Loading...
HomeMy WebLinkAboutDemo Floor PlanUP UP ABCDEFGHJKLMNP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 1 1 1 2 3 3 3 4 4 4 5 66 7 8 9 10 11 12 R.O.3'-4"3"13 13 13 13 13 13 13 14 14 14 15 15 16 15 15 13 13 13 13 13 1313 9" R.O. 3'-6"R.O.3'-4"2"13 1313 13 13 13 13 13 13 13 15 15 15 15 15 15 17 17 17 18 18 19 19 2021 20 21 19 19 19 19 22 23 15 22 22 22 22 22 22 21 24 24 22 25 25 25 25 25 25 25 25 16 26 27 27 2727 27 13'-10 3/8" +/-5'-4"23'-0 1/2"2'-2 1/2"5'-0"5'-0"5'-8 1/8"33'-5 3/4" +/-24'-6 1/8" 13 2'-9"21'-9 1/8" 4'-7 3/8"24'-11 1/8" 22 1'-6 7/8"3'-9 7/8" 28 28 28 29 30 30 30 30 30 30 31 31 29 29 29 29 29 29 29 32 33 34 34 34 34 35 13 36 36 36 36 36 36 36 36 36 36 36 36 37 37 38 38 39 39 40 40 41 41 41 DEMOLITION NOTES 1. SEE ALL DRAWINGS FOR ADDITIONAL NOTES AND SPECIFICATIONS. 2. GENERAL CONTRACTOR TO COORDINATE ALL PHASES OF DEMOLITION FOR PROJECT AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES OR CONFLICTING CONDITIONS WHICH WOULD INTERFERE WITH THE SATISFACTORY COMPLETION OF THE WORK, PRIOR TO THE START OF DEMOLITION. 3. GENERAL CONTRACTOR TO PROVIDE TEMPORARY POWER AND LIGHTING THROUGHOUT COURSE OF JOB WHERE REQUIRED. 4. FIRE AND SMOKE DETECTION SYSTEM (EXISTING) TO REMAIN IN OPERATION DURING DEMOLITION AND CONSTRUCTION INCLUDING ALL STROBES. 5. DO NOT REMOVE ANY BUILDING CLASS "E" FIRE PROTECTION SIGNALS OR EQUIPMENT, UNLESS OTHERWISE NOTED. PROTECT AS REQUIRED FOR DURATION OF THE JOB. 6. SEE DESIGN BUILD M.E.P. DRAWINGS AND NOTES FOR ADDITIONAL DEMOLITION REQUIREMENTS WHEN REFERRING TO HVAC, SPRINKLER, PLUMBING, ELECTRICAL, FIRE ALARM AND COMMUNICATION. 7. ANY AND ALL ELECTRICAL/DATA AND TELEPHONE DEVICES, WIRING, CABLES , CONDUITS, ETC. TO BE REMOVE SHALL BE REVIEWED BY BUILDING MANAGEMENT, CLIENT CONSULTING ENGINEER AND ANY OTHER CONSULTANT DEEMED NECESSARY PRIOR TO ANY WORK. 8. ANY REMOVAL OF SUCH ELECTRICAL EQUIPMENT SHALL BE DONE IN SUCH A WAY AS TO ALLOW THE OPERATIONS OF ADJACENT FLOORS TO CONTINUE WITHOUT INTERRUPTION OF ANY SERVICE DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NEEDED IN ORDER TO COMPLY WITH THIS REQUIREMENT. 9. PRIOR TO DEMOLITION, G.C. TO REVIEW WITH VOICE/DATA CONSULTANT FOR THE REMOVAL OF ANY AND ALL VOICE/DATA CONDUIT, CABLES AND EQUIPMENT. 10. GENERAL CONTRACTOR IS RESPONSIBLE FOR DEMOLITION AND REMOVAL OF ALL DEBRIS AND DISCARDED MATERIALS AND/OR EQUIPMENT AS INDICATED WITHIN THE SPACE. 