Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Finish Plan
ABCDEFGHJKLMNP 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 101 ENTRY VESTIBULE 104 A / V 103 COATS 102 HOST / WAITING 108 BACK BAR 121 PATIO 107 BAR DINING 01 119 PRIVATE DINING 112 FLEX 114 WOMEN'S RESTROOM 115 MEN'S RESTROOM 111 DINING 109 BAR DINING 02 116 EXPO EXTG B.O.H. 106 LIFT 117 OFFICE 105 WINE 01 110 WINE 02 EXTG LIQUOR STORAGE EXTG EMPLOYEE RESTROOM EXTG MECH/ELEC 16'-4"2'-0"13'-7"18'-7 1/2"3'-11 1/2"4'-8"20'-3"14'-5"1'-4"13'-4"5'-2"3'-0"4'-8" 121'-4"1'-4"3'-8"1'-4"2'-0"1'-0"5'-10"5'-3"9'-0"4'-10"5'-4"13'-11"3'-1"11'-11"11 1/2"5'-2 1/2"1'-4"5'-2"1'-4"9'-0"5'-0"86'-6"SEE ELEV2 WDB-13 RESF-24 SPF-11 PT-32 WDB-13 RESF-34 SEE RCP1 SEE ELEV2 WDB-13 TL-14 ACT-11 RESF-14 RESF-14 SEE ELEV2 WDB-13 RESF-24 SPF-11 RESF-14 ST-24 EXST2 EXST3 EXST4 ACT-21 EXST2 EXST3 EXST4 ACT-21 EXST2 EXST3 EXST4 ACT-21 EXST2 EXST3 EXST4 ACT-21 EXST2 EXST3 EXST4 ACT-21 EXST2 EXST3 EXST4 ACT-31 PT-12 RESB-13 EXST4 ACT-21 EXST2 EXST3 EXST4 ACT-21 EXST2 EXST3 EXST4 ACT-31 EXST2 EXST3 EXST4 EXST1 EXST2 EXST3 EXST4 EXST1 EXST2 EXST3 EXST4 ACT-21 SEE ELEV2 SEE ELEV3 TL-84 PT-41 SEE ELEV2 SEE ELEV3 TL-84 PT-41 PT-22 WDB-13 TL-84 PT-21 SEE ELEV2 WDB-13 TL-14 SEE RCP1 MTL-14 PT-12 RESB-13 TL-14 ACT-21 FRP-22 TLB-13 TL-54 SEE RCP1 SEE ELEV2 WDB-13 TL-14 SEE RCP1 PT-22 WDB-23 CONC-14 SEE RCP1 TL-124 PT-22 WDB-23 TL-124 SEE RCP1 SEE ELEV2 SEE ELEV3 EXST4 EXT-111 SEE ELEV2 WDB-13 TL-14 PT-1 ACT-11 ACT-11 BRK-22 TL-72 TL-62 WD-62 RESF-24 TL-124 TL-94 TL-94 TL-94 TL-44 TL-34 TL-34 TL-24 BRK-22 RESF-24 TL-34 MTL-14 TL-14 TL-34 MTL-14 RESF-14 MTL-14 MTL-14 MTL-14 TL-14 TL-34 TL-34 TL-34 TL-34 MTL-24 MTL-14 TL-24 TL-24 MTL-24 MTL-24 WDB-13 TL-14 EXST3 EXST4 MTL-14 MTL-14 TL-14 TL-14 MTL-14 MTL-14 TL-34 MTL-14 MTL-148'-11"1/4"9'-0"1/4"7'-11 1/2"1/4"7'-11 1/2"1/4"9'-0"1/4"EQ 20'-0"EQEQ10'-0"EQTL-14 ALIGN 1'-0"1'-0"1'-0"ALIGNALIGN3'-0" TL-14 ALIGN 1'-0"1'-0"1'-0"1'-0"1'-0"1'-3"1'-2 3/4" 1'-11 1/4"5'-0"1'-10 3/4"9'-0"1'-0 3/4"1'-0"1'-0"6"1'-6"1'-6"6"6"1'-6"6"1'-6"6"2'-0"6"1'-6"3'-0"ALIGNWD-94 1 4 3 2 2 ST-24 1'-0"1'-0"1'-8"2'-1 1/2"2'-1 1/2"1'-8" 2'-0" 5 5 5 ST-24 TL-84 1'-10 5/8"1'-10 5/8"135.00°1 3 5 .0 0 °FINISH PLAN SYMBOLS 1 = CEILING FINISH TYPE 2 = WALL FINISH TYPE 3 = BASE FINISH TYPE 4 = FLOOR FINISH TYPE NOTE: SEE PROJECT MANUAL OR SPECIFICATION SHEET FOR MORE INFORMATION. DENOTES EXTENT OF FLOOR MATERIAL DENOTES EXTENT OF WALL FINISH PT-12 BS-13 CPT-14 ACT-11 BS-1 CPT-2CPT-1 1. ALL INTERIOR WALL AND CEILING FINISHES SHALL BE CLASSIFIED IN ACCORDANCE WITH ASTM E-84. FINISHES SHALL BE CLASS "A": FLAME SPREAD 0-25: SMOKE- DEVELOPED 0-45. 2. ALL EXISTING GYPSUM BOARD CEILINGS, SOFFITS AND DRYWALL PARTITIONS THAT ARE PATCHED SHALL BE PAINTED IN THEIR ENTIRETY. 