Loading...
HomeMy WebLinkAboutCorrespondence 07/07/2005 16:55 3177769628 o Xen(vrr C. 'Wa/'d. SUrI1t'VOr ( ,priMc' (Pi.' 776-S4~)S 'Fax (J<< i} 776""9bi<'i .'Illite: IllS (Jill: .Hnm;{lolI (o"n~1 Square: .ftObfC:Slti[{C, Indi/1na 460(';(1-2.2.10 July 7,2005 Paul I. Cripe, Inc. ATTN: Joe Sharp 7172 Graham Road Indianapolis, IN 46250 VIA FACSIMILE: 841-4798 Re: Saddlebrook at Shelborne Dear Mr. Sharp: We have reviewed the constnlction plans submitted to the Hamilton County Surveyor's Office on June 16, 2005 for this project and have the following comments: 1. Please submit the following procedural items to this office, petition for Relocation and Rcconstruction 52.5 (Oak Tree Drain), petition for regulated subdivision, subdivision non-enforcement agreement, outlet permit (2 outlets), crossing permit (1 crossing - sanitary sewer), engineer's estimate, and all associated bonds for 120% of construction cost. The applications are available on our website at htto://www.co.hamilton.in.us. go to Departments, Surveyor, and Forms. Did not recehte. 2. The HCSO will NOT approve plans for multiple sections of a development, unless both sections are being completed at the same time and the bonding covers both sections. If this is being built in 2 phases at different times, the HCSO will require the 2nd phase to be removed from the plans or at minimwn "grayed out" and labeled as future (all sheets). If this is done, the plan approval process will only be approving the first section and additional section will need to come back at a later day for additional approval. The ~1lrreDt set of plans does define what section 1 is and what section 1 wUl be, it does not eUminate my major problem. I need to know what storm sewer is being installed now and what will be installed with section 2. Some how it needs to be shown that HCSO is only approving installation of section 1 storm sewer at tbis time. 87/87/2885 16:55 3177769628 o HAMILTON CO SURVEYOR o PAGE 82/83 3. Please include a copy ofthe secondary plat and landscape plans with the next submittal. While the landscape plans are mostly good, we do have a few conOids and concerns. On sheet LI05, a few new trees and some of the existing trees conOict with tile existing regulated drain easement, the pond outlet, and the emergenq overflow. On sheet LtOl, several trees conOid with the pipe from Str. EX-2 to 705. Please move some of these trees to be in compliance with our standards. 4. All area outside of the lots, I assume, is common area and will need to be dedicated as drainage easement. The plat still does Dot call oat common area as D.E. The ponds and several pipes are located in C.A. and are Dot covered under easement that we can access. ReSa requires C.A. to be D.E., bat we do Dot enforce the no tree poliey except for within 15' from the centerline of our pipes in the C.A. 5. As we are doing with other development along the J.W. Brendle Regulated Drain, we ask that a profile of the open ditch across the proposed project be completed and submitted this office. A future dredging project is being plans for the J.W. Brendle Regulated Drain and this infonnation is being requested to accelerate that process. Did Dot receive. 6. Please label the pipe size, length, aDd material on the utility plans. 7. Please include HCSO Standard Details: 0-4, C-5. C-6, C-7, and 0-12. Where are these IDeated? 8. Note S on sheets 301 to 305 have an incoJTe(:t 100 year elevations. 9. The SSD located within the swale that have a slope less then 1% must use double wall perforated pipe (HOPE) for the underdrain. Please label this in the consttuction plans. 10. The spot elevation on the emergency overflow for the pond (sheet C304) should be a 900.00, not a 901. 11. Please let Cannel Utilities or their design engineer that they need to contact us to make sure the proper depth is kept under the J. W. Brendle Drain. 12. Sanitary Sewer manholes 80lA, 803, and 827 do not meet our standard of30 feet from the top of bank of the open ditch. Either move the manholes to be in compliance with our standards or seek a variance from the standards from the Hamilton County Drainage Board. 13. Please note the additional comments maybe warranted at a later date. 07/07/2005 16:55 3177769628 Q HAMILTON CO SURVEYOR o PAGE 03/03 Should you have any questions, I can be reached at 317-776-8495. Sincerely, ~~ Greg Hoyes Plan Reviewer cc: Matt Griffin - Carmel DOCD John South - HCSWCD Dick Hill- Cannel Engineering Mike McBride - HCHD Mike Stikeleather - Leeds, LtC. .. . _~ o~o 3otJol! Sp - .. ......"