Loading...
HomeMy WebLinkAboutC100 - Overall Site Plan - G1.0UPREF.23'-8 5/8"26'-6 3/8"23'-8 5/8" 32'-7 5/8"20'-8" 76'-0"52'-8"31'-10"18 '-9 5/8"SMOKEY ROW ROAD / E 136TH STREETFINAL PLAT OFARDEN TOWNHOMESINSTR. #2007001171LOT 1201 LOT 1202 LOT 1203 LOT 1204 LOT 1205 LOT 1206 LOT 1207 LOT 1301 LOT 1302 LOT 1303 LOT 1304 LOT 1305 LOT 1306 LOT 1401 LOT 1402 LOT 1403 LOT 1404 LOT 1405 LOT 1406 LOT 1701 LOT 1702 LOT 1703 LOT 1704 LOT 401 LOT 402 LOT 403 LOT 404 LOT 405 LOT 301 LOT 302 LOT 303 LOT 304 LOT 305 LOT 201 LOT 202 LOT 203 LOT 204 LOT 205 LOT 101 LOT 102 LOT 103 LOT 104 LOT 105 COMMON AREA "B"COMMON AREA "N"PRIVATE ALLEY COMMON AREA "L" COMMON AREA "H" COMMON AREA "F" COMMON AREA "E"PRIVATE ALLEYPRIVATE ALLEY KE Y S T O N E AV E N U E / S . R . 4 3 1 SMOKEY ROW ROAD / E 136TH STREET KE Y S T O N E A V E N U E / S . R . 4 3 1 KE Y S T O N E A V E N U E / S . R . 4 3 1 SMOKEY ROW ROAD / E 136TH STREET35' FRONT Y A R D SET BACK 30' GREE N BELT 35' FRONT Y A R D SETBACK 30' GREE N BELT 25' SIDE YARD SETBACK PROP E R T Y LINE PROP E R T Y LI N E PROP ER T Y L IN E PROPERTY L INE PRO P ER TY L IN E PROPERTY LINE PROPERTY LINE 19'-4"CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS 35' FRONT YARD SETBACK204'564.6' 1,035.7' 525.2'202.9 '1,241.9'1,044.7'CONSTRUCTION LIMITS GREYHOUND ACTIVITY CENTER 91,019 SF SOUTH ENTRANCE BUILDINGS 9,374 SF COPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220136.00 CARMEL STADIUM SOUTH SUPPORT BUILDING CARMEL CLAY SCHOOLS E 136th St, Carmel, IN 46032 PROJECT ISSUE DATE: 04.26.2023 CONSTRUCTION DOCUMENTS DRAWN BY: ARS 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO. DESCRIPTION DATE CONSULTANT PROJECT MANAGER: PMR 19700317 No. G1.0 SITE PLAN - OVERALL 80 2400 80 160 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CEC CIVIL & ENVIRONMENTAL CONSULTANTS DATED MAY 17, 2022. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. GENERAL NOTES SEE SITE PLAN G1.4 (SOUTH SUPPORT BUILDINGS PROJECT) SEE SITE PLAN G1.5 (GREYHOUND ACTIVITY CENTER PROJECT) SEE SITE PLAN G1.3 (GREYHOUND ACTIVITY CENTER PROJECT) SEE SITE PLAN G1.1 (SOUTH SUPPORT BUILDINGS PROJECT) SEE SITE PLAN G1.6 (NOT IN PROJECT) SEE SITE PLAN G1.2 (NOT IN PROJECT)20' REAR YARD SETBACK1 REGULATORY REVIEW1-18-2023 2 TAC RESPONSE 03-07-2023 3 TAC RESPONSE 03-17-2023 4 SSB FINAL CD'S 4-26-2023 5 TAC RESPONSE 05-6-2023 HORIZONTAL AND VERTICAL DATUM: 06/27/23