HomeMy WebLinkAboutC521 Proposed Multi-Use Path - Structure General PlanSJCA5:03:19 PM6/27/2023Model:General Plan - 2H:\Projects\2021\Engineering\21EN019_WHITE_RIVER_GREENWAY_NORTH_EXTENSION_SJCA\CAD\Sheets\C520_GenPlan.dgnUser:PersonalChecked:REVISIONProject #:Scale:Date:DATEDrawn:SYMSHEETSSHEET2751OFBefore You Dig.Call Two Full Working Days Per Indiana State Law IC8-1-26,SJCA Inc.P RELIM IN ARY07/30/2021Field Survey:02/28/202302/28/2023Phone: (317) 566-06299102 North Meridian Street, Suite 200, Indianapolis, IN 46260NORTH TRAIL EXTENSIONWHITE RIVER GREENWAYHAMILTON COUNTY, INDIANACARMEL CLAY PARKS & RECREATION21EN0191.61%1.59%
Geotextile for Riprap, Type 1A
Class 1 Riprap (30" deep) over
Inlet Flowline Elev. 732.22 Outlet Flowline Elev. 732.22
6'-0"6'-0"
2'-0"2'-0""16621'-314'-0"14'-0"
27'-1"28'-0" Long Precast Reinf. Conc. Three-Sided Str.31'-9"
(Typ.)
1'-0"
SECTION "A-A"
Scale: 3
16" = 1'-0"
Low Str. Elev. 750.50
12'-0"
Top of Ftg. Elev. 729.22 (Typ.)Flowline Elev. 732.22
OHW Elev. 732.89
Q100 Elev. 750.50
Geotextile for Riprap, Type 1A
Class 1 Riprap (30" deep) over
Structure Backfill, Type 5
Btm. of Pavement
4
1
4
1
SECTION "B-B"
Scale: 3
16" = 1'-0"
14'-0" Clear Span
21'-4" Rise(Min.)3'-0"10'-0" Leg11'-4" PedestalHAMILTON COUNTY
WHITE RIVER NORTH TRAIL OVER DITCH
15° SKEW LT.
14' SPAN X 21'-4" RISE X 28' LONG
THREE-SIDED STRUCTURE
PRECAST REINFORCED CONCRETE
C521PROPOSED MUTLI-USE PATH - STRUCTURE GENERAL PLANXX/XX/XXXXAS NOTED