Loading...
HomeMy WebLinkAboutC102 STORMWATER POLLUTION PREVENTION PLAN PHASE 3E(A)W W W WWWWWWWWWWWWWWWWW W W W W W W W W W W W WWWWWWWWWD DDDDDDDDD D D D D D DDDDDD D D DDDDDDDDDDDDDDDDDDDDCCCCCCCCCC C C C EEEEEEEEEEEEEEWWW W W W W STM STM ST M ST M ST M ST M ST M ST M 14 14 14 14 14 15 S61 ° 2 3 ' 4 8 " E 2 2 2 . 1 8 'S28°40'59"W 192.79'S61 ° 1 9 ' 0 1 " E 3 0 7 . 8 5 'S30°37'31"W 41.71'S72°09'4 2 " W 1 2 3. 1 8' S89°03'11"W 423.55' DELTA=10°10'10" R=3036.83' T=270.22' L=539.01' CH BRG=N20°36'00"E CH LEN=538.30' PR O P O S E D H O T E L 50, 3 2 1 S F FF E = 8 7 2 . 8 5 M F P G = 8 6 8 . 4 9 M L A G = 8 7 1 . 9 0GGGGGGGGGGG G G G INSTALL HEAVY DUTY NYOPLAST STRUCTURE WITH 2'X2' GRATE TC=870.50 INV=868.00 CORE DRILL TO CONNECT TO EXISTING INLET INV=867.30 65' OF 10" HDPE @ 1.0%STMEX. POND 11 W W W W W W W * IP IP IP IP IP IP CONTACT PERSON FOR EROSION CONTROL & SEDIMENT PRACTICES WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, IN 46268 TELEPHONE: (317) 846-6611 FAX: (317) 843-0546 EMAIL: PARKERF@WEIHE.NET CONTACT PERSON: FRED PARKER, CPESC -WARNING- THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. -NOTE- THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AFTER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. DISTURBED ACREAGE = 1.80± AC. C102STORMWATER POLLUTION PREVENTION PLAN PHASE 3w190175-C101 swppp2SWPPP PHASE 2 LEGEND - INLET PROTECTION - ONLY COMPLETELY BELOW THE GRATE PROTECTION IS ALLOWED IN THE PUBLIC RIGHT-OF-WAY - PERMANENT/TEMPORARY SEEDING USE PLANTING CHART - EROSION CONTROL BLANKET - USE S150BN BIO-NET AS SUPPLIED BY NORTH AMERICAN GREEN OR APPROVED EQUAL - LIMITS OF DISTURBANCE (CONSTRUCTION LIMITS) - SITE DISCHARGE POINT - MULCH -RIPRAP, REFER TO SHEET C601 FOR SIZING IP * D LINE TYPES UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN RIGHT OF WAY LINE CHAIN LINK FENCE BOARD FENCE WROUGHT IRON FENCE GUARD RAIL HAND RAIL SILT FENCE BUILDING SETBACK LINE BOUNDARY LINE FLOW LINE G G G W W E(A)E(A) E E E C C C C(A)C(A) OHU OHU FM FM SF SF AERIAL FIBER OPTIC CABLEFO(A)FO(A) SECTION LINE FARM FENCE UNDERGROUND FIBER OPTICFOFO INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER STORM SEWER EROSION CONTROL NOTES 1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS. 2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE TO FOLLOW CONTOUR. 3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET. EROSION CONTROL SPECIFICATIONS 1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. 2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS. 3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. 4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. 5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. 6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. 7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. 8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER. 9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. 11.PORTABLE TOILETS MUST BE ANCHORED.RUSSELL L . W EBST E R I I PR O FESSION A L E N GINEERREG IS T ER E DIND I A N A PE11900318 STATE OF NO.REVISIONS AND ISSUESPart of the NW/4 of Section 26, Township 18 North, Range 3 East, Clay Township, Hamilton County, IndianaW19.0175PREPARED FOR:13285 ILLINOIS ST. CARMEL, IN 46032PROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:RLWDESIGNED BY:DWG NAME:PROJECT NO.:W19.0175DATEBY11.13.2019SSRDATE:RLWKnow what's below. before you dig.Call R SAAMRAJYA, LLCPLANS SUBMITTED FOR REVIEW05.15.2019RLWW S N E ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMRUSSELL L. WEBSTER II, PE No. 11900318 PLAN CERTIFICATE NOTE: ORIGINAL ALTA, TOPOGRAPHY, UTILITIES, STORM SEWERS, AND ALL OTHER EXISTING CONDITIONS ITEMS WERE PREPARED BY SCHNEIDER CORP. WEIHE ENGINEERS, INC. AND RUSSELL L. WEBSTER II ACCEPT RESPONSIBILITY ONLY FOR THE SITE IMPROVEMENTS RELATED TO THE LIMITED ENGINEERING SCOPE SHOWN ON THESE PLANS.PLANS REVISED FOR TAC COMMENTS05.15.2019RLWPLANS REVISED FOR TAC COMMENTS11.13.2019RLWAPPROVAL PENDINGNOT F OR C O NSTR UCTI O N LAND DESCRIPTION LOT 3 OF CMC PROPERTIES SUBDIVISION SECTION 2 RECORDED AS INSTRUMENT NUMBER 2006057917 IN THE OFFICE OF THE RECORDER OF HAMILTON COUNTY. BENCHMARK INFORMATION VERTICAL DATUM: NAVD 88 (GEOID 12B) SITE TEMPORARY BENCHMARKS (TBM) ORIGIN DERIVED FROM TRIMBLE VRS NOW NETWORK GPS REFERENCE STATION IN_HAMC TBM 500: A 5/8 INCH DIAMETER REBAR WITH RED CAP STAMPED "SCHNEIDER RANDOM POINT" LOCATED APPROXIMATELY CENTER OF SUBJECT PROPERTY. ELEVATION 871.94 (NAVD 88) TBM 501: MAG. NAIL & WASHER STAMPED "SCHNEIDER RANDOM POINT" SET IN TOP OF CURB, 34 FEET SOUTHEAST OF NORTHWEST CORNER OF THE SUBJECT PROPERTY. ELEVATION 871.51 (NAVD 88)