HomeMy WebLinkAbout06080196 State Release
-
i:::~~
.!~<<JIk,''M!;.
~~
' i"a"i"B" ,".
Would you like to reduce your turnaround time?
ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA AT
efile24-7@dhs.state.in.us, Or VISIT OUR WEB SITE AT www.in.gov/dhs/osbc
Project number
E-Filed, No hard [ReleaSe date
copy will be mailed 08/29/06
I Occupancy classification
A-2. ADO. REM
CONSTRUCTION DESIGN RELEASE
State Form 41191 (R9/S-98)
Report Printed on: August 29, 2006
320411
Construction type
V-B. SPK
Scope of release
Indiana Department of Homeland Security
DIVISION OF FIRE SAFETY I PLAN REVIEW
402 W. Washington St., Room E245
Indianapolis, IN 46204
ftI[Qyoo
ARCH ELEC
PLUM STR
Type of release
Standard
Project name
Stone Creek 2
HOOO MECH
Available At Your Local Licence Branch
SUPPORT HOOSIER SAFETY
To: Owner I Architect I Engineer
Scoggins Design Inc
Todd Scoggins 10100042
8954 Beckford Dr
Indianapolis IN 46234
Street address
4450 Weston Pointe Dr
Fax & e-mail: 3172738302, todd@scogginsdesign.com
I
City
Carmel
I County
HAMIL TON
The plans, specIfications and application submitted for the above referenced project have been reviewed for compliance wIth the applicable rules of
the Fire Prevention and Building Safety Commission. The pruject is released for construction subject to, but not necessarily limited to, the conditions
listed'below..THIS IS NOT A BUILDING PERMIT. All required local permits and licenses must be obtained prior to beginning construction work. All
construction work must be in full compliance with all applicable State rules. Any changes in the released plans andlor specifications must be filed with
and released by this Office before any work is altered. This release may be suspended or revoked if it is determined to be issued in error, in violation
of any rules of the Commission or if it is based on incorrect or insufficient information. This release shall expire by limitation, and become null and
void, if the work authorized is not commenced within one (1) year from the above date.
CONDITIONS:
Note :(A 1A & A 1 B): In accordance with'the affidavit sworn under penalties of perjury in the application for construction design release the plans
~nd specifications filed in conjunction with this project shail comply with all of the applicable rules and laws of Fire Prevention and Building Safety
Commission. Providing false information constitutes an act of perjury, which is a Class 0 felony punishable by a prison term and a fine up to $10,000.
In accordance with Section 19 of the General Administrative Rules (675 lAC 12-6-19) a complete set of plans and specifications that conform
exactly to the design that was released by the office of the state building commissioner shall be maintained on the construction jobsite as well as a
copy of the design release.
3B0705C
3B0907 A
4G0603AE
3B1003H
3M0507 A
3B0505A
3B1003Q
3B1114A
One or more fire walls are being provided for the purposes of allowable area and minimum
construction type in accordance with Section 705.1, IBC (675 lAC 13-2.4) (Reference release #
314647 dated 01/18/06)
An approved fire alarm system shall be installed in Group A occupancies in accordance with Section
907.2.1 IBC (675 lAC 13-2.4).
Detailed pians and specifications of the fire suppression system shall be filed with the required
application and appropriate fees in accordance with 675 lAC 12-6-3(a) and 675 lAC 13-1-8.
(N.F.P.A.13)
Exit doors from Group A occupancies shall not be provided with a latch or lock unless it is panic
hardware in accordance with Section 1003.3.1.9, IBC (675 lAC 13-2.4).
The complete installation of the exhaust hood and hood suppression system shall be in accordance
with Section 507, IMC (675 lAC 18-1.4). (this release includes the hood and hood suppression
system)
The design and construction of a mezzanine shall be in accordance with Section 505, IBC (675 lAC
13-2.4).
Every stairway serving any building or portion thereof shall conform to the requirements of Section
1003.3.3, IBC (675 lAC 13-2.4)
The size and spacing of grab bars shall be in accordance with Section 4.26.2, Part 1, Chapter 11,
IBC (675 lAC 13-2.4).
Page 1/2
.
Would you like to reduce your turnaround time?
ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA AT
efile24-7@dhs.state.in.us, Or VISIT OUR WEB SITE AT www.in.gov/dhs/osbc
Please be advised that if an administrative review of this action is desired, a written petition for review must be filed at the above address with the
Fire Prevention and Building Safety Commission identifying the matter for which a review is sought no later than eighteen (18) days from the above -
stated date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute, or a day in which the Department of Fire
and Building Services is closed during normal business hours. In the latter case, the filing deadline will be the first working day thereafter. If you
choose to petition, and the before-mentioned procedures are followed. your petition for review will be granted. and an administrative proceeding will
be conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is not filed. this Order will
be final. and you must comply with its requirements.
Fiied By Code review official Code Enforcement & Plan Review Branch Director
TONY BRADSHAW lj~7'//S~
Address (name,title of local official,street,city,state and ZIP code
DEPT OF COMMUNITY SERVICE State Fire Marshal V1?,O~
JIM BLANCHARD
ONE CIVIC SQUARE
CARMEL, IN 46032
Fax & e-mail: 3175712499, jblanchard@carmel.in.gov
Page 2/2