HomeMy WebLinkAboutElevationsT R I B U T ET R I B U T E
k�
1 1 zj� rL�rlk-llll 1
A351 A410 A351 A266 A411
1.1 5.7
V.3 A.2 0.8 0.9 1.2 1.5 2.8 2.9 3.8 5.6 5.8 6.2 7.2 7.3 8.4 8.5 .6 9.2 9.8 10. 10.4 11.2 11.6 12.1
BEYOND 5 TOP OF PARAPET
CM10 CM5 CM10 TOP OF PARAPET CM5 FRAMING
TOP OF PARAPET TOP OF PARAPET CMU BL CK
2 TOP OF PARAPET CM T
FRAMING RAVING OP OF PARAP T +72'-7 1/2"
FRAMING
+76'-3 3 4
+72'-7 1 /2" +72'-7 1 /2° +76'-0 1 /4° FRAMING 1 /2°
oLBOTTOM OF ROOF DECK BOTTOM OF ROOF DECK,` BOTTOM OE ROOF DECK
+71'-0" A.F.F. +71'-0" A.F.F. +71'-0" A.F.F.
3 W 3 W2 W 3
h SIXTH FLOOR SIXTH FLOOR ,� SIXTH FLOOR
+60-6" A.F.F. AMS1 +60-6" A.F.F. � AMS1
+60-6" A.F.F.
3 W 3 W2 W 3
h FIFTH FLOOR FIFTH FLOOR � FIFTH FLOOR o
+50'-0" A.F.F. +50'-0" A.F.F.+50'-0" A.F.F.
ALOFT SIGNAGE DECALCLE w 4.1+-Iw *7EITLE 116�
L+V=El
M
oL FOURTH FLOOR FOURTH FLOOR, SEE SPECIFICATIONS FOURTH FLOOR
+39'-6" A.F.F. +39'-6" A.F.F. +39'-6" A.F.F.
� W2 ® W 3
OL THIRD FLOOR THIRD FLOOR A413 2 THIRD FLOOR
+29'-0" A.F.F. +29'-0" A.F.F. A413 w +29'-0" A.F.F.
3 3 W 3 W2 W 3
A443 A443 A444
SECOND FLOOR SECOND FLOOR SECOND FLOORi,
+18'-6" A.F.F. +18'-6" A.F.F. - -- --- --- --- -- - - -- --- --- --- -- - - --- -- - - --- -- --- --- --- --- --- --- --- - - --- - - - --- --
lA A A 3 4 W4 W 3 1A
A440 - A440 4 - - - - - - - - - - � -� - A440 - - - - - - - A440
oL FIRST FLOOR FIRST FLOOR ,� FIRST FLOOR
0'-0" A.F.F. 0'-0" A.F.F. A440 0'-0" A.F.F.
2 3
INGRESS/EGRESS
A417 A417 ST1 ST1 FOOD SERVICE EXHAUST FAN. NGRESS/EGRESS ST1 FC1 LIGHTING ST1
SEE MECHANICAL AND FOOD LIGHTING MECHANICAL LOUVER. SEE MECHANICAL
PARTIAL
� R Tj I / L NORTH
O R �j�j H PARTIAL
/� R Tj � L NORTH
O R Tj H SERVICE DRAWINGS. CENTER DRAWINGS. PAINT TO MATCH ADJACENT
/� I� /� �I //�1 I� I� OF FAN TO BE 12'-6" AFT./� FINISH.
(---4 iBIL®iNG �LEV TIOON(`313IL®INU �L� T10N(---2EAST BUILDING EELS T10N
A302 SCALE: 1/16" = 1'-0' �12SCALE: 1/16" = 1'-0" A302 SCALE: 1/16" =
TOP OF PARAPET
FRAMING
+72'-3"
1 2 3 A 4 1
A352 A352 A352 A352 A264
5
Al
BEYOND LE
VINYL PATTERN. VINYL PATTERN. MECHANICAL DRAWINGS. PAINT
1 BY SIGNAGE VENDOR BY SIGNAGE VENDOR 1 TO MATCH ADJACENT FINISH.
A408 A407 A406
NORTH BUILMN� `LcVAT�ON
�12SCALE: 1/16" = 1'-0"
SECOND FLOOR,-i,
till 7
V.1 V
TOP OF PARAPET
FRAMING
D
U T
S
CM5
R
2
A303
0.2 Q P.1 P
MECHANICAL LOUVER.
MECHANICAL DRAWINGS.
MATCH ADJACENT
VTAC LOUVER. SEE
(MECHANICAL DRA�NINGS.
N
SEE
PINT
WALL FI
TO
ISH.
M L.2
CM6
®
L K
CM9 CM4 CM8
J
CM9
3
TOP OF
FRAMING
H G F E.9 E
CM4 CM9 1
A303 CM8
PARAP T
� D C
CM4
B.2 B
TOP OF PARAPET
FRAMING
+75'-1 3/8"
CM10
BOTTOM OF ROOF DECK
+71'-0" A.F.F.
