HomeMy WebLinkAboutP202D - SECOND FLOOR PLUMBING PLAN - AREA DUNIT T1,
SEE ENLARGED
PLANS.
UNIT T2,
SEE ENLARGED
PLANS.
UNIT T1,
SEE ENLARGED
PLANS.
UNIT T3,
SEE ENLARGED
PLANS.
UNIT T2,
SEE ENLARGED
PLANS.
UNIT T3,
SEE ENLARGED
PLANS.
STORAGE
209
STORAGE
210
1" CW1" CW1" CW
1" CW
1" CW
1" CW
GGGG
1
22
2 2
2
2
1
1
2 2 1
2
2
1
2
2
1
2
2
1
1
2
2
1
2
2
1
2
2
2
2
1
2
2
1
1
2
2
1
1
2 2
22
1
1
1
2
2
2
2
1
3
3333
3
4
4
44
44
5
3" W 3" W
3" W4" W
3" W 3" W 3" W 3" W
3" W
3" W 3" W
4" W
4" W
5
5
4" W 4" W
3" W 3" W
4" W
3" W
5
4" W
3" W
4" W
4" W
3" W
4" W
4" W
3" W
5
4" W
3" W
4" W
3" W
4" W
4" W
5
3" W
3" W
4" W
4" W
5
4" W
3" W
4" W
3" W
3" W4" W
3" W
4" W
5
5
4" W
3" W
3" W
4" W
3" W
3" W
4" W4" W
5
4" W
3" W
4" W
5
3" W
3" W
3" W
4" W4" W
3" W
4" W
3" W
4" W
5
5
5
4" W
4" W
5
5
3" W
3" W
4" W
4" W
NOTE:
PARKING GARAGE DRAINS TO BE COORDINATED
WITH STRUCTURAL ENGINEER AND SHOWN. SEE
STRUCTURAL DRAWINGS FOR LOCATIONS.
2
2"HD
2" W
2" W
CO
6" ST
6" ST 8" ST
8" ST
6" ST 6" ST
CO
6" ST
6" ST
8" ST
4" ST
8" ST
4" ST
8" ST 8" ST
6" ST
6" ST
HB-1
DRAWING TITLE:
CERTIFIED BY:
DRAWING NUMBER
PROJECT NUMBER
REVISIONS:
SCOPE DRAWINGS:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN08/19/22 ABT KC
2020058
P202D
SECOND
FLOOR
PLUMBING
PLAN - AREA
D CARMEL, IN1/8" = 1'-0"
SECOND FLOOR - PLUMBING PLAN - AREA D1
NORTH
A
BC
D
KEY PLAN
SHEET KEYNOTES
1 4" WASTE STACK FROM ABOVE.
2 2" WASTE STACK FROM ABOVE.
3 1" CW UP.
4 1" CW TO SERVE UNIT.
5 4" WASTE DOWN.