3. GENERAL CONTRACTOR SHALL FLASH PATCH AND PREPARE ALL FLOORS AS REQUIRED TO RECEIVE SPECIFIED FLOORING MATERIAL. 4. FLOORS MUST BE FREE OF DUST, OIL AND ALL FOREIGN MATTER. BUILDING MUST BE PREHEATED TO A MINIMUM OF 65°, 24 HOURS PRIOR TO INSTALLATION OF FLOOR COVERING. CRACKS 1/16" OR MORE, HOLES, AND OTHER UNEVENNESS MUST BE FILLED WITH A LATEX BASE FLOOR FILLER, HIGH SPOTS MUST BE LEVELED. FLOOR MUST BE SWEPT CLEAN, WET MOPPED WITH WARM WATER AND SWEPT AGAIN. IF SWEEPING LEAVES A RESIDUE, FLOORS SHALL BE VACUUMED. 5. GENERAL CONTRACTOR TO PROVIDE AND INSTALL ALL METAL ANGLES AND/OR MARBLE REDUCING SADDLES PER DETAILS, IN ADDITION TO ANY FLOOR LEVELING AS MAY BE REQUIRED FOR SMOOTH TRANSITION AT ALL STONE OR TILE FLOORING/MATERIAL TRANSITION POINTS. 6. WHERE STONE, MARBLE, LIMESTONE AND HARD SURFACE FLOORING IS SPECIFIED, G.C. SHALL BE RESPONSIBLE FOR PROVIDING/APPLYING SEALANT AS SPECIFIED OR AS RECOMMENDED BY SUPPLIER, FOR A CLEAN, LASTING SURFACE. 7. IN AREAS WITH EXPOSED OPEN CEILINGS, GENERAL CONTRACTOR AND THEIR SUBCONTRACTORS ARE TO PAINT ANY AND ALL EXPOSED SPRINKLER PIPES, CEILING SLABS, BEAMS AND IF NEEDED PATCH CEILING SLAB SMOOTH TO RECEIVE NEW FINISHES. REFER TO FINISH PLAN FOR ADDITIONAL INFORMATION AND SPECIFICATIONS. 8. PAINTING OF ANY SURFACES NOT SPECIFICALLY MENTIONED TO BE PAINTED HEREIN OR ON DRAWINGS, BUT FOR WHICH PAINTING IS OBVIOUSLY NECESSARY TO COMPLETE THE PROJECT OR WORK WHICH COMES WITHIN THE INTENT OF THESE SPECIFICATIONS, SHALL BE INCLUDED AS THROUGH SPECIFIED AND INCLUDED IN SCOPE OF WORK OF CONTRACTOR WITHOUT EXCEPTIONS. 9. ALL WALLS (NEW AND EXISTING) SHALL BE PROPERLY PREPARED (SPACKLED, SANDED, ETC.) FOR PAINTING AND/OR WALL COVERING AS PER FINISH PLAN AND MANUFACTURER'S SPECIFICATIONS. 10. ALL PAINTS SHALL BE APPLIED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS FOR THE PARTICULAR SURFACE. FINISH PLAN NOTES 11. ALL SURFACES WHICH ARE TO BE PAINTED SHALL RECEIVE (1) COAT OF PRIMER AND (2) COATS OF FINISH PAINT. (3) COATS TOTAL. NOTE THAT BOTH CONTRACTOR AND ITS PAINTING SUBCONTRACTOR TO INCLUDE IN SCOPE OF WORK PAINT TOUCH UP DUE TO ANY DAMAGE DONE DURING CONSTRUCTION AS CAUSED BY NO FAULT OF THE PAINTING SUBCONTRACTOR BUT WHICH MIGHT OF BEEN CAUSED BY OTHER TRADES, INCLUDING BUT NOT LIMITED TO CONSTRUCTION TRADES, VOICE/DATA AND SECURITY CONTRACTOR AND INCLUDING FURNITURE INSTALLERS AND MOVERS. CONTRACTOR AND PAINTING SUBCONTRACTOR TO INCLUDE PAINT TOUCH UP WITHIN THEIR SCOPE OF WORK WITHOUT EXCEPTION OR EXCLUSION FROM BIDS. 12. ALL CONVECTOR ENCLOSURES TO BE PAINTED SHALL HAVE THE GRILLES AND ACCESS PANELS REMOVED AND PAINTED SEPARATELY AND REINSTALLED WHEN THOROUGHLY DRY. 13. ALL DOORS AND FRAMES TO BE PAINTED THE SAME COLOR AND TYPE OF PAINT ON BOTH SIDES, UNLESS OTHERWISE NOTED. 