W2
LE--Nl
CM10
�
SIXTH FLOOR �
+60-6" A.F.F.
Ll
�
LK
W2
®
®
FIFTH FLOOR �
+50'-0" A.F.F.
Lf
LE
LK
W2
I
I� LE
I
I
W3
I
®
®
C
FOURTH FLOOR �
+39'-6" A.F.F.
w
wz
3
3
wz
TOP OF PARAPET
FRAMING
1
1
1
1
1
®
®
®
+ -
®
THIRD FLOOR �
COMPOSITE METAL PANEL
CM1 MFR: SOBOTECH
COLOR: ALUMINUM STOREFRONT GEAR ANODIZED ALUMINUM
SIZE: VARIES
BOND: STACKED
CM2 MFR: SOBOTECH
COLOR: ANODIZED ALUMINUM -MATCH COLOR FC1
SIZE: VARIES
BOND: STACKED
CM3 MFR: SOBOTECH
COLOR: MATCH COLOR -ANODIZED ALUMINUM
SIZE: VARIES
BOND: STACKED
CM4 MFR: SOBOTECH
COLOR: CASTLE GRAY
SIZE: VARIES
BOND: STACKED
CM5 MFR: SOBOTECH
COLOR: PURE WHITE
SIZE: VARIES
BOND: STACKED
1 MFR: SOBOTECH
CM6 COLOR: BONE WHITE
SIZE: VARIES
BOND: STACKED
CM7 MFR: SOBOTECH
COLOR: AZURE BLUE
SIZE: VARIES
BOND: STACKED
CM8 NOT USED
CM9 NOT USED
CM10 MFR: ALUCOBOND
COLOR: CHESTNUT PVDF PRINT
SIZE: VARIES
BOND: STACKED
MASONRY
ST1 MFR: CROSSVILE - I NATURAL( PIETRA DI SAVOIA ANTRACITE
TYPE: FIELD TILE
COLOR: MATTE -BLACK
SIZE: VARIES - 1X3(M) PANEL
BOND: STACKED
ALUMINUM SIDING
OAMS1 MFR: LONGBOARD SOFFIT
COLOR: WOOD PLANK-,HGHT CHERRY
SIZE: VARIES - 6 X24 PANEL
BOND: STACKED
MFR: LONGBOARD SOFFIT
MS COLOR: WOOD PLANK -,LIGHT FIR
SIZE: VARIES - 6 X24 PANEL
BOND: STACKED
PRE -FINISHED METAL
MTL1 COLOR: ALUMINUM STOREFRONT CLEAR ANODIZED ALUMINUM
TL COLOR: ANODIZED ALUMINUM -MATCH COLOR FC1
TL COLOR: MATCH COLOR -ANODIZED ALUMINUM
TL4 COLOR: BONE WHITE
TL5 COLOR: WOOD PLANK - LIGHT CHERRY LONGBOARD SOFFIT
TL5 COLOR: BRIGHT WHITE
TL5 COLOR: LIGHT GRAY
TL5 COLOR: COOL REGAL BLUE - DURA TECH 5000/ZINCALUME
1
4 2
U
u
w
ICI
a
Scope Drawings:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
On the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
Revisions:
ASI 02 09/21/2020
A\MARRIOT COMMENT REVISIONS XX/XX/XX
�3 ASI 05 11/10/2022
"E�
11
Issue Date
Issue Date
Drawn By
Checked By
5/26/202
RH
Drawing Title: 11
419
Certified By:A 3
d •.
No.
AR00910036
STATE OF
Drawing Number:
0
Project Number:
1 3
1.2� 10.4 ��\ 10.2 9.8 ��\
9.2
IS
T MEIAL COPING?%% T
T
ML
---
---
---
- -
- - - - -
-
6 — — —
-
EMERGENCY
SEE ELECTRICAL
�.iiuul�ii i�i!iilil llir.
IIII
GAS SId
SPECI
''.III-IIIII -ill ii lr.
I IIII,I,III
A
UT OFF.
ATIONS
I'��''�i Ali �:I'�,Illllil,l. i„���...
LI
-
3s
_
-
NCR SS
LIGH IN
HOU EP
Iluuu III �����::
II � inT llll
CD
EGRESS
ONE
��Iiilu IIIIIIIii��Il�,ulAil'IIIL I
j��l��,ui�,liiiiiiii inilllllilil cull
I III
�lau„iii lllllaiiillu.lnilllllii II
-
- _
IIIr,� �ail,ulll
\
\
��-1 l',i lil'���'�
ILI
— —
0 A440
—
/
_
EMERGEN
Y SHUT OFF VALVE ACCESS PANEL
APPLIED CLEAR
SEE PLUMBING AND ELECTRICAL SPECIFICATIONS
ST1
VINYL r'AI I LNN.
