Loading...
HomeMy WebLinkAboutHoward Asphalt, LLC/STREET/$4,537.50/CO #4/23-STR-01 DocuSign Envelope ID:CEFE5496-6DF4-4883-B29B-BA4996E2D8A3 City of Carmel Project 23-STR-01 Paving Program APPROVED By Sergey Grechukhin at 1:15 pm,Jun 06,2023 Change Order #4 — Additional MOT (CC&T) Change Order# 4 is additional MOT for CC&T. Contract Price prior to this Change Order $ 3,762,718.16 Contract Price will be increased/decreased by this Change Order $ 4,537.50 New Contract Price including this Change Order $ 3,767,255.66 Adjusted Contract Cumulative Amount Price Change from Original Contract Original Contract $ 3,641,478.16 N/A Additional MOT for $ 15,070.00 $ 3,656,548.16 0.41 % CC&T Additional Concrete $ 28,545.00 $ 3,685,093.16 1.20% Drive Line Items Additional Plunge Mill $ 77,625.00 S 3,762,718.16 3.33 Line Item Additional MOT for $ 4,537.50 $ 3,767,255.66 3.45 % CC&T DocuSign Envelope ID:CEFE5496-6DF4-4883-B29B-BA4996E2D8A3 CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.: 4 DATE: 05/15/23 PROJECT NAME: 23-STR-01 Paving Program CITY REQ. NO.: N/A CITY PO NO.: 108575 CITY PO DA I L: 03/02/2023 L You are directed to make the following changes in this Contract: Change Order#3 is an additional plunge mill line item SCHEDULED ADJUSTMENT ITEM AMOUNT (+) OR(-) DAYS Additional MOT for CC&T $ 4,537.50 0 II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C. No.: N/A Other: See attached proposals The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $_3,762,718.16 Contract Price will be increased/decreased by this Change Order $ 4,537.50 New Contract Price including this Change Order $_3,767,255.66 Contract Time Prior to this Change Order N/A Days N/A Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order 126 Days 8/09/23 Completion Date This Change Order is for full and final settlement of all direct,indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. Version 2016-08-31 DocuSign Envelope ID:CEFE5496-6DF4-4883-B29B-BA4996E2D8A3 "—DoneSigned by: City of Carmel Howard Asphalt LLC Al) / j STREET CONTRACTOR `TaYfieT1 ginard, Mayor 1 Civic Square 2916 Kentucky Ave DocuSigned by: al . t Address Address 'tvta °A4t 14Burke, Member (—Do Signed by: Carmel, IN 46023 Indianapolis, IN 46221Lovi 00asot& City/State/Zip City/State/Zip 1,o7r argon, Member 7 i// i7V. !d�ZG�iZ Matt Higginbe i am, Commissioner, Street Department ��GC�[� BY: Mike Parrish�� _�kepa,m7 Matt Higgi i:tham Phone: 317-733-2001 Phone: _ ATTESIOOSigned by: -c- Date: 05/15/2023 Date: 1�J"1 WA °"3 '-68 9D7A9844C5 Sue Woltu a Clerk 6/ 23 Date: Version 2016-08-31 DocuSign Envelope ID:CEFE5496-6DF4-4883-B29B-BA4996E2D8A3 HOI '/ARD 2916 Kentucky Avenue Indianapolis, Indiana 46221 COMPANIES / www.HowardCornpanies.corn REQUEST FOR C 1NGE Project: 23-STR-01 Paving Program Address: Carmel, Indiana RFC# 4 Date: 5/4/2023 Owner/Contractor: City of Carmel-Street Department Project# 23-1161 Submitted To: Matt Higginbotham PO# 108575 Title: Street Commissioner The following change(s) in scope and price are formally requested: 1 Additional MOT(CC&T) Request to add Line Item#30-Additional MOT-CC&T(1 LS) $ 4,125.00 CC&T(proposal attached)-MOT for work on Illinois Street-136th to Main St Howard Companies 10%Mark-up $ 412.50 Total Requested Reason for RFC: Owner/Contractor Requested Change: $ 4,537.50 Additional Day(s)Required: 0 Attachments? 0 Yes Submitted By: Approved By: Mike Parrish NAME SIGNATURE DATE Sr. Project Manager TITLE PRINTED TITLE All terms and conditions of the original contract apply to and govern this Request for Change. *In lieu of issuing a formal change order to Howard Companies as a response to this request,you may have an authorized representative of your company sign,date,and return this request. DocuSign Envelope ID:CEFE5496-6DF4-4883-B29B-BA4996E2D8A3 PROPOSAL C C & T CONSTRUCTION, INC. 5051 Prospect Street Indianapolis,IN 46203 Phone: (317)356-6385 Fax: (317)356-2175 Proposal Submitted To: Phone: Date: Howard Companies 5/3/2023 Attention: Email Mike Parrish mparrishhowardcompanies.com Street: Job Location: City,State,and Zip Code: Job Name: Carmel We hereby submit specifications and estimates for: 1.) Maintaining traffic for Illinois Street from 136th Street to Main Street. LUMP SUM -$4,125.00 We propose hereby to furnish material and labor-complete in accordance with above specifications,for the sum of SEE ABOVE dollars Payment To Be Made As Follows: All materials guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard Authorized Signature: practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders 'Tony Page and will become an extra charge over and above the estimate. All agreements contingent upon strikes,accidents or delays beyond our control. Owner to carry fire,tornado and other necessary insurance. Our workers are fully covered by Workmen's Note:This proposal may be withdrawn Compensation insurance. by us if not accepted within 10 day Acceptance of Proposal Authorized Signature: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized Authorized Signature: to do the work as specified. Payment will be made as outlined above. Date of Acceptance: