HomeMy WebLinkAboutES101 - ELECTRICAL SITE PLANJJJJ
J J J
J
STAIR #1
ST1-1
STAIR #2
ST2-1
LEASE
SPACE #1
101
LEASE
SPACE #2
102
BREEZEWAY
003
WEST
LOGGIA
001
UP
T2
S1
S1
S1 S1S1S1
S2 S2
S2 S2
S3 S3 S3 S3 S3
S3
S3
S3
S4
S4
S3
S3
S3
S3
S3
S3
S3 S3 S3 S3 S3
1111
2
3
4
5
6
P1A-26,28P1A-27,29P1A-30,327 7 7
CT4
CT2
CT1
8
T12
3
1
P1A - 33
S3
S3
S3
S4
S4
S3
S3
S3
S3
S3
S3
P1A - 19
P1A - 13
S2S2S2
S2
S2
S2
S2
S2
P1A - 6
S2
ARCHITECTCLIENTCONSULTANTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS19020
PERMIT SETOFFICE ON RANGELINE2023-06-02
ES101ELECTRICAL SITE PLAN3/32" = 1'-0"
ELECTRICAL SITE PLAN1
GENERAL NOTES
A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
B REFER TO SHEET E601 FOR LIGHT FIXTURE SCHEDULE.
C ALL CONDUIT TO BE 4-INCH SCH 80 PVC UNLESS NOTED OTHERWISE AND
BURIED A MINIMUM OF 24-INCHES DEEP. COORDINATE FINAL ROUTING
LOCATIONS WITH OTHER TRADES PRIOR TO WORK. REFER TO FEEDER
SCHEDULE ON SHEET E901 FOR CONDUIT SIZING.
D CONDUIT ROUTING IS DIAGRAMATIC AND MAY SHIFT TO AVOID CONFLICT WITH
STRUCTURES AND OTHER TRADES. COORDINATE WITH ALL TRADES ON-SITE
BEFORE PERFORMING WORK.
E ALL SITE LIGHTING CIRCUITS TO BE CONTROLLED BY DIGITAL CLOCK
LOCATED NEAR SOURCE PANEL.
SHEET KEYNOTES
1 PROVIDE JUNCTION BOX FOR FUTURE DECORATIVE LIGHTING. COORDINATE
EXACT LOCATION WITH OWNER PRIOR TO ROUGH-IN.
2 UTILITY TRANSFORMER PROVIDED BY UTILITY PROVIDER. TRANSFORMER IS
TO BE MOUNTED ON PIT PAD. PROVIDE CONCRETE PAD ACCORDING TO
UTILITY REQUIREMENTS.
3 SECONDARY CONDUIT AND FEEDERS TO BE FURNISHED AND INSTALLED BY
CONTRACTOR. REFER TO SHEET E901 FOR FEEDER INFORMATION.
4 INSTALL 1200A CT CABINET FOR MAIN GEAR PROVIDED BY CONTRACTOR.
PROVIDE SECONDARY CONDUIT AND FEEDERS FROM TRANSFORMER TO CT
CABINET ACCORDING TO RISER DIAGRAM. PROVIDE FEEDER CONDUCTORS
AND CONDUIT FROM CT CABINET TO MAIN GEAR ACCORDING TO RISER
DIARAM. LEAVE 5-FEET OF CONDUCTOR FOR EACH PHASE COILED INSIDE CT
CABINET. SECONDARY CONDUCTORS FROM TO CT CABINET AND FINAL
TERMINATIONS BY CONTRACTOR.
5 PROVIDE SECONDARY CONDUIT AND FEEDERS FROM TRANSFORMER TO
FUTURE 1200A CT CABINET FOR 1933 LOUNGE ACCORDING TO RISER
DIAGRAM. PROVIDE FEEDER CONDUCTORS AND CONDUIT FROM CT CABINET
TO RESTAURANT PANEL ACCORDING TO RISER DIARAM. LEAVE 5-FEET OF
CONDUCTOR FOR EACH PHASE COILED INSIDE CT CABINET. SECONDARY
CONDUCTORS FROM TO CT CABINET AND FINAL TERMINATIONS BY
CONTRACTOR.
6 INSTALL 3000A UTILITY TERMINATION CABINET FOR TENANT SPACE PROVIDED
BY CONTRACTOR. PROVIDE SECONDARY CONDUIT AND FEEDERS FROM
TRANSFORMER TO TERMINATION CABINET ACCORDING TO RISER DIAGRAM.
PROVIDE FEEDER CONDUCTORS AND CONDUIT FROM TERMINATION CABINE
TO RESTAURANT PANEL ACCORDING TO RISER DIARAM. LEAVE 5-FEET OF
CONDUCTOR FOR EACH PHASE COILED INSIDE TERMINATION CABINET.
SECONDARY CONDUCTORS FROM TO CT CABINET AND FINAL TERMINATIONS
BY CONTRACTOR.
7 PROVIDE 208V, 1-PH CIRCUIT FOR LEVEL 2 EV CHARGER. COORDINATE EXACT
LOCATION WITH OWNER PRIOR TO INSTALLATION.
8 PROVIDE SECONDARY CONDUIT AND FEEDERS FROM TRANSFORMER TO FIRE
PUMP DISCONNECT ACCORDING TO RISER DIAGRAM ON SHEET E901
#DESCRIPTION DATE
1 Addendum - 01 06/08/2023