Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Demo Ceiling Plan
ABCDEFGHJKLMNP 1 1 2 3 3 4 5 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2 2 2 2 1 2 2 2 2 2 1 3 4 5 3 3 5 5 5 5 66 7 7 77 7 7 7 4 4 44 8 8 8 8 4 4 4 4 5 5 5 28'-9 1/4"5'-6"2'-0" 7 7 7 5 7 3 3 3 3 5 5 7 7 5 7 5 7 4 8 8 4 9 9 9 9 5 7 5 7 10 5 11 11 11 11 11 11 11 12 12 12 12 12 12 12 13 13 13 13 13 13 13 14 14 14 14 14 15 15 16 16 17 17 15 17 16 15 16 16 16 15 17 15 1715 18 19 20 18 DEMOLITION NOTES 1. SEE ALL DRAWINGS FOR ADDITIONAL NOTES AND SPECIFICATIONS. 2. GENERAL CONTRACTOR TO COORDINATE ALL PHASES OF DEMOLITION FOR PROJECT AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES OR CONFLICTING CONDITIONS WHICH WOULD INTERFERE WITH THE SATISFACTORY COMPLETION OF THE WORK, PRIOR TO THE START OF DEMOLITION. 3. GENERAL CONTRACTOR TO PROVIDE TEMPORARY POWER AND LIGHTING THROUGHOUT COURSE OF JOB WHERE REQUIRED. 4. FIRE AND SMOKE DETECTION SYSTEM (EXISTING) TO REMAIN IN OPERATION DURING DEMOLITION AND CONSTRUCTION INCLUDING ALL STROBES. 5. DO NOT REMOVE ANY BUILDING CLASS "E" FIRE PROTECTION SIGNALS OR EQUIPMENT, UNLESS OTHERWISE NOTED. PROTECT AS REQUIRED FOR DURATION OF THE JOB. 6. SEE DESIGN BUILD M.E.P. DRAWINGS AND NOTES FOR ADDITIONAL DEMOLITION REQUIREMENTS WHEN REFERRING TO HVAC, SPRINKLER, PLUMBING, ELECTRICAL, FIRE ALARM AND COMMUNICATION. 7. ANY AND ALL ELECTRICAL/DATA AND TELEPHONE DEVICES, WIRING, CABLES , CONDUITS, ETC. TO BE REMOVE SHALL BE REVIEWED BY BUILDING MANAGEMENT, CLIENT CONSULTING ENGINEER AND ANY OTHER CONSULTANT DEEMED NECESSARY PRIOR TO ANY WORK. 8. ANY REMOVAL OF SUCH ELECTRICAL EQUIPMENT SHALL BE DONE IN SUCH A WAY AS TO ALLOW THE OPERATIONS OF ADJACENT FLOORS TO CONTINUE WITHOUT INTERRUPTION OF ANY SERVICE DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NEEDED IN ORDER TO COMPLY WITH THIS REQUIREMENT. 9. PRIOR TO DEMOLITION, G.C. TO REVIEW WITH VOICE/DATA CONSULTANT FOR THE REMOVAL OF ANY AND ALL VOICE/DATA CONDUIT, CABLES AND EQUIPMENT. 10. GENERAL CONTRACTOR IS RESPONSIBLE FOR DEMOLITION AND REMOVAL OF ALL DEBRIS AND DISCARDED MATERIALS AND/OR EQUIPMENT AS INDICATED WITHIN THE SPACE. 11. GENERAL CONTRACTOR TO COORDINATE WITH THE CLIENT AS TO THE PROTECTION AND/OR STORAGE OF ANY ITEMS TO BE SAVED FROM DEMOLITION. 12. GENERAL CONTRACTOR IS RESPONSIBLE TO PROTECT ALL EXISTING ITEMS TO REMAIN (I.E. PLUMBING FIXTURES, WINDOWS, CONVECTOR COVERS, ETC.) THROUGHOUT THE COURSE OF THE JOB. 13. GENERAL CONTRACTOR MUST PROVIDE ALL REQUIRED PROTECTION TO ALL SURROUNDING AREAS THROUGHOUT COURSE OF THE DEMOLITION AND CONSTRUCTION. DEMOLITION NOTES 14. GENERAL CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REPLACE ANY DAMAGE IN THE SURROUNDING AREAS CAUSED BY DEMOLITION AND CONSTRUCTION IN "AREA OF WORK". 