Loading...
HomeMy WebLinkAboutC200 SITE PLAND DDDDDDDDD D D D D D DDDDDD D D D DDDDDDDDDDDDDDDDDDD14 14 14 14 14 15 S61 ° 2 3 ' 4 8 " E 2 2 2 . 1 8 'S28°40'59"W 192.79'S61 ° 1 9 ' 0 1 " E 3 0 7 . 8 5 'S30°37'31"W 41.71'S72°09'4 2 " W 1 2 3. 1 8' S89°03'11"W 423.55' DELTA=10°10'10" R=3036.83' T=270.22' L=539.01' CH BRG=N20°36'00"E CH LEN=538.30' PR O P O S E D H O T E L 50, 3 2 1 S F FF E = 8 7 2 . 8 5 M F P G = 8 6 8 . 4 9 ML A G = 8 7 1 . 9 0 EX. POND 11 E(A)P4 P4 P4 P4 P4 H1 H1 H1 H1 H1 H1 H1 H2 H2 B1 B2 B2 B2 H6 H6 H6 H6 H6 H6 H3 H3 H8 H7 H9 A2 A2 A3 S2 TYP. S3 H8 H7 S3 H7 H8 H7 H7 H7 H8 H8 H7 S3 S3 S3 S4 TYP. S4 TYP. S4 TYP. S4 TYP. S5 TYP. A2 A2 A2 A2 H10 P3 P3 P3 P3 H1 H6 H1 H1 H1 S6 S6 S6 H9 P2 H7 C200SITE PLANw190175-C200 siteSITE PLAN GENERAL NOTES 1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION. 2.ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF WORK SECTION ARE ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS. 3.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS; FINAL RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN DEPTH. IN ADDITION, EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER. 4.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO MAINTAIN QUALITY CONTROL THROUGHOUT THIS PROJECT. 5.TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL STANDARDS. 6.BEARINGS, DIMENSIONS, AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD SURVEYS AND PLATS FOR EXACT INFORMATION. 7.THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE PROJECT. 8.ALL DIMENSIONS ARE BASED ON FACE OF CURB OR BACK OF ROLL CURB OR FACE OF BUILDING. 9.SEE ARCHITECTURAL PLANS FOR DETAILS OF BUILDING, BUILDING DIMENSIONS AND SIGNAGE SPECIFICATIONS. DO NOT STAKE BUILDING FROM THESE PLANS. 10.COORDINATE CONSTRUCTION ACTIVITIES WITH ADJOINING WORK IF APPLICABLE. VERIFY EXTENT OF ADJOINING WORK AND COORDINATE AS REQUIRED. 11.FIELD VERIFY EXISTING CURBS AND TAPER PROPOSED VERTICAL CURBS TO MATCH WITHIN A MIN. OF THREE (3) FEET. 12.± DIMENSIONS INDICATE FIELD DIMENSION ADJUSTMENT AREA BASED ON ACTUAL FIELD LAYOUT COORDINATES. 13.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO START OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 14.PROVIDE SMOOTH TRANSITION FROM NEWLY PAVED AREAS TO EXISTING AREAS AS NECESSARY. ALL AREAS WHERE PROPOSED PAVEMENT MEETS EXISTING PAVEMENT, THE EXISTING EDGE OF PAVEMENT SHALL BE FREE OF ALL LOOSE DEBRIS. THE EDGE OF EXISTING ASPHALT PAVEMENT SHALL BE PROPERLY SEALED WITH A TACK COAT MATERIAL IN ALL AREAS WHERE NEW ASPHALT PAVEMENT IS INDICATED TO JOIN EXISTING. 15.RESURFACE OR RECONSTRUCT AT LEAST TO ORIGINAL CONDITIONS ALL AREAS WHERE THE EXISTING PAVEMENT OR LAWNS ARE DAMAGED DURING CONSTRUCTION FROM TRAFFIC BY CONTRACTORS, SUBCONTRACTORS, OR SUPPLIERS AFTER CONSTRUCTION WORK IS COMPLETE. 16.THE CONTRACTOR SHALL PROTECT AND NOT DESTROY THE PROPERTY CORNER MONUMENTS DURING CONSTRUCTION. 17.REFER TO ARCHITECTURAL PLANS FOR BUILDING ACCESSORY DETAILS. 18.REFER TO SHEET C201 FOR SITE PLAN DETAILS UNLESS OTHERWISE NOTED. 