--.- __.. __ - ..u.. .__.._ ------_._-~----------.------_.._-~_._._-----~--~-- C1 March 15,2005 JAMES BRAINARD, M>\YOR Mr. David Lach PaulL Cripe, Inc. 7172 Graham Road Indianapolis, IN 46250 RE: Saddlebrook at Shelborne, Section l-Project Review #1 Dear Mr. Lach: We have reviewed the construction plans submitted for the March 16,2005 Technical Advisory Committee meeting. We offer the following comments: GENERAL INFORMATION This information is repeated from the primary plat review. 1. The project site is located within current City of Carmel Corporate Limits. 2. Jurisdictions: . Interior and Exterior Streets and Right of Way, Curbs, Street Signs, Sidewalks - City of Carmel. . Water - City of Carmel Utilities . Sanitary Sewers - Clay Township Regional Waste District . Storm Sewers/Drainage - Hamilton County Surveyor's Office (City ofCal1l]el Review). . Regulated! Legal Drains - Hamilton County Surveyor's Office. 3. Board of Public Works and Safety Requirements:. . Water Availability . Additional Water Availability for Irrigation Systems. . Temporary Construction Entrance (if applicable and iflocated at a location other than planned permanent entrances). Please be advised that allY opell cuts of dedicated streets will require separate Board of Public Works and Safety approval. . Any permanent improvement (including irrigation systems) to be installed within dedicated right of way or dedicated easements. This approval would require a Consent to Encroach Agreement between the Owner/Developer and the City of Carmel. . Secondary Plat approval. . Right of Way Dedication (if applicable) A copy of the schedule for Board of Public Works and Safety meeting dates and agenda deadlines is included for your use. Please use the Engineering Department deadlines for submissions to the Board. AllY submission to the Board requires prior approval by the Carmel Clay Plan Commission and/or the Board of Zoning Appeals (ifapplicable) and completion of review by the Technical Advisory Committee. All written requests to be placed 011 the Board's agellda must include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission alldlor the Board of Zoning Appeals (if applicable). 4. T.A.C. Review/Drawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all Engineering Department, Carmel Utilities and Hamilton County Surveyor's Office issues have been resolved. The design engineer must certify all drawings submitted for final approval. Because of the dual jurisdiction between the City of Carmel and the Hamilton County Surveyor, we will require a minimum of eight-sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and will be signed by the City Engineer and by Carmel Utilities. The eight-sets will then be sent to the Hamilton County Surveyor's Office for approval and signatures. Three approved sets are to be returned to the City of Carmel. The Hamilton County Surveyor's Office will retain two-sets. The Developer, the Engineer and the Contractor will each receive one-set. DEPARTMENT OF El':GINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EIIMIL engineering@ci.carmeI.in.us .. 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way or dedicated easements will require a Consent to Encroach Agreement with the City of Carmel's Board of Public Works and Safetv. 6. Carmel UtilitieslWater Distribution should be provided copies of all drawings and revisions for review of water issues. They will provide a separate review regarding these issues. 7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water main locations. 8. I have included copies of the following for your use: . Subdivision Project Approval Procedures . Performance Release Procedure . Subdivision Building Permits . Permit Data, Contacts, etc. . Subdivision Sign requirements BONDING REOUlREMENTS 9. Individual Performance Guarantees will be required for the following subdivision improvements: . Streets (base, binder and surface). You may bond perimeter street improvements separately. . Curbs . Water Mains . Street Signs . Monuments & Markers. . Sidewalks (builders lot sidewalks and common area right of way sidewalks, perimeter right of way sidewalks and perimeter asphalt paths may be bonded separately). .Storm sewer bonding will be under the jurisdiction of the Hamilton County Surveyor's