Loading...
HomeMy WebLinkAboutElevationsT R I B U T ET R I B U T E k� 1 1 zj� rL�rlk-llll 1 A351 A410 A351 A266 A411 1.1 5.7 V.3 A.2 0.8 0.9 1.2 1.5 2.8 2.9 3.8 5.6 5.8 6.2 7.2 7.3 8.4 8.5 .6 9.2 9.8 10. 10.4 11.2 11.6 12.1 BEYOND 5 TOP OF PARAPET CM10 CM5 CM10 TOP OF PARAPET CM5 FRAMING TOP OF PARAPET TOP OF PARAPET CMU BL CK 2 TOP OF PARAPET CM T FRAMING RAVING OP OF PARAP T +72'-7 1/2" FRAMING +76'-3 3 4 +72'-7 1 /2" +72'-7 1 /2° +76'-0 1 /4° FRAMING 1 /2° oLBOTTOM OF ROOF DECK BOTTOM OF ROOF DECK,` BOTTOM OE ROOF DECK +71'-0" A.F.F. +71'-0" A.F.F. +71'-0" A.F.F. 3 W 3 W2 W 3 h SIXTH FLOOR SIXTH FLOOR ,� SIXTH FLOOR +60-6" A.F.F. AMS1 +60-6" A.F.F. � AMS1 +60-6" A.F.F. 3 W 3 W2 W 3 h FIFTH FLOOR FIFTH FLOOR � FIFTH FLOOR o +50'-0" A.F.F. +50'-0" A.F.F.+50'-0" A.F.F. ALOFT SIGNAGE DECALCLE w 4.1+-Iw *7EITLE 116� L+V=El M oL FOURTH FLOOR FOURTH FLOOR, SEE SPECIFICATIONS FOURTH FLOOR +39'-6" A.F.F. +39'-6" A.F.F. +39'-6" A.F.F. � W2 ® W 3 OL THIRD FLOOR THIRD FLOOR A413 2 THIRD FLOOR +29'-0" A.F.F. +29'-0" A.F.F. A413 w +29'-0" A.F.F. 3 3 W 3 W2 W 3 A443 A443 A444 SECOND FLOOR SECOND FLOOR SECOND FLOORi, +18'-6" A.F.F. +18'-6" A.F.F. - -- --- --- --- -- - - -- --- --- --- -- - - --- -- - - --- -- --- --- --- --- --- --- --- - - --- - - - --- -- lA A A 3 4 W4 W 3 1A A440 - A440 4 - - - - - - - - - - � -� - A440 - - - - - - - A440 oL FIRST FLOOR FIRST FLOOR ,� FIRST FLOOR 0'-0" A.F.F. 0'-0" A.F.F. A440 0'-0" A.F.F. 2 3 INGRESS/EGRESS A417 A417 ST1 ST1 FOOD SERVICE EXHAUST FAN. NGRESS/EGRESS ST1 FC1 LIGHTING ST1 SEE MECHANICAL AND FOOD LIGHTING MECHANICAL LOUVER. SEE MECHANICAL PARTIAL � R Tj I / L NORTH O R �j�j H PARTIAL /� R Tj � L NORTH O R Tj H SERVICE DRAWINGS. CENTER DRAWINGS. PAINT TO MATCH ADJACENT /� I� /� �I //�1 I� I� OF FAN TO BE 12'-6" AFT./� FINISH. (---4 iBIL®iNG �LEV TIOON(`313IL®INU �L� T10N(---2EAST BUILDING EELS T10N A302 SCALE: 1/16" = 1'-0' �12SCALE: 1/16" = 1'-0" A302 SCALE: 1/16" = TOP OF PARAPET FRAMING +72'-3" 1 2 3 A 4 1 A352 A352 A352 A352 A264 5 Al BEYOND LE VINYL PATTERN. VINYL PATTERN. MECHANICAL DRAWINGS. PAINT 1 BY SIGNAGE VENDOR BY SIGNAGE VENDOR 1 TO MATCH ADJACENT FINISH. A408 A407 A406 NORTH BUILMN� `LcVAT�ON �12SCALE: 1/16" = 1'-0" SECOND FLOOR,-i, till 7 V.1 V TOP OF PARAPET FRAMING D U T S CM5 R 2 A303 0.2 Q P.1 P MECHANICAL LOUVER. MECHANICAL DRAWINGS. MATCH ADJACENT VTAC LOUVER. SEE (MECHANICAL DRA�NINGS. N SEE PINT WALL FI TO ISH. M L.2 CM6 ® L K CM9 CM4 CM8 J CM9 3 TOP OF FRAMING H G F E.9 E CM4 CM9 1 A303 CM8 PARAP T � D C CM4 B.2 B TOP OF PARAPET FRAMING +75'-1 3/8" CM10 