Loading...
HomeMy WebLinkAboutP202B - SECOND FLOOR PLUMBING PLAN - AREA BM HOSE VALVE, CAP & CHAIN STANDPIPE RISER UNIT LWB, SEE ENLARGED PLANS. UNIT LWA, SEE ENLARGED PLANS. UNIT LWA, SEE ENLARGED PLANS. UNIT LWA, SEE ENLARGED PLANS. UNIT LWB, SEE ENLARGED PLANS. STAIR 2 ST2-2G 4" W 1" CW 1" CW 3" W 3" W 3" W 1" CW 3" W 3" W 1" CW 1" CW 1 2 1 2 2 1 1 2 2 4" W 3" W 3" W 3" W 3 4" W 1 2 1 1 2 2 2 2 2 1 2 1 2 2 22 1 1 2 2 2 1 2 1 3 2 4 1 22 4 4 4 4 2 2 1 3 3" W 4" W 4" W 3 4" W 3" W 4" W 3 4" W 3 3" W 4" W 4" W 4" W 4" W 3 4" W 4" W 3" W 3" W3" W 3" W 3" W 3" W 3 3" W 4" W 4" W 3" W 3 3" W 3" W 4" W3 3" W 3" W 3" W 4" W 4" W 3 4" W 3" W 4" W 3 3" W 3" W 4" W NOTE: PARKING GARAGE DRAINS TO BE COORDINATED WITH STRUCTURAL ENGINEER AND SHOWN. SEE STRUCTURAL DRAWINGS FOR LOCATIONS. 2 6 2"FD 3"W 3" W 2" W 3" W 3" W 3" W 2 2"HD 2" W 2" W 3" W 1,088 CO 8" ST 6" ST 8" ST 6" ST 10" ST 4" ST 10" ST CO CO 6" ST 8" ST 6" ST 6" ST 10" ST 6" ST HB-1 6" ST 4" ST 6" ST 6" ST DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN08/19/22 ABT KC 2020058 P202B SECOND FLOOR PLUMBING PLAN - AREA B CARMEL, IN1/8" = 1'-0" SECOND FLOOR - PLUMBING PLAN - AREA B1 NORTH A BC D KEY PLAN SHEET KEYNOTES 1 4" WASTE STACK FROM ABOVE. 2 2" WASTE STACK FROM ABOVE. 3 4" WASTE DOWN. 4 3" WASTE DOWN. 6 3" WASTE STACK FROM ABOVE.