HomeMy WebLinkAboutP201C - FIRST FLOOR PLUMBING PLAN - AREA CSTAIR 3
ST3-1
ELEV 3
EL3-1
RISER
ROOM
125
ELEVATOR
LOBBY
126
STORAGE
123
RR
122
OFFICE
121
CAR WASH
120
OS-1
V-1
FD-4
HB-1
(1) HOSE BIBB (HB-1)
(1) HOSE BOOM (LIKE SCHNEIDERS EASY UP MODEL 06750)
(1) VACUUM (LIKE JE ADAMS 9225, 2 HP, 120 VOLT -1 PH, PUSH BUTTON & TIMER
(1) FLOOR DRAIN FOR CAR WASH (FD-4)
(1) OIL SEPARATOR (OS-1)
WC-1
L-2
SEE ENLARGED PLAN 1/P409
WH-3
IT
124 MB-1
FD-1
HD-1
NOTE:
PARKING GARAGE DRAINS TO BE COORDINATED
WITH STRUCTURAL ENGINEER AND SHOWN. SEE
STRUCTURAL DRAWINGS FOR LOCATIONS.
1
1
1
1
1
1
1111
1
1
1
1
1
1 1
1
8"ST UP/DN
8"ST UP/DN
HB-1
DRAWING TITLE:
CERTIFIED BY:
DRAWING NUMBER
PROJECT NUMBER
REVISIONS:
SCOPE DRAWINGS:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN08/19/22 ABT KC
2020058
P201C
FIRST FLOOR
PLUMBING
PLAN - AREA
C CARMEL, IN1/8" = 1'-0"
FIRST FLOOR - PLUMBING PLAN - AREA C1
NORTH
A
BC
D
KEY PLAN
SHEET KEYNOTES
1 4" WASTE UP AND DOWN.