HomeMy WebLinkAboutE101 - SITE ELECTRICAL PLANIndustrial
Drive
50' Ingress/Egress Easement
D.B. 233, PG. 249
D.B. 238, PG. 37
E m e rs o n
R o a d
5 0 ' P u b lic R ig h t-o f-W a y
(a s p h a lt)SMOD
TXBTXBTXBTXB
M
T
SS
G
D
D
S
D
R
R
W
WV
W
WV
WV
T
T
T
T
R
T
GV
S
X
XX
C. O.
T D
X
X
WV
T
DYH
T
D
T
TP
WV
S
E
R
R
D
D
S
W
D
W
D
EH
R
R
SR
R
R
J
J
J
J
J
J
METERING BANK
MC1
METERING BANK
MC2
UT3UT2
UT1
UTILITY SMOD
METERING BANK
MC5
HSB
UTILITY GEAR
METERING BANK
MC3
METERING BANK
MC4
S2
S1B S1B S1B S1B S1B
S1 S1 S1
S1
1H1-24,26 1H1-24,26 1H1-24,26
1H1-24,26
1H1-58
1H1-24,26 1H1-24,26 1H1-24,26 1H1-24,26 1H1-24,26
1H3-31
S2
S2
1H1-58
S2
1H1-58
S2
1H1-58
S2
1H1-58
UTILITY METER AND
SERVICE DISCONNECT
1
2
H5A
SEE LIGHTING PLANS
FOR CIRCUITING
(TYP.)
H5B
SEE LIGHTING PLANS
FOR CIRCUITING
AND H5B STACKED
H5A
SEE LIGHTING PLANS
FOR CIRCUITING
(TYP.)
NOT IN PROJECT
SCOPE
NOT IN PROJECT
SCOPE
3 (TYP.)
NOT IN PROJECT
SCOPE
H4
H5B4
H4
4
1H3-31
1H3-31
(TYP. OF 2)
(TYP. OF 2)
H4
4 1H3-31
(TYP. OF 2)
5
6
1H3-39,41
1H3-24
1H3-33 7
1H3-33 7
1H3-33 7
1H3-33 7
DRAWING TITLE:
CERTIFIED BY:
DRAWING NUMBER
PROJECT NUMBER
REVISIONS:
SCOPE DRAWINGS:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
ISSUE DATE DRAWN BY CHECKED BYPROJECT:CARMEL MIDTOWN05/16/23 PLR PLR
2020058
E101
SITE
ELECTRICAL
PLAN CARMEL, INN
1" = 30'-0"
SITE ELECTRICAL PLAN
GENERAL NOTES
A REFER TO SHEET E000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
B PROTECT ALL EXISTING UTILITY LINES CROSSING SITE UNLESS DIRECTED
OTHERWISE. COORDINATE WITH ALL OTHER TRADES FOR BURIAL DEPTHS
PRIOR TO INSTALLATION.
C ALL EXTERIOR WIRE AND CONDUIT TO BE 3#10,1" SCH 80 PVC UNLESS NOTED
OTHERWISE.
D SHOWN ROUTINGS ARE DIAGRAMATIC. CONTRACTOR IS RESPONSIBLE FOR
COORDINATING EXACT ROUTING WITH OTHER TRADES.
E SEE E200 SERIES DRAWINGS FOR FACADE LIGHTING.
F SEE E210 SERIES DRAWINGS FOR ELECTRICAL AND FIRE ALARM DEVICES
WITHIN BUILDING.
SHEET KEYNOTES
1 PROVIDE 208V/1Ø, 50-AMP CIRCUIT TO PHOTOVOLTAIC SYSTEM DISCONNECT.
INSTALL DISCONNECT WITHIN LINE OF SITE OF BUILDING METER CABINET.
DISCONNECT AND DOWNSTREAM FEEDER BY OTHERS. SEE E903 FOR MORE
INFORMATION.
2 PROVIDE 2-INCH CONDUIT FROM CITY FIBER MANHOLE TO CITY MDF WITHIN
GARAGE. COORDINATE EXACT LOCATION AND ROUTING WITH CITY PRIOR TO
ROUGH-IN.
3 LIGHTING IN SOFFIT OF TOWNHOME'S TO BE CONTROLLED BY OCCUPANT
WITH INDIVIDUAL WALL SWITCHES AND IS NOT PART OF CALCULATIONS.
LIGHT FIXTURE IS NOT PART OF THE SCOPE OF THIS PROJECT.
4 SURFACE MOUNTED TO THE BOTTOM OF THE CANOPY. RUN EMT THROUGH
THE INTERIOR CAVITY OF THE CANOPY AND PENETRATE INTO WALL. PROVIDE
EMERGENCY INVERTER TO POWER LIGHTS NEAR PANEL AHEAD OF
PHOTOCELL TO CONTROL LIGHTING.
5 PROVIDE (2) 2" SCH 80 PVC FROM CITY FIBER MANHOLE TO PULLBOX
IMMEDIATE TO ENTERING UNDER THE BUILDING. PROVIDE PULL BOX.
COORDINATE EXACT LOCATION OF SERVICE ENTRANCE AND ROUTING WITH
TECHNOLOGY DRAWINGS PRIOR TO ROUGH-IN.
6 PROVIDE 3#10,1" SCH 80 PVC FROM PLAZA ART INSTALLATION TO SOURCE
PANEL TO SERVE HEATERS. PROVIDE DIGITAL ASTRONOMICAL TIMECLOCK
TO PROVIDE TIME OF YEAR USE PREVENTION. PROVIDE 3#10,1" SCH 80 PVC
FROM PLAZA ART TO SOURCE PANEL TO SERVE LIGHT FIXTURES. PROVIDE
ADDITIONAL DIGITAL ASTRONOMICAL TIMECLOCK TO SET YEAR ROUND
LIGHTING REQUIREMENTS.
7 PROVIDE ELECTRICAL CONNECTION TO CATENARY LIGHTING. SEE L102 FOR
EXACT ROUTING. PROVIDE 3#10,3/4" SCH 40 PVC FROM SUPPORT POLE TO
SUPPORT POLE AND HOMERUN INTO BUILDING. RISE IN NEAREST
ACCESSIBLE WALL CAVITY TO ABOVE CEILING. TRANSITION TO EMT BACK TO
SOURCE. PROVIDE CELESTIAL LIGHTING HYA-STL-V2.6 IN LENGTHS
INDICATED ON LANDSCAPE DRAWING. PROVIDE QUICK DISCONNECT PER
FIRE MARSHAL REQUIREMENTS.