HomeMy WebLinkAboutA102 - SECOND FLOOR PLANDN
DN
1
1
A
2.1
2.1
3
3
4
4
5
5
6
6
7
7
8
8
9
9
11
11
12
12
14
14
15
15
16
16
C.5
E.5
18
18
J
13.6
G.5
OPEN
TO
BELOW
OPEN
TO
BELOW
OPEN
TO
BELOW
OPEN
TO
BELOW
OPEN
TO
BELOW
OPEN
TO
BELOW
OPEN
TO
BELOW
OPEN
TO
BELOW
ELEVATOR
LOBBY
201STAIR 1
ST1-2
POOL
EQUIPMENT
207
STAIR 3
ST3-239' - 0"66' - 10"62' - 0"63' - 0"24' - 10"9"13' - 5"20' - 1"30' - 9"16' - 0"16' - 0"30' - 0"16' - 0"16' - 0"30' - 0"16' - 0"1' - 0"30' - 6"36' - 11"30' - 6"36' - 11"30' - 6"30' - 6"36' - 11"30' - 6"36' - 11"30' - 6"
15' - 6"
1' - 6"
27' - 0"27' - 0"27' - 0"27' - 0"27' - 0"27' - 0"27' - 0"36' - 1"19' - 5"27' - 0"27' - 0"28' - 0"17' - 0"19' - 10"17' - 5"
12' - 2"17' - 0"37' - 3"
DN
AREA LEGEND
Accessory
Amenities
Circulation
Live/Work
TownHouse
ELEV 1
EL1-2
ELEV 2
EL2-2
2
2
13
13
17
17
H
G
F
E
D
C
B
F.9
PARKING
10
10
(RAMP = 18 ps)
(RAMP = 18 ps)
(2ND FL = 197 ps)
(RAMP = 36 ps)
C.1
ELEVATOR
LOBBY
208
ELEV 3
EL3-2
10.8
10.8
1
1
4
RAMP 6.52% SLOPE
F.F.E.
EL: 10' - 8"
(12 ps)
(12 ps)
(7 ps)(13 ps)(29 ps)
(30 ps)
(30 ps)
STORAGE
210
STORAGE
209
(Tandem Parking 50 ps)(1 ps)
B.1
B.7
C.6
D.3
D.9
E.7
F.7
27' - 7 1/2"27' - 1 1/2"20' - 0"20' - 0"27' - 0"20' - 0"19' - 9"B.4
G.9
1
(13 ps)EV CHARGING
STATION
EV CHARGING
STATION
(11)
(1)
REFER TO ID SHEETS FOR
MORE INFORMATION
REGARDING THE
LEASING/AMENITIES SPACE
RR
204
UTILITY
U202
FITNESS
205
WORK LOFT
202
FLEX
203
400' - 0"160' - 10 3/8"76' - 6 5/8"237' - 5"E.4
D.4
C.8
MECH
U201
330' - 8"69' - 4"
LIVE/WORK B
LIVE/WORK B
LIVE/WORK A
LIVE/WORK A
LIVE/WORK B
LIVE/WORK A
LIVE/WORK A
TOWNHOUSE A TOWNHOUSE B TOWNHOUSE B TOWNHOUSE A TOWNHOUSE A TOWNHOUSE B TOWNHOUSE B TOWNHOUSE ATOWNHOUSE A TOWNHOUSE A
STAIR 2
ST2-2
1
1
1
1
1 1
DRAWING TITLE:
CERTIFIED BY:
DRAWING NUMBER
PROJECT NUMBER
REVISIONS:
SCOPE DRAWINGS:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN09/19/2022 JCC NSA
2020058
A102
SECOND
FLOOR PLANCARMEL, INSCALE: 1/16" = 1'-0"A102
1 SECOND FLOOR PLAN
NORTH
10
7
9
7
5
PLAN NOTES
1 BOLLARDS. TYPICAL
2 TRANSFORMERS - SEE ELECTRICAL DRAWINGS
FOR MORE INFORMATION.
3 PROPOSED ELECTRICAL METER LOCATION - SEE
MEP SHEETS FOR MORE INFORMATION
4 TRASH CHUTE
5 SIMULATED WOOD DECKING ON SLEEPERS
6 4'-0" PARTIAL HEIGHT WALL WITH FIBER CEMENT
SIDING AND FLASHING AS REQUIRED
7 STANDARD METAL PIPE GUARDRAIL
8 PLANTERS
9 PREMANUFACTURED METAL SCUPPER AND
DOWNSPOUT SYSTEM
10 TPO ROOFING MEMBRANE
11 METAL COPING
12 UNIT FENCING. SEE ELEVATIONS AND LANDSCAPE
DRAWINGS.
13 MOP SINK
14 ROOF ACCESS LADDER
DASHED LINE REPRESENTS
PARCEL LINE / FIRE WALL
BETWEEN BUILDINGS
DASHED LINE REPRESENTS
PARCEL LINE / FIRE WALL
BETWEEN BUILDINGS
DASHED LINE REPRESENTS
PARCEL LINE / FIRE WALL
BETWEEN BUILDINGS
DASHED LINE REPRESENTS
PARCEL LINE / FIRE WALL
BETWEEN BUILDINGS