Loading...
HomeMy WebLinkAbout210 3rd Ave SW Zoning Letter.pdfCity of Carmel ZONING VERIFICATION LETTER June 22, 2023 Via email: maya@zoningassociates.com Maya Kravtsosa National Zoning Associates, LLC 4616 NW 159th Street Edmond, OK 73013 RE: Zoning Verification: 210 3rd Ave SW, Carmel, IN 46032 - Buckingham AT &T Carmel Midtown Tax Parcel IDs: 16-09-25-04-05-001.000 Maya, In response to your request for information regarding the above-referenced property, we have researched our files and present the following: 1. The current zoning classification for the subject property is C2/Mixed Use District. 2. The abutting Zoning Districts are: North: R2/Residence District South: C2/Mixed Use District East: C2/Mixed Use District West: C2/Mixed Use District 3. The proposed use as Multifamily is a Permitted Use by Right in the C2/Mixed Use District. 4. To the best of my knowledge there are no outstanding or open zoning violations on the property. 5. The subject property was granted the following Variances by the Board of Zoning Appeals. The Letter of Decision is attached, and the below links will direct you to the online file. a. Docket PZ-2022-00086 V, UDO Section 2.36, Maximum Lot Coverage – 80% allowed, 85% requested for Parcels A, B, C & D. b. Docket PZ-2022-00088 V, UDO Sections 5.19 & 5.21, Bufferyard Content – Hardscape improvements and parking lot located in portion of bufferyards on Parcels A, C & D. c. Docket PZ-2022-00089 V, UDO Section 1.07, Transportation Plan Compliance: 90’, 56’, and 56’ street right of way widths required for 3rd Ave SW, Industrial Dr, and Emerson Rd. Requested widths shown on the Site Exhibit. 6. The subject property was required to go through a Site Plan Approval process. The approved site plan is attached, and the below link will direct you to the online file. a. Docket PZ-2022-00202 DP/ADLS, Development Plan & Architectural Design, Exterior Lighting, Landscaping and Signage for Buckingham AT&T Carmel Midtown Parcel A. 7. The subject property is NOT in a Planned Unit Development. This information was researched on June 22, 2023, by the undersigned, per request and as a public service. The undersigned certifies that the above information contained herein is believed to be accurate and is based upon, or relates to, the information supplied by the requestor. The Authority assumes no liability for errors and omissions. All information was obtained from public records, which may be inspected during regular business hours. Please feel free to contact the Department of Community Services if you have any questions or concerns at 317- 571-2417 or www.carmeldocs.com. Sincerely, Adrienne Keeling, AICP City of Carmel Dept. of Community Services 1 Civic Square, Carmel, IN 46032 akeeling@carmel.in.gov | 317-571-2417 Department of Community Services One Civic Square, Carmel, IN 46032 Phone 317.571.2417 web: carmeldocs.com Michael P. Hollibaugh, Director L E T T E R of D E C I S I O N July 26, 2022 Brian J. Tuohy Tuohy Bailey & Moore LLP 50 South Meridian Street, Suite 700 Indianapolis, Indiana 46204 Re: Carmel Midtown Redevelopment Variances (Docket Nos. PZ-2022-00082, 84, 86, 87, 88, 89 V) Dear Mr. Tuohy: At the meeting held on Monday, July 25, 2022, the Carmel Board of Zoning Appeals took the following action regarding the Use Variance (UV) and Development Standards Variance (V) requests filed for the property located at 210 3rd Ave SW (former AT&T site) and 449 & 451 Emerson Rd. (Johnson Addition Lots 29 -30): DENIED 3-2 - Docket No. PZ-2022-00082 UV UDO Section 2.09 Permitted Uses, Office use in R2 zoning district requested for Parcels C & D. DENIED 3-2 - Docket No. PZ-2022-00084 V UDO Section 2.10 Minimum 20-ft R2 residential rear yard setback required, 5.7-ft requested for Parcels E & F. APPROVED 3-2 - Docket No. PZ-2022-00086 V UDO Section 2.36 Maximum 80% C2 lot cover allowed, 85% requested for Parcels A, B, C & D. DENIED 4-1 - Docket No. PZ-2022-00087 V UDO Sections 5.19 Bufferyard Width - Minimum 30’ rear bufferyard required; 15’ requested for Parcels C & D. APPROVED 4-1 - Docket No. PZ-2022-00088 V UDO Sections 5.19 & 5.21 Bufferyard Content - Hardscape improvements and parking lot located in portion of bufferyards requested for Parcels A, C & D . APPROVED 5-0 - Docket No. PZ-2022-00089 V UDO Section 1.07 Transportation Plan Compliance: 90’, 56’, and 56’ street right of way widths required for 3rd Ave SW, Industrial Dr., and Emerson Rd.; Request for ROW widths as shown on Site Exhibit. Please be advised that per Article 9.15 of the Unified Development Ordinance, the three (3) aforementioned Development Standards Variance approvals are valid for three (3) years. By that time, either continuous construction of the improvements must be underway, or a written request for a one-time, six-month extension of the approval must have been received and approval granted by this Department. The expiration date of the approval is July 25, 2025. Also, please refer to the BZA Rules of Procedure regarding the applications that were denied and have an adverse decision. If I can be of any further assistance, please do not hesitate to contact me at 317-571-2417 or aconn@carmel.in.gov. Sincerely, Angie Conn, AICP Planning Administrator Division of Planning & Zoning cc: File E T EXISTING LEGEND C3. 0SITE PLANNORTH CARMEL A MIDTOWNPARCEL 85% CD SETC3. 0SITE PLANC3. 0SITE PLANKEY NOTES NOTES PAVING GENERAL PLAN LEGENDC3. 0SITE PLAN PARKING