HomeMy WebLinkAboutC100 - Overall Site Plan - G1.0UPREF.23'-8 5/8"26'-6 3/8"23'-8 5/8"
32'-7 5/8"20'-8"
76'-0"52'-8"31'-10"18 '-9 5/8"SMOKEY ROW ROAD / E 136TH STREETFINAL PLAT OFARDEN TOWNHOMESINSTR. #2007001171LOT
1201
LOT
1202
LOT
1203
LOT
1204
LOT
1205
LOT
1206
LOT
1207
LOT 1301
LOT 1302
LOT 1303
LOT 1304
LOT 1305
LOT 1306
LOT 1401
LOT 1402
LOT 1403
LOT 1404
LOT 1405
LOT 1406
LOT 1701
LOT 1702
LOT 1703
LOT 1704
LOT 401
LOT 402
LOT 403
LOT 404
LOT 405
LOT 301
LOT 302
LOT 303
LOT 304
LOT 305
LOT 201
LOT 202
LOT 203
LOT 204
LOT 205
LOT 101
LOT 102
LOT 103
LOT 104
LOT 105
COMMON AREA "B"COMMON AREA "N"PRIVATE ALLEY
COMMON AREA "L"
COMMON AREA "H"
COMMON AREA "F"
COMMON AREA "E"PRIVATE ALLEYPRIVATE ALLEY KE
Y
S
T
O
N
E
AV
E
N
U
E
/
S
.
R
.
4
3
1
SMOKEY ROW ROAD / E 136TH STREET
KE
Y
S
T
O
N
E
A
V
E
N
U
E
/
S
.
R
.
4
3
1
KE
Y
S
T
O
N
E
A
V
E
N
U
E
/
S
.
R
.
4
3
1
SMOKEY ROW ROAD / E 136TH STREET35' FRONT
Y
A
R
D SET BACK
30' GREE
N BELT
35' FRONT
Y
A
R
D SETBACK
30' GREE
N BELT
25' SIDE YARD SETBACK
PROP
E
R
T
Y
LINE
PROP
E
R
T
Y
LI
N
E
PROP
ER
T
Y
L
IN
E
PROPERTY L
INE
PRO
P
ER
TY
L
IN
E
PROPERTY LINE
PROPERTY LINE 19'-4"CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
CONSTRUCTION
LIMITS
CONSTRUCTION
LIMITS
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
35' FRONT YARD SETBACK204'564.6'
1,035.7'
525.2'202.9
'1,241.9'1,044.7'CONSTRUCTION LIMITS
GREYHOUND ACTIVITY CENTER
91,019 SF
SOUTH ENTRANCE BUILDINGS
9,374 SF
COPYRIGHT 2023 BY FANNING/HOWEY ASSOCIATES, INC.
WWW.FHAI.COM
ARCHITECT
PROJECT NUMBER: 220136.00
CARMEL STADIUM
SOUTH SUPPORT
BUILDING
CARMEL CLAY SCHOOLS
E 136th St, Carmel, IN 46032
PROJECT ISSUE DATE: 04.26.2023
CONSTRUCTION DOCUMENTS
DRAWN BY: ARS
317.848.0966
350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204
REV.
NO. DESCRIPTION DATE
CONSULTANT
PROJECT MANAGER: PMR
19700317
No.
G1.0
SITE PLAN - OVERALL
80 2400 80 160
1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL
LEGEND.
2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN
WERE PROVIDED BY CEC CIVIL & ENVIRONMENTAL
CONSULTANTS DATED MAY 17, 2022. THE ENGINEER MAKES NO
GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN
COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN
SERVICE OR ABANDONED.
3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE
PROJECT AREA INCLUDING UNDERGROUND UTILITY
CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE
CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE
ENGINEER.
GENERAL NOTES
SEE SITE PLAN G1.4
(SOUTH SUPPORT BUILDINGS PROJECT)
SEE SITE PLAN G1.5
(GREYHOUND ACTIVITY CENTER PROJECT)
SEE SITE PLAN G1.3
(GREYHOUND ACTIVITY CENTER PROJECT)
SEE SITE PLAN G1.1
(SOUTH SUPPORT BUILDINGS PROJECT)
SEE SITE PLAN G1.6
(NOT IN PROJECT)
SEE SITE PLAN G1.2
(NOT IN PROJECT)20' REAR YARD SETBACK1 REGULATORY REVIEW1-18-2023
2 TAC RESPONSE 03-07-2023
3 TAC RESPONSE 03-17-2023
4 SSB FINAL CD'S 4-26-2023
5 TAC RESPONSE 05-6-2023
HORIZONTAL AND VERTICAL DATUM:
06/27/23