11. GENERAL CONTRACTOR TO COORDINATE WITH THE CLIENT AS TO THE PROTECTION AND/OR STORAGE OF ANY ITEMS TO BE SAVED FROM DEMOLITION. 12. GENERAL CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING ITEMS TO REMAIN (I.E. PLUMBING FIXTURES, WINDOWS, CONVECTOR COVERS, ETC.) THROUGHOUT THE COURSE OF THE JOB. 13. GENERAL CONTRACTOR MUST PROVIDE ALL REQUIRED PROTECTION TO ALL SURROUNDING AREAS THROUGHOUT COURSE OF THE DEMOLITION AND CONSTRUCTION. DEMOLITION NOTES 14. GENERAL CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REPLACE ANY DAMAGE IN THE SURROUNDING AREAS CAUSED BY DEMOLITION AND CONSTRUCTION IN "AREA OF WORK". 15. ALL EXISTING WALLS, COLUMNS, AND PERIMETER PIERS TO REMAIN IN "AREA OF WORK" ARE TO BE PATCHED AND REPAIRED TO RECEIVE NEW FINISHES. 16. GENERAL CONTRACTOR TO PATCH ALL SCAR JOINTS AS REQUIRED ON EXISTING CONSTRUCTION TO REMAIN. 17. ALL ABANDONED POKE THROUGHS IN THE SLAB SHALL BE PATCH AND FILLED PER ALL LOCAL CODES. 18. DEMOLITION CONTRACTOR TO REMOVE ANY AND ALL FLOORING, INCLUDING BUT NOT LIMITED TO VCT, STONE OR ANY OTHER FLOORING IN THE SPECIFIED AREA, INCLUDING REMOVAL OF ANY AND ALL ADHESIVES, AND PRIOR FLASHING IN ORDER TO ACHIEVE A SMOOTH AND LEVEL FLOOR. 19. DEMOLITION CONTRACTOR TO REMOVE ANY AND ALL DOORS, FRAMES AND HARDWARE IN THE EFFECTED AREAS AND CONSULT WITH OWNER FOR ANY DOORS/FRAMES OR HARDWARE FOR REUSE. 20. DEMOLITION CONTRACTOR TO REMOVE ALL CEILINGS AND GRIDS IN EFFECTED AREA AND CONSULT WITH ARCHITECT AS TO THE EXTENT OF REMOVAL OF BLACK IRON SUPPORTS IF THEY EXIST, TO SEE IF ANY CEILING MATERIALS CAN BE REUSED OR COMPLETELY REMOVED. 21. DEMOLITION CONTRACTOR TO REMOVE ANY OR ALL OUTLETS IN ANY EXISTING WALLS, CONVECTORS AND COLUMNS THEN PATCH AS REQUIRED, SO THAT NO VISIBLE ASPECTS OF THOSE DEVICES ARE SHOWN. 22. REMOVE AND CAP ALL ELECTRICAL AND DATA NOT BEING REUSED IN AREAS OF WORK. COORDINATE WITH ELECTRICAL DRAWINGS. 23. ASBESTOS: THE ABATEMENT OF ASBESTOS MATERIAL IS EXCLUDED FROM THIS PROJECT AND WILL BE CONTRACTED SEPARATELY, IF REQUIRED. 24. REUSE OF MATERIAL: GENERAL CONTRACTOR TO REMOVE FROM SITE ALL ITEMS DEEMED NOT REUSABLE BY OWNER. 25. DEMOLITION CONTRACTOR TO VISIT SITE AND UNDERSTAND THE SCOPE OF WORK. SEE DESIGN BUILD M.E.P. FOR ANY ADDITIONAL INFORMATION. 26. DEMOLITION CONTRACTOR MUST KEEP ALL DEBRIS REMOVED FROM SITE SEPARATE FROM THE BUILDING TRASH. 