Office. They may also require bonding for Monuments & Markers. If that is the case, we will not require duplicate bonding. Sanitary sewers are under the jurisdiction of the Clay Township Regional Waste District. The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineers Estimates for each improvement including unit costs, quantities, materials and types of materials, etc. Upon completion and release of individual Performance Guarantees, a three-year Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. Performance Guarantees may be Performance or Subdivision Bonds, Irrevocable Letters of Credit or Cashier's Checks, Certified Checks or Official Checks. Please reference the enclosures for more detailed explanation of our procedures. AVAILABILITY AND CONNECTION FEES 10. Availability (acreage) Fees must be paid after all other Engineering Department requirements have been satisfied and prior to the start of construction activities. Availability Fees are based upon total platted acreage for the development at the current rate of$I,01O.00 per acre (Water Availability Fee). Based upon the overall indicated acreage, the following Water Availability Fees would apply: 60.2lOAcres @$1,01O.00/Acre= $60,812.00 Connection Fees are currently $1,310.00 for water per single-family residence. Connection Fees are paid when the infrastructure has been complete, satisfactory test results obtained and the subdivision has been released for permits. Water Connection Fees are paid on a oer-Iot basis. . if an irrigation system, swimming pool or clubhouse is planned for this development, or any future section of the development, additional Water Connection Fees will be assessed based upon the recommendation of the Director of Carmel Utilities. II. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations submitted for review to this office. We will share Crossroad's comments as they are received. When construction plans are submitted for T.A.C. review for this development, please provide 2-sets of plans and calculations to allow us to send the extra set to Crossroad and save some time in the review process. COMMENTS - CONSTRUCTION PLANS 12. As discussed at T.A.C., approval will only be provided for Phase I. Please revise drawings appropriately. 13. Please indicate in title on cover sheet which section number and/or phase number these construction plans are for. 14. Please provide copies of the secondary plat for review. 15. Please provide drainage calculations to this office and to our drainage review consultant if not provided to them. .o'l. .'\ 16. It is apparent that some off-site easements will be necessary to install the sanitary sewer. These easements must be secured prior to the Department of Engineering approving the drawings. 17. Please provide horizontal curve data on street plan/profile sheets. 18. On Site Plan, Site Development Plan, and Intersection and Cul-de-sac Detail, please indicate and label right- of-way radius at cul-de-sac terminal end to be 50 feet. 19. All lots adjacent to side yard easements should be wide enough to accommodate the anticipated house model and any planned driveways such that there is no encroachment in the easements. 20. Please provide a separate entrance plan which details the auxiliary lanes and passing blister, entrance geometry and dimensions, and a detailed grading plan. 21. Please indicate widening across the property frontage or to the extents of the auxiliary lanes, whichever is greater for 15-foot travel lanes on the property side of Shelbome Road. Auxiliary lanes shall be measured from the edge of the 15-foot travel lane. Please add a note to the site plan that all existing pavement shall be sawcut to a clean edge where new pavement (for widening or for auxiliary lanes) is to be installed adjacent to existing pavement. Any new pavement placed in the Shelbome Road right-of-way for widening, for auxiliary lanes and for each entrance up to the mainline right-of-way limit shall meet the following section: 1.5 inches HMA #11 surface on 2 inches HMA #8 binder on 3 inches HMA #5D base on 7 inches #53 stone on 4 inches #2 stone or match existing, whichever is greater. Please delineate this section with hatching on the plans and appropriate reference in the legend. A 3-foot wide shoulder of#73 stone at a minimum depth of six inches is required along the widening and auxiliary lanes. Subsurface drain is required beneath the stone shoulder. 