BY SIGNAGE VENDOR
ST1
ENLARuc-D EAST COURTYARD
IZW�LDMG ELEVATION
SCALE: 1'C"
iOTTOM OF ROOF DECK
+71'—C" A.F.F.
SIXTH FLOOR
+60-6" A.F.F.
FIFTH FLOOR
+50'-0" A.F.F.
FOURTH FLOOR
+39'-6" A.F.F.
THIRD FLOOR
+29'-C" A.F.F.
SECOND FLOOR
+18'-6" A.F.F.
FIRST FLOOR
0'-0" A.F.F.
PIARTIAL SOUTH
VO l\ _ JJ IU GGJ E L EV A T O N
SCALE:
SECOND FLOOR,
+18'-6" A.E.E.
12"Wx14"H LOUVER.
SEE MECHANICAL
SHEETS LOUVER L-3
FIRST FLOOR
0'-0" A.F.F.
1'-0"
3070M OF ROOF DECK
+71'-0" A.F.F.
SIXTH FLOOR
+60-6" A.F.F.
FIFTH FLOOR
+50'-0" A.F.F.
N 1 LINE 21U_hH (W ® LJC—I W4 ® L tl L n
r l I II— I I I FOURTH FLOOR
—_�
+39'-6" A.F.F.
' ' I ' W4[F] EE
THIRD FLOOR
' I CI nnD +29'-0" A.F.F.
SCALE: 1/16" 1'C"
APPLIED CLEAR
VINYL PATTERN.
EY TIGNAGE VENDOR
WEST COURTYARD
SCALE: 1, 11 1'-0"
SECOND FLOOR
+18'-6" A.E.E.
FIRST FLOOR
0'-0" A.F.F.
2\
C� TEMO RM H KC
COMPOSITE METAL PANEL
CM1 MFR: SOBOTECH
COLOR: ALUMINUM STOREFRONT CLEAR ANODIZED ALUMINUM
SIZE: VARIES
BOND: STACKED
CM2 MFR: SOBOTECH
COLOR: ANODIZED ALUMINUM — MATCH COLOR FC1
SIZE: VARIES
BOND: STACKED
CM3 MFR: SOBOTECH
COLOR: MATCH COLOR — ANODIZED ALUMINUM
SIZE: VARIES
BON TACKED
CM4 FR: S0BO CH
COLOR: CASTLE GRAY
SIZE: VARIES
BOND: STACKED
CM5 MFR: SOBOTECH
COLOR: PURE WHITE
SIZE: VARIES
BOND: STACKED
CM6 MFR: SOBOTECH
COLOR: BONE WHITE
SIZE: VARIES
BOND: STACKED
CM7 MFR: SOBOTECH
COLOR: AZURE BLUE
SIZE: VARIES
BOND: STACKED
CM8 NOT USED
CM9 NOT USED
CM10 MFR: ALUCOBOND
COLOR: CHESTNUT PVDF PRINT
SIZE: VARIES
BOND: STACKED
MASONRY
MFR: CROSSVILE — NATURALI PIETRA DI SAVOIA ANTRACITE
ST1 TYPE: FIELD TILE
COLOR: MATTE — BLACK
SIZE: VARIES — 1X3(M) PANEL
BOND: STACKED
2
ALUMINUM SIDING
OAMS1 MFR: LONGBOARD SOFFIT
COLOR: WOOD PLANK —LIGHT CHERRY
SIZE: VARIES — 6 X24 PANEL
BOND: STACKED
MFR: LONGBOARD SOFFIT
MS COLOR: WOOD PLANK —LIGHT FIR
SIZE: VARIES — 6 X24 PANEL
BOND: STACKED
PRE —FINISHED METAL
MTL1 COLOR: ALUMINUM STOREFRONT CLEAR ANODIZED ALUMINUM
TL COLOR: ANODIZED ALUMINUM — MATCH COLOR FC1
TL3 COLOR: MATCH COLOR — ANODIZED ALUMINUM
TL4 COLOR: BONE WHITE
TL5 COLOR: WOOD PLANK — LIGHT CHERRY LONGBOARD SOFFIT
TL5 COLOR: BRIGHT WHITE
TL5 COLOR: LIGHT GRAY
TL5 COLOR: COOL REGAL BLUE — DURA TECH 5000/ZINCALUME
2
KEY PLAN
2
=4>
mmJ
u
w
06 E
LU
a
ZLo
C
c
Scope Drawings:
These drawings indicate the general scope of the project
in terms of architectural design concept, the dimensions of
the building, the major architectural elements and the type
of structural, mechanical and electrical systems.
The drawings do not necessarily indicate or describe all
work required for full performance and completion of the
requirements of the Contract.
0n the basis of the general scope indicated or described,
the trade contractors shall furnish all items required for the
proper execution and completion of the work.
Revisions:
Al RR 11 07/06/22
> ASI 05 10/27/22
Issue Date
11
Drawn By
Checked By
Drawing Title:
Certified By:
O •.
No.
AR00910036
STATE OFA303
Drawing Number:
Project Number:
1 3