27. PROTECTIVE EYE GOGGLES, CONSTRUCTION HARD HATS AND PROPER CLOTHING MATERIALS MUST BE WORN DURING ANY CUTTING, WHETHER BY HAND OR BY MECHANICAL MEANS. 28. CONTRACTOR TO PROVIDE DUST PROOF, RIGID, BARRIERS, AS APPROPRIATE TO DEFINE VARIOUS SEGMENTS. BARRIERS TO MAINTAIN EXITING, SECURITY, MECHANICAL, FIRE-LIFE SAFETY REQUIREMENTS FOR BUILDING OCCUPANTS. (NOT ALL KEYNOTES MAY BE USED ON THIS SHEET) DEMO FLOOR KEY NOTES NO.DESCRIPTION REV. 1 EXISTING EXTERIOR AWNING AND FRAMEWORK TO BE REMOVED IN ITS ENTIRETY. 2 EXISTING STRING LIGHTS AT PATIO TO BE REMOVED IN THEIR ENTIRETY. 3 EXISTING FENCE AND GATES AT PATIO TO BE REMOVED IN THEIR ENTIRETY. 4 EXISTING LAMP POSTS AT PATIO TO BE REMOVED IN THEIR ENTIRETY. EXISTING ELECTRICAL LINES TO BE RE-ROUTED FOR NEW CONSTRUCTION OR CAPPED IN A SAFE AND PERMANENT MANNER PER CODE REQUIREMENTS. 5 EXISTING AWNING CANVAS OVER BOH DOOR TO BE REMOVED FROM FRAME. EXISTING FRAME TO REMAIN, PREPARE TO RECEIVE NEW AWNING MATERIAL, BY SEPARATE VENDOR. 6 EXISTING AWNING CANVAS OVER EXIT DOOR TO BE REMOVED FROM FRAME. EXISTING FRAME TO REMAIN, PREPARE TO RECEIVE NEW AWNING MATERIAL, BY SEPARATE VENDOR. 7 EXISTING AWNING CANVAS OVER DINING WINDOWS TO BE REMOVED FROM FRAME. EXISTING FRAME TO REMAIN, PREPARE TO RECEIVE NEW AWNING MATERIAL, BY SEPARATE VENDOR. 8 EXISTING EXTERIOR WALL SCONCE FLANKING MAIN ENTRY DOOR TO BE REMOVED IN THEIR ENTIRETY. SEE LIGHTING PLAN FOR NEW WALL SCONCE. 9 EXISTING MAIN ENTRY DOORS TO BE REMOVED IN THEIR ENTIRETY INCLUDING BUT NOT LIMITED TO DOOR LEAF'S AND HARDWARE. PREPARE EXISTING FRAME TO RECEIVE NEW DOOR AND HARDWARE. 10 EXISTING VESTIBULE DOORS TO BE REMOVED IN THEIR ENTIRETY INCLUDING BUT NOT LIMITED TO DOOR LEAF'S AND HARDWARE. PREPARE EXISTING FRAME TO RECEIVE NEW DOOR AND HARDWARE. 11 EXISTING BENCH AT HOST TO BE REMOVED IN ITS ENTIRETY. 12 EXISTING HOST MILLWORK TO BE REMOVED IN ITS ENTIRETY, INCLUDING BUT NOT LIMITED TO HOST CABINET, HOST CREDENZA AND WALL MOUNTED MENU BOXES. 13 EXISTING INTERIOR WALL TO BE REMOVED AS SHOWN FOR NEW CONSTRUCTION INCLUDING BUT NOT LIMITED TO FRAMING, SHEATHING, TRIM, FINISHES AND THE LIKE. 14 EXISTING INTERIOR DOOR TO BE REMOVED IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO DOOR, FRAME, HARDWARE, TRIM AND THE LIKE. 15 EXISTING FLOOR FINISH TO BE REMOVED IN ITS ENTIRETY. EXISTING CONCRETE SLAB TO BE PREPARED TO RECEIVE NEW FINISHES. PROVIDE ALLOWANCE FOR GRINDING AND LEVELING OF SLAB. 16 EXISTING SERVICE STATION TO BE REMOVED IN ITS ENTIRETY. 