22. The City typically requires I" milling with 1.5" H.A.C. #11 resurfacing for the entire width of the existing roadway across the property frontage or to the limits of the auxiliary lanes, whichever is greater. The roadway would then also need to be restriped with thermoplastic striping. Please develop a plan for the restriping and for striping of the auxiliary lanes. Please add a note to this plan that all striping shall be thermoplastic. Please delineate the milling and resurfacing areas with hatching on the plans and appropriate reference in the legend. 23. All paving within the existing and proposed City right-of-way shall conform to the requirements of the Department of Engineering. Please add a note to the drawings that the Contractor shall contact the Department of Engineering to schedule a pre-construction meeting to review the Department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the Department as it relates to work within the existing and proposed City right-of- way. 24. The Department requests that any general or plan notes, details, or specifications be revised or added to appropriate sheets to accommodate the following requirement for installation within existing and proposed City right-of-way: "Bedding, h,aunching and initial backfill materials, placement and compaction for water mains, water service laterals, sanitary mains and sanitary service laterals shall be in accordance with the standard practice of the utility that has jurisdiction over the installation. Final backfill for water mains, water service laterals, sanitary mains and sanitary service laterals under and within 5-feet of pavement (including sidewalks) shall be B-Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6-inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6-inches of the excavation below the start ofthe aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less than 95% Standard Proctor Density. Ifthe standard practice of the utility that has jurisdiction over the installation has a more stringent final backfill requirement, the more stringent requirement shall govern." and that these installations conform with the following minimum cover requirements: "For installation of Storm Mains, Water Mains, Sanitary Mains, Water Service Laterals, Sanitary Service Laterals under City streets, regardless of the jurisdiction of the utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be the pavement section thickness (all bituminousand aggregate material above the subgrade) plus ]-0". If the standard practice of the utility that has jurisdiction over the installation has a more stringent cover requirement, the more stringent requirement shall govern." 25. The Department requests that any general or plan notes, details, or specifications be revised or added to appropriate sheets to accommodate the following requirement for installation within existing and proposed City right-of-way. The Department assumes that the storm system will be a private system, but recommends that the entire storm system be constructed to meet the following requirements to facilitate future acceptance by the City: "Bedding, haunching, and initial backfill for all RCP installations shall be B-Borrow for Structure Backfill meeting the material requirements of the INDOT. Bedding shall be placed in the trench bottom such that after the pipe is installed to grade and line, there remains a 4-inch minimum depth of material below the pipe barrel and a minimum of3-inches below the bell. For pipe sizes 66-inches and larger, the minimum depth of material below the pipe barrel shall be 6-inches. Bedding shall be placed to be uniform as possible, but shall be loosely placed uncompacted material under the middle third of the pipe prior to placement of the pipe. Haunching and initial backfill shall be compacted in 8-inch maximum lifts to not less than 90% Standard Proctor Density for the entire depth of the material placed. The backfill shall be brought up evenly on both sides of the pipe for the full length of the pipe. Haunching shall extend to the springline of the pipe. The limit of initial backfill shall be 6-inches above the springline. Minimum trench width shall be the outside diameter of the pipe plus 18-inches. Final backfill for all RCP installations under and within 5- feet of pavement (including sidewalks) shall be B-Borrow for Structure Backfill meeting the material