14. ALL WALLS, CEILINGS, SOFFITS AND SURFACES WHICH HAVE BEEN PAINTED WITH AN EGGSHELL FINISH AND MUST BE TOUCHED UP AS A PUNCH LIST ITEM SHALL BE REPAINTED ENTIRELY BETWEEN THE (2) CLOSEST BREAK POINTS. 15. SAMPLES OF ALL FINISHES SPECIFIED SHALL BE SUBMITTED TO THE ARCHITECT FOR APPROVAL, IN TRIPLICATE, PRIOR TO COMMENCEMENT OF THE WORK. CARPET, WALL COVERING, AND WOOD FINISH SAMPLES TO BE A MIN. 12" X 12". PAINT SAMPLES FOR GYPSUM BOARD. SURFACES TO BE PROVIDED ON 12"X12" PIECES OF GYPSUM BOARD. 16. GENERAL CONTRACTOR IS RESPONSIBLE TO THOROUGHLY VACUUM CLEAN ALL CARPETED AREAS, CLEAN ALL FLOORING, MILLWORK, ETC, AND UNCOVER AND VACUUM OUT ALL CONVECTOR UNITS AFTER THE INSTALLATION IS COMPLETED, AND MAINTAIN CONDITION THROUGH THE TENANT'S MOVE IN THE ENTIRE POST- CONSTRUCTION SITE IS TO BE DUST FREE AND ALL STAINS REMOVED FROM ANY FLOORING, WALLS AND/OR CEILINGS. WATERPROOF MEMBRANE SYSTEM: IN RESTROOMS, KITCHENS, & OTHER FOOD PREP AREAS -PROVIDE BOSTIC-USA HYDROMENT BLACK TOP MEMBRANE SYSTEM. ALTERNATE APPROVED PRODUCT IS LATICRETE 9235 WATERPROOF SYSTEM. MEMBRANE SYSTEM TO PROJECT UP WALL 4” AND OUT FROM WALL 16”AT SLAB ON GRADE CONDITIONS AND TO FULLY COVER FLOOR SURFACE ABOVE OCCUPIED SPACES. REFER TO PARTITION TYPE SHEET FOR ADDITIONAL INFORMATION. EXTRA MATERIALS: 1. PROVIDE EXTRA MATERIALS AS NOTED IN SPECIFICATIONS. 2. PROVIDE 1 GALLON OF EACH FLOOR CLEANER. PROTECTION MATERIALS: 1. DO NOT PERMIT TRAFFIC OVER FINISHED FLOOR SURFACE FOR 4 DAYS AFTER INSTALLATION. 2. PROVIDE TWO LAYERS OF CRAFT PAPER OVER ALL TILE AND GROUT ON FLOORS. TAPE DOWN AND STAGGER SEAMS BY HALF THE WIDTH ON SECOND LAYER. SCALE: 1/4" = 1'-0"A140 1 FINISH PLAN (NOT ALL KEYNOTES MAY BE USED ON THIS SHEET) FINISH KEY NOTES NO.DESCRIPTION REV. 1 POWER WASH EXISTING CONCRETE FLOOR TO REMOVE DIRT, STAINS, ETC. 2 USE FULL WIDTHS OF FLOORING PLANKS. 3 USE FULL PATTERN REPEATS. SEE IMAGE ON A191. 4 NEW TILE TO ALIGN WITH GROUT LINE OF EXISTING TILE. 5 SEE A191 FOR PATTERN. 6 WALL TILE TO EXTEND TO EXISTING STAINLESS STEEL ON WALL. DATE ISSUED REG. NO. THIS DOCUMENT IS CERTIFIED BY consultant project title seal project no. sheet title drawn client issue date checked 10 South Eighth Street Minneapolis, MN 55402 t 612_339-2257 sheadesign.com AR00910059 David A. Shea, Architect 2023-05-12 5/16/2023 4:29:52 PMC:\Revit Projects\A22_8778.00-ROOTSTOCK HOSPITALITY_briana-SHEA.rvt8778.00 NC KL FINISH PLAN A140 © 2023 shea, inc. PERMIT 2023-05-12 12ROOTSTOCK HOSPITALITY ABERDEEN 150 W. 96TH STREET INDIANAPOLIS, IN 46260 PROJECT NORTH TRUE NORTH 6 6 no. date issued for