17 EXISTING BAR TO BE REMOVED IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO THE BAR TOP, DIE WALL, FOOTREST, TRIM AND THE LIKE. UTILITIES ARE TO BE REUSED IN NEW BAR CONSTRUCTION. ANY UTILITY NOT TO BE REUSED TO BE CAPPED IN A SAFE AND PERMANENT MANNER PER CODE. 18 EXISTING BACK BAR TO BE REMOVED IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO CABINETS, COUNTER TOPS, TRIM AND THE LIKE. UTILITIES TO BE REUSED IN NEW CONSTRUCTION. ANY UTILITIES NOT TO BE REUSED TO BE CAPPED IN A SAFE AND PERMANENT MANNER PER CODE. SCALE: 1/4" = 1'-0"D110 1 DEMO FLOOR PLAN DATE ISSUED REG. NO. THIS DOCUMENT IS CERTIFIED BY consultant project title seal project no. sheet title drawn client issue date checked 10 South Eighth Street Minneapolis, MN 55402 t 612_339-2257 sheadesign.com AR00910059 David A. Shea, Architect 2023-05-12 5/16/2023 4:32:52 PMC:\Revit Projects\A22_8778.00-ROOTSTOCK HOSPITALITY_briana-SHEA.rvt8778.00 NC/ BA BA DEMO FLOOR PLAN D110 © 2023 shea, inc. PERMIT 2023-05-12 5ROOTSTOCK HOSPITALITY ABERDEEN 150 W. 96TH STREET INDIANAPOLIS, IN 46260 PROJECT NORTH TRUE NORTH (NOT ALL KEYNOTES MAY BE USED ON THIS SHEET) DEMO FLOOR KEY NOTES NO.DESCRIPTION REV. 19 EXISTING BOOTHS TO BE REMOVED IN THEIR ENTIRETY. 20 EXISTING INTERIOR CONCRETE STAIRS TO BE REMOVED IN THEIR ENTIRETY INCLUDING BUT NOT LIMITED TO POURED CONCRETE STEPS, FINISHED TREADS AND RISERS, EDGE TREATMENTS, AND THE LIKE. 21 EXISTING HANDRAILS TO BE REMOVED IN THEIR ENTIRETY. 22 EXISTING INTERIOR WINDOWS TO BE REMOVED IN THEIR ENTIRETY INCLUDING BUT NOT LIMITED TO GLAZING, FRAME,TRIM AND THE LIKE. PREPARE EXISTING OPENING FOR IN-FILL WALL CONSTRUCTION. 23 EXISTING CONCRETE RAMP TO BE IN-FILLED. CONCRETE AT TOP OF RAMP TO BE REMOVED AS REQUIRED TO RECEIVE IN-FILL MATERIAL AND NEW POURED CONCRETE SLAB. 24 EXISTING WALL SCONCE AT BOOTHS TO BE REMOVED IN THEIR ENTIRETY INCLUDING BUT NOT LIMITED TO THE LAMP, FIXTURE, TRIM AND THE LIKE. REUSE EXISTING ELECTRICAL CIRCUIT AS NEEDED FOR NEW CONSTRUCTION. IF EXISTING CIRCUIT IS NOT TO BE REUSED IT SHALL BE REMOVED OR CAPPED IN A SAFE AND PERMANENT MANNER PER CODE. 25 EXISTING TRIM TO BE REMOVED INCLUDING BUT NOT LIMITED TO WALL CAPS, CROWN AND CHAIR RAIL. 26 EXISTING FLOOR TILE, GROUT, MORTAR AND WALL TILE BASE TO BE REMOVED THIS AREA AS REQUIRED FOR NEW CONSTRUCTION. 