requirements of the INDOT and shall be compacted in 6-inch maximum lifts to not less than 95% Standard Proctor Density for the entire depth of the material placed. The backfill for the top 6-inches of the excavation below the start ofthe aggregate subbase of the pavement shall be No. 53 Stone meeting the material requirements of the INDOT and shall be compacted to not less than 95% Standard Proctor Density. Final Backfill for all RCP installations greater than 5-feet from any pavement shall be clean fill material free of rocks larger than 6-inches in diameter, frozen lumps of soil, wood or other extraneous material, compacted in 12-inch maximum lifts to not less than 90% Standard Proctor Density for the entire depth of the excavation." and that these installations conform with the following minimum cover requirements: "For installation of Storm Mains, Water Mains, Sanitary Mains, Water Service Laterals, Sanitary Service Laterals under City streets, regardless of the jurisdiction of the utility, the minimum cover from the top of the installed pavement to the top of the installed pipe shall be the pavement section thickness (all bituminous and aggregate material above the subgrade) plus 1-0". If the standard practice of the utility that has jurisdiction over the installation has a more stringent cover requirement, the more stringent requirement shall govern." 26. Please provide a traffic control plan. On the traffic control plan, please include a note that all traffic control signs are installed by the City and require an ordinance. 27. Please provide detention volume for the fully developed Thoroughfare Plan right-of-way for Shelborne Road. 28. On sanitary sewer plan/profile sheets, add a note that there are to be no manholes in the pavement, curbs, or sidewalks. 29. On the water distribution plan, add a note that there are to be no manholes or water valves in the pavement, curbs, or sidewalks. 30. Sheet C206 - Site Details . In SRIO - Typical Street Section, please align outside edge of subsurface drain trench with back of curb. Also please change the back-of-curb to back-of-curb dimension from 28 feet to 30 feet. . Please add the City of Carmel sidewalk standard (copy enclosed). 31. Sheet C207 - Site Details . The Department requires that the on-site pavement meet the following section: 1.5 inches H.A.C. #11 surface over 2 inches H.A.C. #8 binder over 3 inches H.A.C. #5D base over 7 inches #53 stone. Please revise detail PV -36, Asphalt Pavement Section, to reflect this. . Please add a note that all paving is to be completed in one paving season. . The Department requires that the on-site asphalt path meet the following section: I inch H.A.C. #11 surface over 2 inches H.A.C. #8 binder over 5 inches #53 stone. Please revise detail PV-36P, Asphalt Path Pavement Section, to reflect this. . Please replace Hamilton County Highway Department pipe underdrain detail with City of Carmel pipe underdrain detail. These comments represent the Department of Engineering's initial review ofthe construction plans for this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. The Department reserves the right to provide additional comments based upon subsequent reviews. It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The plans will be submitted to the City's consultant for drainage review when drainage calculations are provided. Comments from the drainage review will be forwarded to your office when the review is complete. If you have questions, please call me at 571-2441. . cc: Jon Dobosiewicz, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office John South, Hamilton County Soil & Water Project File Copy Engineering Department Review S:\DHILL\PROJREV05\SADDLEBROOKA TSHELBORNEl '~- ~ ;:~-- ~ .. City of Carmel Via Fax: 317.841.4798 Original by mail March 15,2005 Michael Stikeleather Leeds, LLC 5300 Hessler Road Muncie, IN 47304 RE: Saddlebrook at Shelborne, Section One, Secondary Plat Application #05030004 SP Dear Mr. Stikeleather: This letter is in response to your secondary plat application for Saddlebrook at Shelborne Section One Secondary Plat. The following issues must be resolved: The following must be indicated on the plat: 1. Please replace the term "final plat" with "secondary plat" in the title 2. Primary Plat Docket Number 04080059 PP 3. Secondary Plat Docket Number 05030004 SP. 4. Source of title of ownership. 