BOTTOM OF ROOF DECK +71'-0" A.F.F. W2 LE--Nl CM10 � SIXTH FLOOR � +60-6" A.F.F. Ll � LK W2 ® ® FIFTH FLOOR � +50'-0" A.F.F. Lf LE LK W2 I I� LE I I W3 I ® ® C FOURTH FLOOR � +39'-6" A.F.F. w wz 3 3 wz TOP OF PARAPET FRAMING 1 1 1 1 1 ® ® ® + - ® THIRD FLOOR � COMPOSITE METAL PANEL CM1 MFR: SOBOTECH COLOR: ALUMINUM STOREFRONT GEAR ANODIZED ALUMINUM SIZE: VARIES BOND: STACKED CM2 MFR: SOBOTECH COLOR: ANODIZED ALUMINUM -MATCH COLOR FC1 SIZE: VARIES BOND: STACKED CM3 MFR: SOBOTECH COLOR: MATCH COLOR -ANODIZED ALUMINUM SIZE: VARIES BOND: STACKED CM4 MFR: SOBOTECH COLOR: CASTLE GRAY SIZE: VARIES BOND: STACKED CM5 MFR: SOBOTECH COLOR: PURE WHITE SIZE: VARIES BOND: STACKED 1 MFR: SOBOTECH CM6 COLOR: BONE WHITE SIZE: VARIES BOND: STACKED CM7 MFR: SOBOTECH COLOR: AZURE BLUE SIZE: VARIES BOND: STACKED CM8 NOT USED CM9 NOT USED CM10 MFR: ALUCOBOND COLOR: CHESTNUT PVDF PRINT SIZE: VARIES BOND: STACKED MASONRY ST1 MFR: CROSSVILE - I NATURAL( PIETRA DI SAVOIA ANTRACITE TYPE: FIELD TILE COLOR: MATTE -BLACK SIZE: VARIES - 1X3(M) PANEL BOND: STACKED ALUMINUM SIDING OAMS1 MFR: LONGBOARD SOFFIT COLOR: WOOD PLANK-,HGHT CHERRY SIZE: VARIES - 6 X24 PANEL BOND: STACKED MFR: LONGBOARD SOFFIT MS COLOR: WOOD PLANK -,LIGHT FIR SIZE: VARIES - 6 X24 PANEL BOND: STACKED PRE -FINISHED METAL MTL1 COLOR: ALUMINUM STOREFRONT CLEAR ANODIZED ALUMINUM TL COLOR: ANODIZED ALUMINUM -MATCH COLOR FC1 TL COLOR: MATCH COLOR -ANODIZED ALUMINUM TL4 COLOR: BONE WHITE TL5 COLOR: WOOD PLANK - LIGHT CHERRY LONGBOARD SOFFIT TL5 COLOR: BRIGHT WHITE TL5 COLOR: LIGHT GRAY TL5 COLOR: COOL REGAL BLUE - DURA TECH 5000/ZINCALUME 1 4 2 U u w ICI a Scope Drawings: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. Revisions: ASI 02 09/21/2020 A\MARRIOT COMMENT REVISIONS XX/XX/XX �3 ASI 05 11/10/2022 "E� 11 Issue Date Issue Date Drawn By Checked By 5/26/202 RH Drawing Title: 11 419 Certified By:A 3 d •. No. AR00910036 STATE OF Drawing Number: 0 Project Number: 1 3 1.2� 10.4 ��\ 10.2 9.8 ��\ 9.2 IS T MEIAL COPING?%% T T ML --- --- --- - - - - - - - - 6 — — — - EMERGENCY SEE ELECTRICAL �.iiuul�ii i�i!iilil llir. IIII GAS SId SPECI ''.III-IIIII -ill ii lr. I IIII,I,III A UT OFF. ATIONS I'��''�i Ali �:I'�,Illllil,l. i„���... LI - 3s _ - NCR SS LIGH IN HOU EP Iluuu III �����:: II � inT llll CD EGRESS ONE ��Iiilu IIIIIIIii��Il�,ulAil'IIIL I j��l��,ui�,liiiiiiii inilllllilil cull I III �lau„iii lllllaiiillu.lnilllllii II - - _ IIIr,� �ail,ulll \ \ ��-1 l',i lil'���'� ILI — — 0 A440 — / _ EMERGEN Y SHUT OFF VALVE ACCESS PANEL APPLIED CLEAR SEE PLUMBING AND ELECTRICAL SPECIFICATIONS ST1 