Loading...
HomeMy WebLinkAboutA105 - FIFTH FLOOR PLANMECH U501 ELEC U509 C2 503 A1 505 B7 504 A1 511 B3 506 B5 513 UTILITY U503 STAIR 2 ST2-5 STAIR 1 ST1-5 B4 515 A1 517 B7 508 B7 510 B7 512 B1 519 B2 514 A1 525 B2 520 A2 522 A2 524 B2 526 A1 527 B1 529 A1 535 A3 530 A2 518 A2 516 A3 540 A3 542 B2 532 A1 543 C1 545 A2 534 A2 536 B2 538 B2 544 B7 546 A1 547 A1 553 A1 559 B1 557 A1 563 A6 565 B1 561 ELEC U504 MECH U505 ELEC U506 STAIR 3 ST3-5 ELEC U507 MECH U508 MECH U502 A2 537 A2 539 A2 541 A1 549 A1 551 A1 555 ELEV 2 EL2-5 ELEV 1 EL1-5 ELEV 3 EL3-5 B6 533 ELEVATOR LOBBY 501 CORRIDORCORRIDORCORRIDORCORRIDORCORRIDORCORRIDORCORRIDORA2 528CORRIDOR CORRIDOR CORRIDOR CORRIDORCORRIDOR A1 531 A1 507 B1 509 B7 548 A2 550 B9 502 4 A2 552 13 AREA LEGEND A1 Unit A2 Unit A3 Unit A6 Unit Accessory B1 Unit B2 Unit B3 Unit B4 Unit B5 Unit B6 Unit B7 Unit B9 Unit C1 Unit C2 Unit Circulation B1 523 A1 521 53' - 10 1/2"27' - 0"40' - 0"27' - 3" 27' - 0"40' - 0"27' - 1 1/2"40' - 3"117' - 6" 400' - 0"45' - 0"27' - 1 1/2"27' - 1 1/2"40' - 0"27' - 0"39' - 9"206' - 0"39' - 10 1/2" 27' - 0"54' - 1 1/2"27' - 1 1/2" 27' - 0"40' - 0"27' - 1 1/2" 40' - 1 1/2"27' - 0" 38' - 4 1/2"52' - 3"16' - 3 3/8" 48' - 6 1/8"24' - 1 1/2" 24' - 1 1/2" 24' - 0" 27' - 0"41' - 11 1/2"5' - 4"38' - 5 3/4"5' - 4"24' - 3"24' - 1 1/2"38' - 5 3/4"5' - 4"36' - 10 1/2"24' - 0"24' - 1 1/2"37' - 0"5' - 4"37' - 1 1/2"40' - 1 1/2"40' - 3"40' - 1 1/2"39' - 8 1/2"5' - 4" 5' - 4"36' - 10 1/2"24' - 0"61' - 1 1/2"5' - 4"37' - 1 1/2"40' - 1 1/2"40' - 1 1/2"24' - 0"24' - 0"31' - 11 1/2"51' - 6"40' - 1 1/2"39' - 0 1/2"5' - 4"5' - 4"38' - 5 3/4"5' - 4"24' - 3"24' - 1 1/2"38' - 5 3/4"5' - 4"400' - 0"206' - 0"DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN09/19/2022 JCC NSA 2020058 A105 FIFTH FLOOR PLAN CARMEL, INSCALE: 1/16" = 1'-0"A105 1 FIFTH FLOOR PLAN NORTH 19 1 1 1 6 1 1 1 1 6 6 9 1 3 12 17 PLAN NOTES 1 BOLLARDS. TYPICAL 2 TRANSFORMERS - SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION. 3 PROPOSED ELECTRICAL METER LOCATION - SEE MEP SHEETS FOR MORE INFORMATION 4 TRASH CHUTE 5 SIMULATED WOOD DECKING ON SLEEPERS 6 4'-0" PARTIAL HEIGHT WALL WITH FIBER CEMENT SIDING AND FLASHING AS REQUIRED 7 STANDARD METAL PIPE GUARDRAIL 8 PLANTERS 9 PREMANUFACTURED METAL SCUPPER AND DOWNSPOUT SYSTEM 10 TPO ROOFING MEMBRANE 11 METAL COPING 12 UNIT FENCING. SEE ELEVATIONS AND LANDSCAPE DRAWINGS. 13 MOP SINK 14 ROOF ACCESS LADDER DASHED LINE REPRESENTS PARCEL LINE DASHED LINE REPRESENTS PARCEL LINE