5. The date of the latest revision 6. The director signature block is only needed on the signature page (sheet 11). Please remove from others. 7. Concrete monumentation is only needed at the subdivision boundary comers (not for the individual sections). There should be only 5 concrete markers indicated for this section. 8. Please add complete curve table and notes. 9. Required landscape easements must be shown on the plat. Please provide. 10. Provide the signed subdivider agreement form, per chapter 9.06 of the Subdivision Control Ordinance, for the file. Concerns and Comments are as follow: 1. Please provide a complete landscaping plan. 2. Please ensure all landscape plantings are outside of drainage easements. 3. A copy of the landscape plan approvalletter/e-mail from the Urban Forester is required prior to plat approval and signature. 4. The pedestrian path running north and south in Block A (connecting the Homestretch Drive sidewalk to the southern pedestrian path) should be 8 feet wide, matching the width of the southern path. Please wait to submit revised materials until after the Technical Advisory Committee (T AC) has met on this application. The resubmitted materials should include edits addressing the above comments along Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 - ..~ .~ --~-~; with any requirements that arise from the T AC meeting. Additional comments may be made after the requested revisions have been submitted. Matthew Griffin, ICP Planning Administrator Saddlebrook at Shelbome Section One - SP Page 2 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 ,:i 7' --,.. <,I. '. CITY OF CARMEL Department of Community Services One Civic Square Carmel, IN 40032 (317) 571-2417 Fax: (317) 571-2426 Fax To: (v1 .tlt i ~1~~t~6V Fax: e~ I i1 qB From: M,0{2-(rF1rJ ~ '3/\~/d9 . Pages: Phone: Date: Re:0PiJJ I(p~vpv l ~{ cc: o Urgent ~or Review 0 Please Comment 0 Please Reply o Please Recycle " ~ 83/11/2885 15:34 3177769628 HAMILTON 00 SURVEYOR PAGE 01/03 :Kenton C. '1.clard, Sllrltcvor , (NiDI/(: (317) 776-S4-~5 'Fax (317) 776-_L~6~S Sidle l<~g Om' ,71om/lfelll COIIIl~' $fJllfll'l! ...Yobt('srliflc, 'I7JlanG 4-bl'{;ll-.1 ~ '9 4><:9 ~ ~ ~/A. ~11 / I - '(:lJ ~a ~tb$ ~Jl Re: Saddlebrook at Sbelbome March 11, 2005 Paull. Cripe, Inc. ATTN: Joe Sharp 7172 Graham Road Indianapolis, IN 46250 VIA FACSIMILE; 841-4798 Dear Mr. Sharp: We have reviewed the constniction plans submitted to the Hamihon County SUlVeyor's Office on March I, 2005 for this project and have the following comments: 1. This project falls within thejurisdietion of the City of Cannel. 2. This proposed project DOBS NOT fall in a Carmel Watershed Protection Area. 3. Please submit the following procedural items to this office, petition for Relocation and Reconstruction 52.S (Oak Tree Drain), petition [or regulated subdivision, subdivision non-enforcement agreement. outlet permit (2 outlets), crossing permit (2 crossing ~ water and sanitary sewer), engineer's estimate, and all associated bonds for 120% of construction cost. The applications are available on our website at httD:/Iwww.co.hamilton.in.us. go to Departments, Surveyor, and Fonns. Pleue note a Dew PetitioD lor Regulated Draia Subdivision is posted 08 the website. 4. The HCSO will NOT approve plans for l11ultiple sections of a development, unless both sections are being completed at the same time and the bonding covers both sections. lfthi$ is being built in 2 phases at different times, the HCSO will require the 2nd phase to be removed from the plans or at minimum "grayed out" and labeled as future (all sheets). If this is don~ the plan approval process will only be approving the first section and additional section will need to come back at a later day for additional approval. 83/11/2885 15:34 3177769628 HAMILTON CO SURVEYOR PAGE 82/83 S. Please include a copy of the seeondaryplat and 1anc1s"ape plans with the next submittal. 6. Please submit complete drainage calculations as soon IS possible for the appropriate review. 7. All area outside of the lots, I assume, is common area and will need. to be dedicated as drainage easement 8. As we are doing with other development along the J.W. Brendle Regulated Drain. we uk that a profile of the open ditch across the proposed Pl'Oject be completed and submitted this office. A future dredging project is beiDc plans for the J.W. Brendle Regulated DnUn and this information is being requested to accelerate that process. 