,
SEE ENLARGED
PLANS.
UNIT T2,
SEE ENLARGED
PLANS.
UNIT LWB,
SEE ENLARGED
PLANS.
UNIT LWA,
SEE ENLARGED
PLANS.
?
?
CORRIDOR
XX4
LEASING/AMENITIES-8
100-8
LEASING/AMENITIES-7
100-7
LEASING/AMENITIES-9
100-9
LEASING/AMENITIES-1
100-1
CORRIDOR
XX2
1 1
1
1
1
1
1 1
1
1
WH-4
4"W
3" W
3" W
1" CW
4"W3"W3"W
1" CW
4"W
3" W
4" W3"W
FD-1FD-1
NOTE:
PARKING GARAGE DRAINS TO BE COORDINATED
WITH STRUCTURAL ENGINEER AND SHOWN. SEE
STRUCTURAL DRAWINGS FOR LOCATIONS.
8"ST UP/DN
6"ST UP/DN
8"ST UP/DN
4" ST
4"ST UP/DN
HB-1
DRAWING TITLE:
CERTIFIED BY:
DRAWING NUMBER
PROJECT NUMBER
REVISIONS:
SCOPE DRAWINGS:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN08/19/22 ABT KC
2020058
P201A
FIRST FLOOR
PLUMBING
PLAN - AREA
A CARMEL, IN1/8" = 1'-0"
FIRST FLOOR - PLUMBING PLAN - AREA A1
NORTH
A
BC
D
KEY PLAN
SHEET KEYNOTES
1 4" WASTE UP AND DOWN.