15. ALL EXISTING WALLS, COLUMNS, AND PERIMETER PIERS TO REMAIN IN "AREA OF WORK" ARE TO BE PATCHED AND REPAIRED TO RECEIVE NEW FINISHES. 16. GENERAL CONTRACTOR TO PATCH ALL SCAR JOINTS AS REQUIRED ON EXISTING CONSTRUCTION TO REMAIN. 17. ALL ABANDONED POKE THROUGHS IN THE SLAB SHALL BE PATCH AND FILLED PER ALL LOCAL CODES. 18. DEMOLITION CONTRACTOR TO REMOVE ANY AND ALL FLOORING, INCLUDING BUT NOT LIMITED TO VCT, STONE OR ANY OTHER FLOORING IN THE SPECIFIED AREA, INCLUDING REMOVAL OF ANY AND ALL ADHESIVES, AND PRIOR FLASHING IN ORDER TO ACHIEVE A SMOOTH AND LEVEL FLOOR. 19. DEMOLITION CONTRACTOR TO REMOVE ANY AND ALL DOORS, FRAMES AND HARDWARE IN THE EFFECTED AREAS AND CONSULT WITH OWNER FOR ANY DOORS/FRAMES OR HARDWARE FOR REUSE. 20. DEMOLITION CONTRACTOR TO REMOVE ALL CEILINGS AND GRIDS IN EFFECTED AREA AND CONSULT WITH ARCHITECT AS TO THE EXTENT OF REMOVAL OF BLACK IRON SUPPORTS IF THEY EXIST, TO SEE IF ANY CEILING MATERIALS CAN BE REUSED OR COMPLETELY REMOVED. 21. DEMOLITION CONTRACTOR TO REMOVE ANY OR ALL OUTLETS IN ANY EXISTING WALLS, CONVECTORS AND COLUMNS THEN PATCH AS REQUIRED, SO THAT NO VISIBLE ASPECTS OF THOSE DEVICES ARE SHOWN. 22. REMOVE AND CAP ALL ELECTRICAL AND DATA NOT BEING REUSED IN AREAS OF WORK. COORDINATE WITH ELECTRICAL DRAWINGS. 23. ASBESTOS: THE ABATEMENT OF ASBESTOS MATERIAL IS EXCLUDED FROM THIS PROJECT AND WILL BE CONTRACTED SEPARATELY, IF REQUIRED. 24. REUSE OF MATERIAL: GENERAL CONTRACTOR TO REMOVE FROM SITE ALL ITEMS DEEMED NOT REUSABLE BY OWNER. 25. DEMOLITION CONTRACTOR TO VISIT SITE AND UNDERSTAND THE SCOPE OF WORK. SEE DESIGN BUILD M.E.P. FOR ANY ADDITIONAL INFORMATION. 26. DEMOLITION CONTRACTOR MUST KEEP ALL DEBRIS REMOVED FROM SITE SEPARATE FROM THE BUILDING TRASH. 27. PROTECTIVE EYE GOGGLES, CONSTRUCTION HARD HATS AND PROPER CLOTHING MATERIALS MUST BE WORN DURING ANY CUTTING, WHETHER BY HAND OR BY MECHANICAL MEANS. 28. CONTRACTOR TO PROVIDE DUST PROOF, RIGID, BARRIERS, AS APPROPRIATE TO DEFINE VARIOUS SEGMENTS. BARRIERS TO MAINTAIN EXITING, SECURITY, MECHANICAL, FIRE-LIFE SAFETY REQUIREMENTS FOR BUILDING OCCUPANTS. (NOT ALL KEYNOTES MAY BE USED ON THIS SHEET) DEMO CEILING KEY NOTES NO.DESCRIPTION REV. 1 EXISTING WALL SCONCE FLANKING MAIN ENTRY DOORS TO BE REMOVED IN THEIR ENTIRETY. PREPARE AREA TO RECEIVE NEW SCONCES. 2 SEE D110 FOR NOTES REGARDING REMODEL OF EXISTING AWNING FRAMES AND/ OR CANVAS. 3 EXISTING PENDANT LIGHT TO BE REMOVED IN ITS ENTIRETY. EXISTING CIRCUIT TO BE RE-USED FOR NEW FIXTURE. 4 EXISTING WALL/ CEILING MOUNTED TV MOUNTING BRACKET TO BE REMOVED IN ITS ENTIRETY. VERIFY REUSE WITH OWNER. 