VINYL r'AI I LNN. BY SIGNAGE VENDOR ST1 ENLARuc-D EAST COURTYARD IZW�LDMG ELEVATION SCALE: 1'C" iOTTOM OF ROOF DECK +71'—C" A.F.F. SIXTH FLOOR +60-6" A.F.F. FIFTH FLOOR +50'-0" A.F.F. FOURTH FLOOR +39'-6" A.F.F. THIRD FLOOR +29'-C" A.F.F. SECOND FLOOR +18'-6" A.F.F. FIRST FLOOR 0'-0" A.F.F. PIARTIAL SOUTH VO l\ _ JJ IU GGJ E L EV A T O N SCALE: SECOND FLOOR, +18'-6" A.E.E. 12"Wx14"H LOUVER. SEE MECHANICAL SHEETS LOUVER L-3 FIRST FLOOR 0'-0" A.F.F. 1'-0" 3070M OF ROOF DECK +71'-0" A.F.F. SIXTH FLOOR +60-6" A.F.F. FIFTH FLOOR +50'-0" A.F.F. N 1 LINE 21U_hH (W ® LJC—I W4 ® L tl L n r l I II— I I I FOURTH FLOOR —_� +39'-6" A.F.F. ' ' I ' W4[F] EE THIRD FLOOR ' I CI nnD +29'-0" A.F.F. SCALE: 1/16" 1'C" APPLIED CLEAR VINYL PATTERN. EY TIGNAGE VENDOR WEST COURTYARD SCALE: 1, 11 1'-0" SECOND FLOOR +18'-6" A.E.E. FIRST FLOOR 0'-0" A.F.F. 2\ C� TEMO RM H KC COMPOSITE METAL PANEL CM1 MFR: SOBOTECH COLOR: ALUMINUM STOREFRONT CLEAR ANODIZED ALUMINUM SIZE: VARIES BOND: STACKED CM2 MFR: SOBOTECH COLOR: ANODIZED ALUMINUM — MATCH COLOR FC1 SIZE: VARIES BOND: STACKED CM3 MFR: SOBOTECH COLOR: MATCH COLOR — ANODIZED ALUMINUM SIZE: VARIES BON TACKED CM4 FR: S0BO CH COLOR: CASTLE GRAY SIZE: VARIES BOND: STACKED CM5 MFR: SOBOTECH COLOR: PURE WHITE SIZE: VARIES BOND: STACKED CM6 MFR: SOBOTECH COLOR: BONE WHITE SIZE: VARIES BOND: STACKED CM7 MFR: SOBOTECH COLOR: AZURE BLUE SIZE: VARIES BOND: STACKED CM8 NOT USED CM9 NOT USED CM10 MFR: ALUCOBOND COLOR: CHESTNUT PVDF PRINT SIZE: VARIES BOND: STACKED MASONRY MFR: CROSSVILE — NATURALI PIETRA DI SAVOIA ANTRACITE ST1 TYPE: FIELD TILE COLOR: MATTE — BLACK SIZE: VARIES — 1X3(M) PANEL BOND: STACKED 2 ALUMINUM SIDING OAMS1 MFR: LONGBOARD SOFFIT COLOR: WOOD PLANK —LIGHT CHERRY SIZE: VARIES — 6 X24 PANEL BOND: STACKED MFR: LONGBOARD SOFFIT MS COLOR: WOOD PLANK —LIGHT FIR SIZE: VARIES — 6 X24 PANEL BOND: STACKED PRE —FINISHED METAL MTL1 COLOR: ALUMINUM STOREFRONT CLEAR ANODIZED ALUMINUM TL COLOR: ANODIZED ALUMINUM — MATCH COLOR FC1 TL3 COLOR: MATCH COLOR — ANODIZED ALUMINUM TL4 COLOR: BONE WHITE TL5 COLOR: WOOD PLANK — LIGHT CHERRY LONGBOARD SOFFIT TL5 COLOR: BRIGHT WHITE TL5 COLOR: LIGHT GRAY TL5 COLOR: COOL REGAL BLUE — DURA TECH 5000/ZINCALUME 2 KEY PLAN 2 =4> mmJ u w 06 E LU a ZLo C c Scope Drawings: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. 0n the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of the work. Revisions: Al RR 11 07/06/22 > ASI 05 10/27/22 Issue Date 11 Drawn By Checked By Drawing Title: Certified By: O •. No. AR00910036 STATE OFA303 Drawing Number: Project Number: 1 3