HomeMy WebLinkAboutP203D - THIRD FLOOR PLUMBING PLAN - AREA DUNIT B2,
SEE ENLARGED
PLANS.
UNIT B2,
SEE ENLARGED
PLANS.
UNIT A2,
SEE ENLARGED
PLANS.
UNIT B2,
SEE ENLARGED
PLANS.
UNIT A1,
SEE ENLARGED
PLANS.UNIT A1,
SEE ENLARGED
PLANS.
UNIT A1,
SEE ENLARGED
PLANS.
UNIT A1,
SEE ENLARGED
PLANS.
UNIT A1,
SEE ENLARGED
PLANS.
UNIT A2,
SEE ENLARGED
PLANS.
UNIT A2,
SEE ENLARGED
PLANS.
UNIT A2,
SEE ENLARGED
PLANS.
UNIT A2,
SEE ENLARGED
PLANS.
UNIT A2,
SEE ENLARGED
PLANS.
UNIT C1,
SEE ENLARGED
PLANS.
UNIT B1,
SEE ENLARGED
PLANS.
UNIT A1,
SEE ENLARGED
PLANS.
1
11
1
1
1
1
1
1
1
1
1 1 1 1 1 1
22
22
2
2
2
2
2
2
2 2
22
2
2
2 2
2
2
2
2 2
2 2
2 2
2
2
2
44
3
3
4
3
3
3
4
3 3 3 3 3
CORRIDOR
XX15CORRIDOR
XX14
CORRIDOR
XX16
CORRIDOR
XX17
CORRIDOR
XX18
CORRIDOR
XX19
CORRIDOR
XX20
MECH
U308
ELEC
U309
1
1
1
1
2
2
2
2
2
2
2
2
4" V
4" W
3" V
3" W
3" V
3" W
3" V
3" W 3" W
3" V
4" W
4" V
5
5
66
7
7
7
7
7
7
5
8
1 1/4" CW
1 1/4" CW1 1/2" CW
1 1/2" CW
3" CW
1" CW
3" CW
2" CW
2" CW
2" CW
1 1/2" CW
3" CW
1" CW
4" CW 3" CW
1 1/2" CW
1" CW
1 1/2" CW
1 1/2" CW
4" CW
1 1/2" CW
1" CW
1 1/2" CW
4" CW
1" CW
1 1/2" CW
1" CW
2" CW
4" CW
2" CW
1 1/2" CW
4" CW
1 1/2" CW
3/4" CW
1 1/2" CW
4" CW
1 1/2" CW
GAS LINE SERVING GRILL
GAS LINE SERVING GRILL
GAS LINE SERVING FIRE PIT
NOTE:
LOCATION OF GAS TIMER
AND SHUT-OFF WILL BE
COORDINATED
HYD-1
2 2
1
3" W
3" V
3" W
3" V
4" W
4" V
9
9
9 9 9
3/4" CW
2"HD-1
2
9 9
4"DD-1 4"DD-1
DRAWING TITLE:
CERTIFIED BY:
DRAWING NUMBER
PROJECT NUMBER
REVISIONS:
SCOPE DRAWINGS:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN08/19/22 ABT KC
2020058
P203D
THIRD
FLOOR
PLUMBING
PLAN - AREA
D CARMEL, IN1/8" = 1'-0"
THIRD FLOOR - PLUMBING PLAN - AREA D1
NORTH
A
BC
D
KEY PLAN
SHEET KEYNOTES
1 4" WASTE STACK, 4" VENT STACK.
2 2" WASTE STACK, 2" VENT STACK.
3 3/4"CW TO SERVE UNIT, 1-1/4"CW UP.
4 1"CW TO SERVE UNIT, 1-1/2"CW UP.
5 3/4"CW TO SERVE UNIT.
6 1"CW UP.
7 1"CW DOWN IN WALL.
8 1-1/4"CW UP.
9 DOWNSPOUTS FROM ROOF. SEE ARCHITECT'S SHEETS FOR EXACT LOCATION.