Loading...
HomeMy WebLinkAboutA104 - FOURTH FLOOR PLANAREA LEGEND A1 Unit A2 Unit A3 Unit A6 Unit Accessory B1 Unit B2 Unit B3 Unit B4 Unit B5 Unit B6 Unit B7 Unit B9 Unit C1 Unit C2 Unit Circulation MECH U401 IDF U409 C2 403 A1 405 B7 404 A1 411 B3 406 B5 413 UTILITY U403 STAIR 2 ST2-4 STAIR 1 ST1-4 B4 415 A1 417 B7 410 B7 412 B1 419 B1 423 B2 414 A1 421 A1 425 B2 420 A2 422 A2 424B2 426 A1 427 B1 429 A1 435 A3 430 A2 418 A2 416 A3 440 A3 442 B2 432 A1 443 C1 445 A2 434 A2 436 B2 438 B2 444 B7 446 A1 447 A1 453 A1 459 B1 457 A1 463 A6 465 B1 461 IDF U404 MECH U405 IDF U406 STAIR 3 ST3-4 IDF U407 MECH U408 MECH U402 A2 437 A2 439 A2 441 A1 449 A1 451 A1 455 ELEV 2 EL2-4 ELEV 1 EL1-4 ELEV 3 EL3-4 B6 433 ELEVATOR LOBBY 401 CORRIDORCORRIDORCORRIDORCORRIDORCORRIDORCORRIDORCORRIDORA2 428CORRIDOR CORRIDOR CORRIDOR CORRIDORCORRIDOR A1 431 A1 407 B1 409 B7 448 A2 450 B9 402 4 A2 452 13 B7 408 53' - 10 1/2"27' - 0"40' - 0"27' - 3"27' - 0"40' - 0"27' - 1 1/2"40' - 3"27' - 1 1/2"90' - 4 1/2" 400' - 0"45' - 0"27' - 1 1/2"27' - 1 1/2"40' - 0"27' - 0"39' - 9"206' - 0"39' - 10 1/2"27' - 0"27' - 0"27' - 1 1/2" 27' - 1 1/2"27' - 0"40' - 0"27' - 1 1/2"40' - 1 1/2"27' - 0"38' - 4 1/2"52' - 3"16' - 3 1/2" 21' - 4 1/2" 27' - 1 1/2" 24' - 1 1/2" 24' - 1 1/2" 24' - 0"27' - 0"41' - 11 1/2"206' - 0"400' - 0"5' - 4"38' - 5 3/4"5' - 9 1/2"23' - 9 1/2"24' - 1 1/2"38' - 5 3/4"5' - 4"36' - 10 1/2"24' - 0"24' - 1 1/2"37' - 0"5' - 4"37' - 1 1/2"40' - 1 1/2"40' - 3"40' - 1 1/2"39' - 8 1/2"5' - 4" 5' - 4"36' - 10 1/2"24' - 0"61' - 1 1/2"5' - 4"37' - 1 1/2"40' - 1 1/2"40' - 1 1/2"24' - 0"24' - 0"31' - 11 1/2"51' - 6"40' - 1 1/2"39' - 0 1/2"5' - 4"5' - 4"38' - 5 3/4"5' - 9 1/2"23' - 9 1/2"24' - 1 1/2"38' - 5 3/4"5' - 4"DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN09/19/2022 JCC NSA 2020058 A104 FOURTH FLOOR PLANCARMEL, INSCALE: 1/16" = 1'-0"A104 1 FOURTH FLOOR PLAN NORTH 19 1 1 1 6 1 1 1 1 6 6 9 1 3 12 17 PLAN NOTES 1 BOLLARDS. TYPICAL 2 TRANSFORMERS - SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION. 3 PROPOSED ELECTRICAL METER LOCATION - SEE MEP SHEETS FOR MORE INFORMATION 4 TRASH CHUTE 5 SIMULATED WOOD DECKING ON SLEEPERS 6 4'-0" PARTIAL HEIGHT WALL WITH FIBER CEMENT SIDING AND FLASHING AS REQUIRED 7 STANDARD METAL PIPE GUARDRAIL 8 PLANTERS 9 PREMANUFACTURED METAL SCUPPER AND DOWNSPOUT SYSTEM 10 TPO ROOFING MEMBRANE 11 METAL COPING 12 UNIT FENCING. SEE ELEVATIONS AND LANDSCAPE DRAWINGS. 13 MOP SINK 14 ROOF ACCESS LADDER DASHED LINE REPRESENTS PARCEL LINE DASHED LINE REPRESENTS PARCEL LINE