Loading...
HomeMy WebLinkAboutStormwater Narrative - College Park Prayer Path Designing The Future Stormwater Narrative College Park Church Prayer Path & Volleyball Courts 2606 W. 96th Street Carmel, Indiana MERITCORP PROJECT NUMBER: M20027 Date: June 5, 2023 Owner/Developer: College Park Church 2606 W. 96th Street Carmel, Indiana Prepared for: Aspen Group 9645 Lincoln Way Lane, Suite 201 Frankfort, Illinois 60423 Prepared by: MeritCorp Group, LLC 4222 Meridian Parkway, Suite 112 Aurora, Illinois 60504 www.meritcorp.com College Park Church Prayer Path & Volleyball Courts Carmel, Indiana Stormwater Narrative The proposed development will include the construction of an 8’ wide asphalt prayer path around the perimeter of the site and the construction of two sand volleyball courts at the northwesternmost corner of the subject site. Per the record drawings and the report by Schneider Corporation dated March 3, 2010 (2010 Report), the prayer path was part of the original development plan for the subject site and was labeled “future prayer path”. In total, 0.31 acres of asphalt path is proposed, and the volleyball courts will be roughly 0.18 acres. Generally, the proposed path will follow the original layout and/or intent to the extent possible. The Church has also proposed a path alternative and increasing the total path area to 0.32 acres (0.01 acre increase). The grading of the path and the courts the will roughly follow the existing grade so the hydrologic disturbance/disruption of the actual site is negligible. The volleyball courts will have an underdrain that will drain south/southeast and discharge to the existing drainage swale located northwest of the gravel parking lot area. Per a meeting with the City of Carmel engineering department staff on June 3rd, MeritCorp has reviewed the impact of the development to detention. The 2010 report noted above, was for the development of the gravel parking lot addition located near the northwest corner of the subject site and part of Drainage Area “DB North” that drains to the northwesternmost dry detention basin. The 2010 Report indicates the gravel lot was planned to be paved as part of the original development and utilizing gravel would reduce the Curve Number (CN) utilized for the detention design from 84.92 to 84.02 (The original report is not available to confirm the original areas). Below is the breakdown of the CN calculations from the 2010 report (the areas from the report have been added in Red for ease of the review). Utilizing the record information available, the proposed areas for “DB North” were determined. For simplicity, the Outdoor Venue project impervious areas have been excluded from the calculation because those areas were addressed and approved with the added volume in the detention basin. The areas for the existing gravel parking lot, existing asphalt parking lot were generally confirmed but adding the proposed path in “DB North” (0.26 of the 0.31 acres mentioned above) is slightly higher at 5.66 acres (Refer to the attached Overall Drainage Area exhibit). Based on the 5.44 acres of impervious area noted in the 2010 Report, it can be concluded the 0.26 acres of path was not included in their analysis of “DB North”. The original report is not available to confirm if the College Park Church Prayer Path & Volleyball Courts Carmel, Indiana Stormwater Narrative path was part of the 8.05 acres listed for the original overall development. Conservatively, the CN was calculated with the additional impervious area and the revised CN is 84.32 and below the original 84.91 (see the CN calculation below). As noted above, a majority of the proposed path, 0.26 acres of the 0.31 total acres, is part of drainage area DB North and tributary to the northwesternmost basin. As noted in the 2010 report all the basins are hydraulically connected. Conservatively, to account for the additional proposed path area of 0.05 acres (or 0.31 acres total) was added to the CN as additional impervious area for DB North. The CN was calculated to be 84.39 and below the original 84.91 indicating the existing detention system should have adequate capacity. Given the proposed CN being below the originally designed CN, stormwater detention is not included with this project. As noted previously, the 8’ wide path will have negligible impact to the runoff flow paths draining through the primarily large pervious surfaces adjacent to the path. College Park Church Prayer Path & Volleyball Courts Carmel, Indiana Stormwater Narrative APPENDIX 1 Overall Drainage Area Exhibit and Curve Number Calculations area not analyzed aspart of this reportDB NORTH14.63 ACRESOVERALL DRAINAGE AREA DRAINAGE SUMMARYSUBJECT SITE AREA:14.63 ACRESPROPOSED IMPERVIOUS AREA:4.66 ACRESPROPOSED GRASS AREA:4.72 ACRESPROPOSED WOODS AREA:1.61 ACRESPROPOSED GRAVEL AREA:2.63 ACRESNORTH1" = 60'GRAPHIC SCALEEXISTING INFORMATION ON THIS SHEET SHOWN PERRECORD DRAWINGS PREPARED BY SCHNEIDERCORPORATION DATED 12/18/2009 FOR REFERENCE ONLY.ALL EXISTING INFORMATION SHALL BE FIELD VERIFIED.1 /1DATE: DESCRIPTION: eritCorpM G R O U P , L L C06-02-2023 ISSUED DRAFT FOR REVIEW COPYRIGHT C 2023COLLEGE PARK CHURCH PRAYER PATH 2606 WEST 96TH STREET CARMEL, INDIANA FINAL ENGINEERING PLANPROJECT NO. M20027 eritCorpM G R O U P , L L CDRAWN BY: ZDSCHECKED BY: CLSSHEET NO. eritCorp Engineering - Planning - Surveying - Environmental M G R O U P , L L C Other Office Locations: Gurnee, IL 4222 Meridian Parkway, Suite 112 Aurora, IL 60504 Office 630.554.6655 Lic. No. 184-005860 www.meritcorp.com MeritCorp Project Number: M20027 June 5, 2023 Prepared By: CLS Checked By: CLS Cover Type Area (acres) Hydrologic Soil Group Curve Number Product (CN) x (Area) Impervious Area 5.66 C 94 532.04 Grass (Good Condition) 4.73 C 74 350.02 Woods (Fair Condition) 1.61 C 73 117.53 Gravel 2.63 C 89 234.07 Total 14.63 1233.66 Weight CN= Cover Type Area (acres) Hydrologic Soil Group Curve Number Product (CN) x (Area) Impervious Area 5.71 C 94 536.74 Grass (Good Condition) 4.68 C 74 346.32 Woods (Fair Condition) 1.61 C 73 117.53 Gravel 2.63 C 89 234.07 Total 14.63 1234.66 Weight CN= DB North Entire Proposed Path Area Total Product= Total Area 84.39 CN Number Calculation Carmel, IN College Park Church Prayer Path Total Product= Total Area 84.32 DB North Proposed Path Area Only College Park Church Prayer Path & Volleyball Courts Carmel, Indiana Stormwater Narrative APPENDIX 2 Record Report by Schneider Corporation dated March 3, 2010