Loading...
HomeMy WebLinkAboutP202A - SECOND FLOOR PLUMBING PLAN - AREA APOOL EQUIPMENT 207 FITNESS-2 205-2 STAIR 1 ST1-2 ELEVATOR LOBBY 201 FITNESS-1 205-1 WORK LOFT-1 202-1 (2) FLOOR DRAIN (FD-3) (1) 6" STANDPIPE WITH 6x12 FUNNEL 2" GAS (2 PSI) WITH REGULATOR TO POOL HEATER 1 -1/2" BACKFLOW PREVENTER (RPBP-3) FOR POOL MAKE-UP; 1-1/2" CW SUPPLY (1) HOSE BIBB (HB-1) HOSE VALVE, CAP & CHAIN STANDPIPE RISER UNIT T1, SEE ENLARGED PLANS. UNIT T1, SEE ENLARGED PLANS. UNIT T2, SEE ENLARGED PLANS. UNIT T2, SEE ENLARGED PLANS. UNIT LWB, SEE ENLARGED PLANS. UNIT LWA, SEE ENLARGED PLANS. EWC-1 WC-2 L-2 4" W 4" W 3" W WORK LOFT-2 202-2 WORK LOFT-5 202-5 WORK LOFT-6 202-6 FITNESS-3 205-3 GGG 3" W3" W 1" CW 3" W 3" W 1" CW 3" W MB-1 1 2 1 2 1 2 2 2 1 21 2 2 2 2 1 2 2 1 2 2 2 1 2 2 1 2 2 2 1 2 2 2 2 1 1 1 2 2 2 1 4" W 3" W 4" W 3 3 3" W 4" W 2 4" W 3" W 3" W 4" W 4" W 4" W 3" W 4" W 4" W 3" W 33 3 4" W 3" W 4" W 3" W 4" W 3" W 3" W 4" W 4" W 3" W 3" W 4" W 3" W4" W 4" W 3" W 3" W 3 3 3 3 4" W 3" W 4" W 3" W 3" W 4" W 4" W 3" W 4" W WH-3 G GNOTE: PARKING GARAGE DRAINS TO BE COORDINATED WITH STRUCTURAL ENGINEER AND SHOWN. SEE STRUCTURAL DRAWINGS FOR LOCATIONS. 3 4 4 4 4 4 GCO 6" ST 4" ST 6" ST 8" ST 6" ST 4" ST 6" ST 6" ST CO 4" ST 6" ST 6" ST 6" ST CO 6" ST 4" ST 6" ST 8" ST 8" ST CO CO 4" ST 4" ST 4" ST 4" ST 4" ST 4" ST 4" ST 4" ST HB-1 DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN08/19/22 ABT KC 2020058 P202A SECOND FLOOR PLUMBING PLAN - AREA A CARMEL, IN1/8" = 1'-0" SECOND FLOOR - PLUMBING PLAN - AREA A1 NORTH A BC D KEY PLAN SHEET KEYNOTES 1 4" WASTE STACK FROM ABOVE. 2 2" WASTE STACK FROM ABOVE. 3 4" WASTE DOWN. 4 3" WASTE DOWN.