Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C802 Project Details
Boardwalk Length PermaTrak Beam (Typ.) PermaTrak Tread (Typ.) Boardwalk Length - 1 BOARDWALK PLAN NTS - 1 SECTION NTS Precast Concrete PermaTrak Treads Plus Joints @ 1/8"± Per Joint C BoardwalkL Boardwalk WidthPermaTrak Abutment PermaTrak Abutment PermaTrak Abutment PermaTrak Curb (Typ.) Up To 20'-0" Span (Typ.) PermaTrak Beam (Typ.) Pier/Pile (Typ.) (Concrete Pier Shown) (See Typical Sections For Options) PermaTrak Curb (Typ.)Height <30"Height >30"PermaTrak Pedestal (Typ.) PermaTrak Pedestal (Typ.) 4" Min. Thick Unreinforced Concrete Pad (2000 PSI Min. Compressive Strength) Tread Lay Lengths: 10", 24", 36" or 48" (Dependent On Tread Width) (Longer Spans Available If Needed) Railing (TBD) Pier/Pile (Typ.) (Concrete Pier Shown) (See Typical Sections For Options) Railing - To Be Selected by Owner PermaTrak Abutment C BoardwalkL BOARDWALK PLAN NTS -17'-8"7'-8"15'-4"5 1/2" Thick x 2'-11 7/8" Wide x 12' Long Precast Concrete PermaTrak Treads Plus Joints @ 1/8"± Per Joint Total Boardwalk Length Railing (By Others) 1 SECTION NTS L 15'-4" C Beam/Pedestal 5 1/2" Thick PermaTrak Tread 14'-0" Clear Driven Pile (Timber, Composite, Concrete or Steel) Railing (By Others) 11"x1'-2" PermaTrak Beam (Typ.) PermaTrak Abutment (Typ.) Approximate Grade Line PermaTrak Pedestal Cap (Typ.)Checked:REVISIONProject #:Scale:Date:DATEDrawn:SYMPer Indiana State Law IC8-1-26,Call Two Full Working DaysBefore You Dig.SJCA Inc.100% BID SET07/30/2021Field Survey:NMFHAF1" = 20'06/16/2023WHITE RIVER GREENWAYNORTH TRAIL EXTENSIONHAMILTON COUNTY, INDIANACARMEL CLAY PARKS & RECREATION2021.0308440 Allison Pointe Blvd Suite 425, Indianapolis, IN 46250Phone: (317) 661-1964