9. A few of the storm pipes do not ha"c adequate easement on both sides of the pipe. IC 26-9-27-33 requires that all regulated drain storm pipes have a minimum of IS feet of easement ofBOm sides from the centerline of the pipe. Please either shift the pipes in the current easements or change the easements to accommodate this statue. 10. The outlet for the new pond. crosses property owned. by others. Ifwill be located entirely within existing regulated drain easement, so new easement will not be required, but we will expect the property owner be contactecl to let him know what is going on. A written aclmowleclgemcmt. copied to our office, would be the preferred method. 11. The pipe from struaure EX-2 to structure 708 will need to be 12" RCP with an 8tt pieoe of plastic pipe (C-900 or similar) grouted into the pipe to act as the orifice. 12. The pipe ftvm structure 701 to 702 will need to be RCP. 13. On sheet C703, it appears that TC of structure 724 is about 2 feet to low; HCSO does not allow buried structures. 14. The pipe run from stzucture 724 to 733 does NOT have the require cover to meet HCSO Standards or the City of Carmel Engineer Department Standards. Please revise. 15. Please show the location of all curb SSD on the P & P sheets to avoid conflicts with stann pipes. 16. The slope of pipe run 759 to 758 appears to be extremely high. The HCSO will not allow a velocity in this pipe to exceed 10 tps. This will require out baDk armorment detail (0.-4 - please include in plans) and additional annorment may be required do to the discharge velocity. . '~03/11/2005 15: 34 3177769628 HAMILTON CO SURVEYOR PAGE 03/03 17. The HCSO would prefer to see double wide boxes, for the double inlets, .rather then the detail proposed on C707. 18. Please label the swale slopes on the grading plans. Also label the pipe size, length, and material on the utility plans. 19. The sanitary sewer and water crossing do not appear to meet our minimum requirement for the depth under the flowline of an open regulated drain (C-6). Please look at and revise. 20. The HCSO has new standard details for the required castings. The details are available for download on our website at http://www.co.hamilton.in.us. &0 to Departments. Surveyor, and Documents for Download. The details are CT -1, CT -2, CT..4, CT-S, CT-6, CT-', CT-8, and CT-IO. These are our required casting and any other casting must be approved by this office. Please include all the appropriate details for this site in the construction plans and change the casting references. 21. All casting should be labeled "Dump No Waste - Drains to Waterway," which are readily available now from local casting distributors. Please add a note to the plans that will make the contractor away of this requirement. 22. Please include HCSO Standard Details: 0-4, C-6, C-7, and 0-12. 23. Please note the additional comments may be warranted at a later date. Should you have any questions, I can be reached at 317-776-8495. Sincerely, ~~ Greg Hayes Plan Reviewer CC: Jon Dobosiewicz - Carmel DOCD John South - HCSWCD Dick Hill- Carmel Engineering Mike McBride - HCHD Mike Stikeleather - L~ LLC. Carmel March 4,2005 Sheila M. Wakelam Cripe 7172 Graham Road Indianapolis, IN 46250 RE: Saddlebrook at Shelborne Job # 010463-20100 Dear Ms. Wakelam: I have received and reviewed the information for the above mentioned project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, ~ ])c/~ Michael D. Fogarty Chief of Police MDF:vb cc: Dept. of Community Services (317) 571.2500 A Nationally Accredit rcement Agency Fax (317) 571.2512 City of Carmel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 Voice (317) 571-2600 Fax (317) 571-2615 Fire Prevention Bureau Sheila Wakelam Paul E. Cripe 7172 Graham Rd. Indianapolis, IN 46240 RE: Saddlebrook at Shelborne LETTER OF APPROVAL The undersigned has reviewed the proposed plans for Saddlebrook at Shelborne and has approved the plans subject to the following: 1. Will this project include an amenity building? If so, our office will request the installation of a Knox Box for emergency access. An application for the Knox box can be obtained through our office. 2. Our office, in conjunction with the Department of Community Development, are requesting in newly platted subdivisions, fire hydrant makers be installed in the street pavement perpendicular to the fire hydrant. This will allow the fire department to more easily spot fire hydrants during an emergency. 