HomeMy WebLinkAboutP202C - SECOND FLOOR PLUMBING PLAN - AREA CPARKING
206
DRY-PIPE SPRINKLER TO GARAGE
DRY VALVE & RISER
MOUNTED AIR
COMPRESSOR
STANDPIPE MAIN
MAIN DRAIN
SPRINKLER MAIN
4" CW
HOSE VALVE, CAP & CHAINHOSE VALVE, CAP & CHAIN
STANDPIPE RISER
ELEVATOR
LOBBY
208
STAIR 3
ST3-2
G GGG1
1
2
2
2
2
1
2
2
22
1
1
1
22
22
1
1
2
2
1
2
2
2
2
1
2
2
1
1
2
2
2
1
2
1
2
2
2
1 1
1
2
2
2 2
1
3
4" W
3" W
3" W
3" W
3" W 3
3
3
3" W 3" W
4" W
3
3" W 3" W
4" W
3
4" W
3" W
3
3" W
3" W
3" W
4" W
3
3" W
3" W
4" W
3" W
3" W
3" W
3
3" W
3" W
3" W
4" W
3
3
4" W
3" W
3" W
3" W
4" W
3" W
4" W
3" W
3
3
4" W
4" W
3" W
3" W
3" W
4" W
3
3
3" W
4" W
3" W
4" W
3
4" W
3" W
3" W
3" W
4" W
3" W
3" W
3" W
4" W 4" W
NOTE:
PARKING GARAGE DRAINS TO BE COORDINATED
WITH STRUCTURAL ENGINEER AND SHOWN. SEE
STRUCTURAL DRAWINGS FOR LOCATIONS.
4" W
4" W
3" W
2
2"HD
4" W
2" W2" W
CO
6" ST
6" ST
8" ST
4" ST
8" ST
4" ST
8" ST
6" ST
8" ST
CO
6" ST
6" ST
6" ST
8" ST
6" ST
8" ST
CO
8" ST
6" ST
DRAWING TITLE:
CERTIFIED BY:
DRAWING NUMBER
PROJECT NUMBER
REVISIONS:
SCOPE DRAWINGS:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN08/19/22 ABT KC
2020058
P202C
SECOND
FLOOR
PLUMBING
PLAN - AREA
C CARMEL, IN1/8" = 1'-0"
SECOND FLOOR - PLUMBING PLAN - AREA C1
NORTH
A
BC
D
KEY PLAN
SHEET KEYNOTES
1 4" WASTE STACK FROM ABOVE.
2 2" WASTE STACK FROM ABOVE.
3 4" WASTE DOWN.