Loading...
HomeMy WebLinkAboutA102 - SECOND FLOOR PLANDN DN 1 1 A 2.1 2.1 3 3 4 4 5 5 6 6 7 7 8 8 9 9 11 11 12 12 14 14 15 15 16 16 C.5 E.5 18 18 J 13.6 G.5 OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW ELEVATOR LOBBY 201STAIR 1 ST1-2 POOL EQUIPMENT 207 STAIR 3 ST3-239' - 0"66' - 10"62' - 0"63' - 0"24' - 10"9"13' - 5"20' - 1"30' - 9"16' - 0"16' - 0"30' - 0"16' - 0"16' - 0"30' - 0"16' - 0"1' - 0"30' - 6"36' - 11"30' - 6"36' - 11"30' - 6"30' - 6"36' - 11"30' - 6"36' - 11"30' - 6" 15' - 6" 1' - 6" 27' - 0"27' - 0"27' - 0"27' - 0"27' - 0"27' - 0"27' - 0"36' - 1"19' - 5"27' - 0"27' - 0"28' - 0"17' - 0"19' - 10"17' - 5" 12' - 2"17' - 0"37' - 3" DN AREA LEGEND Accessory Amenities Circulation Live/Work TownHouse ELEV 1 EL1-2 ELEV 2 EL2-2 2 2 13 13 17 17 H G F E D C B F.9 PARKING 10 10 (RAMP = 18 ps) (RAMP = 18 ps) (2ND FL = 197 ps) (RAMP = 36 ps) C.1 ELEVATOR LOBBY 208 ELEV 3 EL3-2 10.8 10.8 1 1 4 RAMP 6.52% SLOPE F.F.E. EL: 10' - 8" (12 ps) (12 ps) (7 ps)(13 ps)(29 ps) (30 ps) (30 ps) STORAGE 210 STORAGE 209 (Tandem Parking 50 ps)(1 ps) B.1 B.7 C.6 D.3 D.9 E.7 F.7 27' - 7 1/2"27' - 1 1/2"20' - 0"20' - 0"27' - 0"20' - 0"19' - 9"B.4 G.9 1 (13 ps)EV CHARGING STATION EV CHARGING STATION (11) (1) REFER TO ID SHEETS FOR MORE INFORMATION REGARDING THE LEASING/AMENITIES SPACE RR 204 UTILITY U202 FITNESS 205 WORK LOFT 202 FLEX 203 400' - 0"160' - 10 3/8"76' - 6 5/8"237' - 5"E.4 D.4 C.8 MECH U201 330' - 8"69' - 4" LIVE/WORK B LIVE/WORK B LIVE/WORK A LIVE/WORK A LIVE/WORK B LIVE/WORK A LIVE/WORK A TOWNHOUSE A TOWNHOUSE B TOWNHOUSE B TOWNHOUSE A TOWNHOUSE A TOWNHOUSE B TOWNHOUSE B TOWNHOUSE ATOWNHOUSE A TOWNHOUSE A STAIR 2 ST2-2 1 1 1 1 1 1 DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN09/19/2022 JCC NSA 2020058 A102 SECOND FLOOR PLANCARMEL, INSCALE: 1/16" = 1'-0"A102 1 SECOND FLOOR PLAN NORTH 10 7 9 7 5 PLAN NOTES 1 BOLLARDS. TYPICAL 2 TRANSFORMERS - SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION. 3 PROPOSED ELECTRICAL METER LOCATION - SEE MEP SHEETS FOR MORE INFORMATION 4 TRASH CHUTE 5 SIMULATED WOOD DECKING ON SLEEPERS 6 4'-0" PARTIAL HEIGHT WALL WITH FIBER CEMENT SIDING AND FLASHING AS REQUIRED 7 STANDARD METAL PIPE GUARDRAIL 8 PLANTERS 9 PREMANUFACTURED METAL SCUPPER AND DOWNSPOUT SYSTEM 10 TPO ROOFING MEMBRANE 11 METAL COPING 12 UNIT FENCING. SEE ELEVATIONS AND LANDSCAPE DRAWINGS. 13 MOP SINK 14 ROOF ACCESS LADDER DASHED LINE REPRESENTS PARCEL LINE / FIRE WALL BETWEEN BUILDINGS DASHED LINE REPRESENTS PARCEL LINE / FIRE WALL BETWEEN BUILDINGS DASHED LINE REPRESENTS PARCEL LINE / FIRE WALL BETWEEN BUILDINGS DASHED LINE REPRESENTS PARCEL LINE / FIRE WALL BETWEEN BUILDINGS