27 EXISTING RECESSED WALL LIGHT AT FLOOR TO BE REMOVED IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO FIXTURE, LAMP AND TRIM. ELECTRICAL CIRCUIT TO BE REUSED, CAPPED OR REMOVED IN A SAFE AND PERMANENT MANNER PER CODE. 28 DIAGONAL POCHE INDICATES AREA OF DINNING (UPPER SLAB) TO BE REMOVED. 29 NEW LINE OF DINING (UPPER) CONCRETE SLAB. SEE CONSTRUCTION PLAN. 30 EXISTING POURED CONCRETE STEM WALL AND POURED CONCRETE FOOTING AT TRANSITION OF UPPER AND LOWER ELEVATION CONCRETE SLABS ARE TO BE REMOVED WHERE UPPER SLAB PERIMETER IS ALTERED. 31 EXISTING LOWER (BAR) LEVEL POURED CONCRETE SLAB TO BE REMOVED AS SHOWN FOR NEW CONSTRUCTION. 32 EXISTING OFFICE MILLWORK TO BE REMOVED IN ITS ENTIRETY. PREPARE WALLS TO RECEIVE NEW MILLWORK. 33 EXISTING WALL FINISH IN FORMER TANK ROOM TO BE REMOVED IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO FRP, ADHESIVE, TILE, GROUT, MORTAR AND THE LIKE. PREPARE WALL SURFACE FOR NEW FINISH. PROVIDE ALLOWANCE FOR SKIM COATING GYPSUM BOARD. 34 EXISTING FLOOR TROUGH DRAIN TO BE REMOVED. EXISTING PLUMBING LINE TO BE CAPPED IN A SAFE AND PERMANENT MANNER. VERIFY FULL EXTENT OF EXISTING PLUMBING LINE, SO ALTERATIONS DO NOT COMPROMISE PROPER FUNCTION. 35 EXISTING MOP SINK AND FAUCET TO BE REMOVED IN THEIR ENTIRETY INCLUDING BUT NOT LIMITED TO MOP SINK, SEALANT, FAUCET, TRIM AND THE LIKE. CAP EXISTING PLUMBING LINE IN A SAFE AND PERMANENT MANNER. CONFIRM EXTENT OF EXISTING PLUMBING LINE TO VERIFY ALTERATIONS DO NOT COMPROMISE PLUMBING FUNCTION. (NOT ALL KEYNOTES MAY BE USED ON THIS SHEET) DEMO FLOOR KEY NOTES NO.DESCRIPTION REV. 36 EXISTING PLUMBING FIXTURE TO BE REMOVED IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO FIXTURE, FLUSH VALVE, FAUCET, TRIM AND THE LIKE. PLUMBING LINE TO BE REUSED FOR NEW PLUMBING FIXTURES. 37 EXISTING RESTROOM LAVATORY TO BE REMOVED IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO FINISHED SURFACE, APRON, SUBSTRATE AND THE LIKE. 38 EXISTING RESTROOM TOILET PARTITIONS TO BE REMOVED IN THEIR ENTIRETY INCLUDING BUT NOT LIMITED TO PANELS, DOORS, SUPPORTS, DOORS, STIRRUPS AND THE LIKE. 39 EXISTING RESTROOM TOILET ACCESSORIES TO BE REMOVED IN THEIR ENTIRETY. VERIFY WITH OWNER ANY ITEMS TO BE SAVED. 40 EXISTING RESTROOM WALL FINISHES TO BE REMOVED IN THEIR ENTIRETY INCLUDING BUT NOT LIMITED TO WALL TILE, GROUT, MORTAR, WALL COVERING AND THE LIKE. PREPARE WALL SURFACE FOR NEW FINISHES. 41 EXISTING OUTLET FOR BEER LINES FROM FORMER TANK ROOM TO BE CAPPED IN A SAFE AND PERMANENT MANNER PER CODE. no. date issued for