Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A2.01 Elevations, Door & Window Details
1st Floor 755' -1 13/16" 2 A3.01 2 A3.01 3 A3.01 3 A3.01 101102W1 8' - 8"W1W1 12 13 11 15 1 2 3 14 10 5 9 4 1 1.4 1.6 2 1 A3.01 1 A3.01 3" 12" 8 7 1 2 3 14 4 5 16 AA.8B 3' - 0"4' - 0"2' - 0"1 A3.01 1 A3.01 3" 12" 1 2 3 14 4 5 7 8 16 A A.8 B 4' - 0"3' - 0"2' - 0"2 A3.01 2 A3.01 3 A3.01 3 A3.01 10310 13 1 2 8 3 14 5 7 4 6 16 11.41.6 2 3' - 4"4' - 8"3' - 4"4' - 8"3' - 4"EQ.EQ. 17 4' - 0"GB3 GB2 SD1 MR1 GB1 GB3 TD1 SN1 F4"SEE SCHD.SEE SCHEDULESEE SCHD.2" SCHD. SEE 2" A W1 MR1 SD1 HD1 WP1 AF1 BC1 2' - 0"3' - 4" ELEVATION NOTES - LIMESTONE STONE CLADDING, ASHLAR PATTERN PRECAST STONE BAND W/ RETURN AT OPENINGS. THERMALLY MODIFIED VERT. WOOD SIDING COMPOSITE METAL WALL PANEL. ALIGN JOINTS W/ OPENINGS OR AS DIMENSIONED. PRE-FINISHED METAL FASCIA ASSEMBLY STANDING SEAM METAL ROOFING PRE-FINISHED ALUMINUM GUTTER, 5" PRE-FINISHED ALUMINUM DOWNSPOUT, 4"x4" PRE-FINISHED METAL SOFFIT PANEL INSUL. DOOR & FRAME. SEE DOOR SCHEDULE INSUL. ALUM. WINDOW. SEE WINDOW DETAIL DRINKING FOUNTAINS, RECESSED. SEE PLUMBING DWGS. LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS PRE-FINISHED MTL. CAP FLASHING CONCEALED WALL HYDRANT. SEE PLUMBING DWGS. MECHANICAL LOUVER, MATCH MTL. PANEL COLOR. SEE 'M' SERIES DWGS. WALL MOUNTED AED CABINET # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 GENERAL ELEVATION NOTES 1. DO NOT SCALE DRAWINGS. 2. ACM PANELS: ALIGN JOINTS AS SHOWN. DIMENSIONS ARE TO ROUGH WIDTH. ACCOUNT FOR TRIM AND JOINERY. PANELS WITHOUT A DIMENSION SHALL BE FIELD VERIFIED. 3. PRECAST STONE CAP (NOTE 2) TO SLOPE 15 DEG. MIN. W/ PRE-FINISHED METAL FLASHING. 4. WOOD TRIM CAP TO SLOPE 15 DEG. MIN W/ PRE- FINISHED METAL FLASHING (NOTE 14). 1st Floor 755' -1 13/16" ACCESSIBLE WALL HUNG SINK ADA COMPLIANT PIPE & WATER LINE PROTECTION MR1 B.O. REFLECTIVE SURFACE3' - 4" MAXSEE FLOOR PLAN FOR WALL TYPE 1.4 DOOR. SEE SCHEDULE ADA COMPLIANT THRESHOLD SET IN BED OF SEALANT SILLHEAD DOOR. SEE SCHEDULE ALUMINUM FRAME SEALANT ENTIRE PERIMETER, BOTH SIDES CMU HEADER. SEE STRUCT. DWGS. DOOR. SEE SCHEDULE ALUMINUM FRAME SEALANT ENTIRE PERIMETER, BOTH SIDES REINF. CMU. BULLNOSE @ EXPOSED CORNERS FLUID APPLIED AIR& MOISTURE BARRIER 1-1/2" HORZ. FURRING VERTICAL THERMAL SIDING JAMB (HIGH) ALUMINUM FRAME, BEYOND VERTICAL THERMAL SIDING 1-1/2" HORZ. FURRING VERTICAL THERMAL TRIM HEAD FLASHING PER MFR. DOOR. SEE SCHEDULE ALUMINUM FRAME SEALANT ENTIRE PERIMETER, BOTH SIDES REINF. CMU. BULLNOSE @ EXPOSED CORNERS FLUID APPLIED AIR& MOISTURE BARRIER 1-1/2" HORZ. FURRING LINE OF VERTICAL THERMAL SIDING ABOVE JAMB (LOW) 1 3/4" 1 3/4"1 3/4" TOILET ACCESSORIES TAG DESCRIPTION GB1 42" Grab Bar: Bobrick B-6809.99x42 36" Grab Bar: Bobrick B-6809.99x36GB2 18" Grab Bar (Vertical): Bobrick