Loading...
HomeMy WebLinkAboutP203D - THIRD FLOOR PLUMBING PLAN - AREA DUNIT B2, SEE ENLARGED PLANS. UNIT B2, SEE ENLARGED PLANS. UNIT A2, SEE ENLARGED PLANS. UNIT B2, SEE ENLARGED PLANS. UNIT A1, SEE ENLARGED PLANS.UNIT A1, SEE ENLARGED PLANS. UNIT A1, SEE ENLARGED PLANS. UNIT A1, SEE ENLARGED PLANS. UNIT A1, SEE ENLARGED PLANS. UNIT A2, SEE ENLARGED PLANS. UNIT A2, SEE ENLARGED PLANS. UNIT A2, SEE ENLARGED PLANS. UNIT A2, SEE ENLARGED PLANS. UNIT A2, SEE ENLARGED PLANS. UNIT C1, SEE ENLARGED PLANS. UNIT B1, SEE ENLARGED PLANS. UNIT A1, SEE ENLARGED PLANS. 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 22 22 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 44 3 3 4 3 3 3 4 3 3 3 3 3 CORRIDOR XX15CORRIDOR XX14 CORRIDOR XX16 CORRIDOR XX17 CORRIDOR XX18 CORRIDOR XX19 CORRIDOR XX20 MECH U308 ELEC U309 1 1 1 1 2 2 2 2 2 2 2 2 4" V 4" W 3" V 3" W 3" V 3" W 3" V 3" W 3" W 3" V 4" W 4" V 5 5 66 7 7 7 7 7 7 5 8 1 1/4" CW 1 1/4" CW1 1/2" CW 1 1/2" CW 3" CW 1" CW 3" CW 2" CW 2" CW 2" CW 1 1/2" CW 3" CW 1" CW 4" CW 3" CW 1 1/2" CW 1" CW 1 1/2" CW 1 1/2" CW 4" CW 1 1/2" CW 1" CW 1 1/2" CW 4" CW 1" CW 1 1/2" CW 1" CW 2" CW 4" CW 2" CW 1 1/2" CW 4" CW 1 1/2" CW 3/4" CW 1 1/2" CW 4" CW 1 1/2" CW GAS LINE SERVING GRILL GAS LINE SERVING GRILL GAS LINE SERVING FIRE PIT NOTE: LOCATION OF GAS TIMER AND SHUT-OFF WILL BE COORDINATED HYD-1 2 2 1 3" W 3" V 3" W 3" V 4" W 4" V 9 9 9 9 9 3/4" CW 2"HD-1 2 9 9 4"DD-1 4"DD-1 DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN08/19/22 ABT KC 2020058 P203D THIRD FLOOR PLUMBING PLAN - AREA D CARMEL, IN1/8" = 1'-0" THIRD FLOOR - PLUMBING PLAN - AREA D1 NORTH A BC D KEY PLAN SHEET KEYNOTES 1 4" WASTE STACK, 4" VENT STACK. 2 2" WASTE STACK, 2" VENT STACK. 3 3/4"CW TO SERVE UNIT, 1-1/4"CW UP. 4 1"CW TO SERVE UNIT, 1-1/2"CW UP. 5 3/4"CW TO SERVE UNIT. 6 1"CW UP. 7 1"CW DOWN IN WALL. 8 1-1/4"CW UP. 9 DOWNSPOUTS FROM ROOF. SEE ARCHITECT'S SHEETS FOR EXACT LOCATION.