Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A106 - SIXTH FLOOR PLAN
ROOF AREA LEGEND A1 Unit A2 Unit A3 Unit A6 Unit Accessory B1 Unit B2 Unit B3 Unit B4 Unit B5 Unit B6 Unit B7 Unit B9 Unit C1 Unit C2 Unit Circulation MECH U601 IDF U611 C2 603 A1 605 B7 604 A1 611 B3 606 B5 613 UTILITY U603 STAIR 2 ST2-6 STAIR 1 ST1-6 B4 615 A1 617 B7 608 B7 610 B7 612 B1 619 B1 623 B2 614 A1 621 A1 625 B2 616 A2 618 A2 620B2 622 A1 627 B1 629 A1 635 A3 626 B2 628 A1 643 C1 645 A2 630 A2 632 B2 634 B2 636 B7 638 A1 647 A1 653 A1 659 B1 657 A1 661 A6 665 B1 663 IDF U604 MECH U606 IDF U607 STAIR 3 ST3-6 IDF U608 MECH U609 MECH U602 A2 637 A2 639 A2 641 A1 649 A1 651 A1 655 ELEV 2 EL2-6 ELEV 1 EL1-6 ELEV 3 EL3-6 B6 633 ELEVATOR LOBBY 601 CORRIDORCORRIDORCORRIDORCORRIDORCORRIDORCORRIDORA2 624CORRIDOR CORRIDOR CORRIDOR CORRIDOR A1 631 A1 607 B1 609 B7 640 A2 642 B9 602 4 10 11 11 SLOPE SLOPE STOR. U610 STOR. U605 13 14 A2 644 53' - 10 1/2"27' - 0"40' - 0"27' - 3" 27' - 0"40' - 0"27' - 1 1/2"40' - 3"117' - 6" 400' - 0"45' - 0"27' - 1 1/2"27' - 1 1/2"40' - 0"27' - 0"39' - 9"206' - 0"39' - 10 1/2" 27' - 0" 27' - 0" 27' - 1 1/2" 27' - 1 1/2" 27' - 0"40' - 0"27' - 1 1/2" 40' - 1 1/2"27' - 0" 38' - 4 1/2"52' - 3"16' - 3 3/8" 48' - 6 1/8"24' - 1 1/2" 24' - 1 1/2" 24' - 0" 27' - 0"41' - 11 1/2"5' - 4"38' - 5 3/4"5' - 4"24' - 3"24' - 1 1/2"38' - 5 3/4"5' - 4"36' - 10 1/2"24' - 0"24' - 1 1/2"37' - 0"5' - 4"37' - 1 1/2"40' - 1 1/2"40' - 3"40' - 1 1/2"39' - 8 1/2"5' - 4" 5' - 4"36' - 10 1/2"24' - 0"61' - 1 1/2"5' - 4"37' - 1 1/2"40' - 1 1/2"40' - 1 1/2"24' - 0"24' - 0"31' - 11 1/2"51' - 6"40' - 1 1/2"39' - 0 1/2"5' - 4"5' - 4"38' - 5 3/4"29' - 7"23' - 9 1/4"38' - 10 1/4"5' - 4"400' - 0"206' - 0"10 DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN09/19/2022 JCC NSA 2020058 A106 SIXTH FLOOR PLANCARMEL, INSCALE: 1/16" = 1'-0"A106 1 SIXTH FLOOR PLAN NORTH 17 1 1 1 6 1 1 1 1 6 6 11 1 1 10 17 PLAN NOTES 1 BOLLARDS. TYPICAL 2 TRANSFORMERS - SEE ELECTRICAL DRAWINGS FOR MORE INFORMATION. 3 PROPOSED ELECTRICAL METER LOCATION - SEE MEP SHEETS FOR MORE INFORMATION 4 TRASH CHUTE 5 SIMULATED WOOD DECKING ON SLEEPERS 6 4'-0" PARTIAL HEIGHT WALL WITH FIBER CEMENT SIDING AND FLASHING AS REQUIRED 7 STANDARD METAL PIPE GUARDRAIL 8 PLANTERS 9 PREMANUFACTURED METAL SCUPPER AND DOWNSPOUT SYSTEM 10 TPO ROOFING MEMBRANE 11 METAL COPING 12 UNIT FENCING. SEE ELEVATIONS AND LANDSCAPE DRAWINGS. 13 MOP SINK 14 ROOF ACCESS LADDER DASHED LINE REPRESENTS PARCEL LINE DASHED LINE REPRESENTS PARCEL LINE