3. 4. 5. 6. Please respond to the above noted condition(s) in writing and submit to our office prior to the scheduled Technical Advisory Meeting for this project. Date: March 4.2005 By: Gary Hoyt, Fire Marshal Carmel Fire Department Construction/Stormwater Pollution Prevention Plan Technical Review and Comment (Form 1) Project Name: Saddlebrook at Shelbome Plan Submittal Date: 03/01/05 Hydrologic Unit Code: Project Location Description: East side of Shelbome Rd, 1/4 mile north of 116th Street Latitude and Longitude: Lat- 39-57'-34"N Long- 86-13'-11" = Civil SW Section: = i Project Owner Name: Leeds LLC E Contact: Michael Stikeleather = 'i3 Address: 5300 Hessler Road "'" . 't City: Muncie 'S Phone: 765-282-1010 ... ~ Plan Preparer Name: Sheila Wakelam Affiliation: Cripe Engineering Address: 7172 Graham Road City: Indianapolis Phone: 317 -842-6777 County: Hamilton 5120201120080 FAX: State: IN 765-282-2218 Zip: 47304 E-Mail: FAX: State: IN 317-841-4798 Zip: 46250 E-Mail: Review Date: 03/24/05 ~ Principal Plan Reviewer: John B. South P.E. CPESC .~ Agency: Hamilton County Soil and Water Conservation District Q,I ~ Address: 1108 South 9th Street ; City: Noblesville a: Phone: 317-773-2181 Assisted By: FAX: State: IN 317-776-1101 Zip: 46060 E-Mail: john-south@iaswcd.org PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the plan satisfies the minimum requirements and intent of 327 lAC 15-5. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOl to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NOL A NOl must also be sent to the SWCD, o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and revisions to the plan may be required at that time to address deficiencies. o Please refer to additional information included on the following page(s). o Submit Notice ofIntent (NOI): Attach a copy of this cover page when submitting the NOl to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NOL A NOl must also be sent to the SWCD, o PLAN IS DEFICIENT: Significant deficiencies were identified during the plan review. o Please refer to additional information included on the following page(s). o DO NOT file a Notice ofIntent for this project. o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re- submitted, and notification has been received that the minimum requirements have been satisfied. Plan Revisions should be mailed or delivered to the Principal Plan Reviewer identified in the Plan Review Section above. DNR, Division o/Soil Conservation Page 1 of 1 Revised 12/09/03, Form 1 v b o 7172 Graham Road Indianapolis, IN 46250 317-842-6777 FAX: 317-841-4798 www.cripe.biz TRANSMITTAL I Date: 03/01/05 I PIC Job #: 010463-20100 To: Jon C. Dobosiewicz, Planning Administrator Carmel Department of Community Services One Civic Square Carmel, IN 46032 Phone: (317) 571-2417 Fax: (317) 571-2426 Re: Saddlebrook at Shelborne Secondary Plat / TAC Meeting We are sending you the following items via: Hand Delivery Shop Drawings X Prints Plans Samples Specifications Copy of Letter Change Order Attached Report Other Copies Date Description 2 03/01/05 Construction Drawings for March 16, 2005 T AC Meeting. 2 Secondary Plat Application and (1) copy THESE ARE TRANSMITTED as checked below: For Approval Submit Approved as Submitted Copies for Approval X For Your Use Return Approved as Noted Copies for Distribution As Requested Not Approved Reviewed for Compliance Signature Requested Resubmit Corrected Prints For Review and Comment I Remarks: Please review these drawings for the March 16,2005 TAC Meeting. Signed: Sheila M. Wakelam I c: T AC Members I Transmittal Only: Joe Sharp, PI;, Sara Taylor, David Lach, PE Notice: The drawing/computer files listed above are the property of Paull. Cripe, Inc. and are transmitted for reproduction use only. Any modification or reuse of the documents without written permission from Paull. Cripe, Inc. is prohibited. Any person or entity using these documents for any purpose other than the project for which they were originally intended, with or without permission from Paul I. Cripe, Inc., by their use agrees to indemnify and hold harmless Paul I. Cripe, Inc. from any loss, including, but not limited to attorney's fees occurring from thei~u~~. O:\2004I040427120000IDOCSIPERMITSIT ACTRANS020105.DOC Village of WestClay section 1 0012 SP contact; Kevin Krulik 574-3400 574-3919 fax kevink@brenwick.com . e-~/ ;)~V IS 001 ~()