B-6809.99x18GB3 Toilet Paper Dispenser: Cintas Owner SuppliedTP1 Hand Dryer: Excel TA-ABSHD1 Soap Dispenser: Cintas Owner SuppliedSD1 Mirror: AJW Architectural Prod. u711-2436/10001522526MR1 Sanitary Napkin Disposal: Tough Guy 1ECK9SN1 Wall Protection: Excel 89S-136XL89SWP1 SS Frame Mirror: Bobrick B165 18w X 30hMR1 AF1 Air Freshener Dispenser - Cintas, Owner Supplied. Contractor Installed. Baby Changing Station: Koala Kare KB-200 (Cream). No substitutions. BC1 See DrawingPer Indiana state Law IC8-1-26,Call Two Full Working DaysBefore You Dig.626 North Illinois Street Indianapolis, Indiana 46204 Phone: (317) 635-5030 Website: www.browningday.com Project #:Field Survey:Drawn By:Checked By:Scale:Date:7/30/2021SJCA Inc.CARMEL CLAY PARKS & RECREATIONHAMILTON COUNTY, INWHITE RIVER GREENWAYNORTH TRAIL EXTENSIONSHEET XX OF XX SHEETS100% BID SET6/16/2023 9:23:31 AM\\bdmd.local\UEM\UserShare\jfram\Documents\22A056_CarmelParksWR - Architectural (R21)_jframGQNKL.rvtBDay:22056CheckerJune 16, 2023A2.01Elevations, Door & Window DetailsJEFA2.01 1/4" = 1'-0" Exterior Elevation1West Elevation A2.01 1/4" = 1'-0" Interior Elevation2North Elevation A2.01 1/4" = 1'-0" Exterior Elevation4South Elevation A2.01 1/4" = 1'-0" Exterior Elevation3East Elevation A2.01 1/4" = 1'-0" Interior Elevation5Elevation A A2.01 1/4" = 1'-0" Interior Elevation6Elevation B A2.01 1/4" = 1'-0" Detail10Door & Frame Elevations DOOR SCHEDULE Mark Room Name OPENING PANEL FRAME DETAILS Fire Rating Hrdw Set Elec .CommentsWidth Height Config Material Finish Thick. Elev. Elev. Material Finish Head Jamb Sill 101 Restroom 3' - 0" 7' - 0" SINGLE HM PTD 1 3/4" F A HM PTD 10/A2.01 10/A2.01 10/A2.01 - 1 X Power to hinge side for door locks 102 Restroom 3' - 0" 7' - 0" SINGLE HM PTD 1 3/4" F A HM PTD 10/A2.01 10/A2.01 10/A2.01 - 1 X Power to hinge side for door locks 103 Custodial 3' - 0" 7' - 0" SINGLE HM PTD 1 3/4" F A HM PTD 10/A2.01 10/A2.01 10/A2.01 - 2 A2.01 1/4" = 1'-0" Interior Elevation8Elevation D A2.01 1/4" = 1'-0" Interior Elevation7Elevation C A2.01 1/4" = 1'-0" Detail11Window Elevation ROOM FINISH SCHEDULE Room # Room Name Floor Finish Base Finish Wall Finish Ceiling Finish Additional Information 1st Floor 101 Restroom F1 B1 P1 T&G Decking, Stain 102 Restroom F1 B1 P1 T&G Decking, Stain 103 Custodial F1 B1 P1 Open to structure A2.01 1" = 1'-0" Section Detail9Sink Section TRANSLUCENT GLASS PANEL A2.01 1 1/2" = 1'-0" Detail12Door Jamb MATERIAL FINISH LEGEND F1 = HIGH PERFORMANCE COATING -ROCKTREAD LV., COLOR: CUSTOM MATCH GRAY B1 = VINYL WALL BASE -JOHNSONITE 6" COVE, COLOR: CHARCOAL WG #20 P1 = LATEX SYSTEM -PPG, COLOR: CUSTON MATCH LIGHT GREEN (COORDINATE W/ OWNER) P2 =EXTERIOR PAINT TO MATCH THERMALLY MODIFIED WOOD, GLOSS FINISH REVISION SCHEDULERev. #Revision DescriptionIssue Date