5 EXISTING ACT CEILING TO BE REMOVED IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO GRID, GRID SUPPORTS, CEILING TILES AND THE LIKE. 6 EXISTING GYPSUM BOARD CEILING/ SOFFIT TO BE REMOVED IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO GYPSUM BOARD, TRIM, SUPPORTS AND THE LIKE. 7 EXISTING RECESSED LIGHTING IN EXISTING CEILING TO BE REMOVED SHALL BE REMOVED IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO LAMP, HOUSING, TRIM AND THE LIKE. EXISTING CIRCUITS TO BE REUSED/ REROUTED FOR NEW CONSTRUCTION. 8 EXISTING WALL SCONCE TO BE REMOVED IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO LAMP, HOUSING, TRIM AND THE LIKE. EXISTING CIRCUITS TO BE REUSED/ REROUTED FOR NEW CONSTRUCTION. 9 EXISTING COFFERED CEILING TO BE REMOVED IN ITS ENTIRETY INCLUDING BUT NOT LIMITED TO FRAMING, SUPPORTS, FINISHES AND THE LIKE. 10 WHERE EXISTING CEILING IS REMOVED AND NO FINISHED CEILING IS SCHEDULED, REMOVE ALL ABANDONED UTILITIES FROM FORMER TANK ROOM NOT TO BE REUSED. PREPARE EXISTING STRUCTURE ABOVE TO BE PAINTED. 11 EXISTING SPEAKERS IN CEILINGS TO BE REMOVED ARE TO BE REMOVED. LOW VOLTAGE CIRCUITS ARE TO BE REUSED FOR NEW SPEAKER LAYOUT. VERIFY LOCATIONS WITH OWNER AV VENDOR. 12 EXISTING HVAC DIFFUSERS IN CEILINGS TO BE REMOVED ARE TO BE REMOVED. MECHANICAL CONTRACTOR TO COORDINATE RELOCATION OF DIFFUSERS IN NEW CEILING DESIGN WITH ARCHITECT AND OWNER. 13 EXISTING SPRINKLER HEADS IN CEILINGS TO BE REMOVED ARE TO BE REMOVED. MECHANICAL CONTRACTOR TO COORDINATE RELOCATION OF SPRINKLER HEADS IN NEW CEILING DESIGN. SCALE: 1/4" = 1'-0"D120 1 DEMO CEILING PLAN DATE ISSUED REG. NO. THIS DOCUMENT IS CERTIFIED BY consultant project title seal project no. sheet title drawn client issue date checked 10 South Eighth Street Minneapolis, MN 55402 t 612_339-2257 sheadesign.com AR00910059 David A. Shea, Architect 2023-05-12 5/16/2023 4:32:54 PMC:\Revit Projects\A22_8778.00-ROOTSTOCK HOSPITALITY_briana-SHEA.rvt8778.00 NC/ BA BA DEMO CEILING PLAN D120 © 2023 shea, inc. PERMIT 2023-05-12 6ROOTSTOCK HOSPITALITY ABERDEEN 150 W. 96TH STREET INDIANAPOLIS, IN 46260 PROJECT NORTH TRUE NORTH (NOT ALL KEYNOTES MAY BE USED ON THIS SHEET) DEMO CEILING KEY NOTES NO.DESCRIPTION REV. 14 EXISTING WALL SCONCE AT PATIO TO BE REMOVED. REUSE JUNCTION BOX FOR NEW SCONCE, SEE LIGHTING PLAN A130. 15 EXISTING CEILING MOUNTED EMERGENCY LIGHT TO BE REMOVED IN ITS ENTIRETY. 16 EXISTING EMERGENCY STROBE TO BE REMOVED IN ITS ENTIRETY. 17 EXISTING EXIT LIGHT TO BE REMOVED IN ITS ENTIRETY. 18 EXISTING TRACK LIGHT TO BE REMOVED IN ITS ENTIRETY. 19 EXISTING EMERGENCY LIGHT TO BE REMOVED IN ITS ENTIRETY. 20 EXISTING EMERGENCY STROBE TO BE REMOVED IN ITS ENTIRETY. no. date issued for