19.ALL ON-SITE STORM SYSTEM WILL BE PRIVATE. SITE DATA SITE AREA = 3.37 AC BUILDING AREA TOTAL=50,321 SF PERCENT IMPERVIOUS = 59% ZONING = MC REAR YARD BSL REQUIRED = 20 FT REAR YARD BUFFER = 15 FT SIDE YARD BSL REQUIRED = 15 FT SIDE YARD BUFFER = 20 FT PARKING REQUIRED: PARKING REQUIREMENT: 1 PER 200 SF OF COMMERCIAL, 1 PER HOTEL ROOM 6318 200 =32, 102 ROOMS PARKING REQUIRED = 134 SPACES PARKING DIMENSIONS = 9'x18', 9'x20' BIKE PARKING REQUIRED SHORT TERM = 4 SPACES (6 PROVIDED) LONG TERM = 7 SPACES WITHIN BUILDING PARKING PROVIDED: 91 - NEW STANDARD SPACES 5 - NEW ADA SPACES 96 - TOTAL NEW SPACES REMAINDER OF REQUIRED PARKING IS SATISFIED BY RECIPROCAL PARKING AGREEMENT (DMS 4483639v3) FOR THE ENTIRE CMC DEVELOPMENT. SITE PLAN NOTES PAVEMENT STANDARD DUTY ASPHALT PAVING STANDARD DUTY CONCRETE WITH 1' CHAMFERED CORNERS STORM INLET WITH CONCRETE APRON SHOWN ON SHEET C302 MATCH EXISTING PAVEMENT HARDSCAPE 6" STRAIGHT CURB INTEGRAL WALK AND CURB MATCH EXISTING CURB TAPER CURB WITHIN 3 FEET CONCRETE PARKING BARRIER CONCRETE SIDEWALK ACCESSIBLE RAMP PAVEMENT FLUSH WITH SIDEWALK TRANSFORMER PAD LOCATION CONCRETE FLUME THROUGH CURB BUILDING ACCESSORIES DUMPSTER ENCLOSURE CANOPY/PORTE COCHERE/AWNING ACCESSORIES BOLLARD LIGHT POLE AND BASE BIKE PARKING SIGNAGE & MARKINGS POLE/GROUND SIGN LOCATION ACCESSIBLE PARKING SPACE PEDESTRIAN CROSSWALK 4" PAINTED WHITE SOLID LINES (TYP) 4" PAINTED WHITE SOLID LINE ISLAND NATIVE PLANTING PROTECTIVE SIGNAGE H1 H2 H3 H4 H5 H6 H7 H8 H9 B1 B2 A1 A2 A3 S1 S2 S3 S4 S5 P1 P2 P3 P4 RUSSELL L . W EBST E R I I PRO FESSION A L E N GINEERREG I S T ER E DIND I A N A PE11900318 STATE OF NO.REVISIONS AND ISSUESPart of the NW/4 of Section 26, Township 18 North, Range 3 East, Clay Township, Hamilton County, IndianaW19.0175PREPARED FOR:13285 ILLINOIS ST. CARMEL, IN 46032PROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:RLWDESIGNED BY:DWG NAME:PROJECT NO.:W19.0175DATEBY11.13.2019SSRDATE:RLWKnow what's below. before you dig.Call R SAAMRAJYA, LLCPLANS SUBMITTED FOR REVIEW05.15.2019RLWW S N E ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMRUSSELL L. WEBSTER II, PE No. 11900318 PLAN CERTIFICATE NOTE: ORIGINAL ALTA, TOPOGRAPHY, UTILITIES, STORM SEWERS, AND ALL OTHER EXISTING CONDITIONS ITEMS WERE PREPARED BY SCHNEIDER CORP. WEIHE ENGINEERS, INC. AND RUSSELL L. WEBSTER II ACCEPT RESPONSIBILITY ONLY FOR THE SITE IMPROVEMENTS RELATED TO THE LIMITED ENGINEERING SCOPE SHOWN ON THESE PLANS.PLANS REVISED FOR TAC COMMENTS05.15.2019RLWPLANS REVISED FOR TAC COMMENTS11.13.2019RLWAPPROVAL PENDINGNOT F OR C O NSTR UCTI O N ELECTRICAL RISER GUY ANCHOR ELECTRIC JUNCTION BOX ORNAMENTAL LIGHT GENERATOR STREET LIGHT ELECTRIC MANHOLE ELECTRIC OUTLET UTILITY POLE UTILITY POLE W/ TRANSFORMER TRANSFORMER COMMUNICATIONS JUNCTION BOX COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL RIGHT OF WAY LINE FENCE GUARD RAIL BUILDING SETBACK LINE BOUNDARY LINE FIRE DEPT HOOKUP FIRE HYDRANT POST INDICATOR VALVE WATER METER WATER VALVE GAS METER GAS VALVE ELECTRIC METER LIQUID PROPANE GAS TANK MONITORING WELL TRAFFIC SIGNAL POLE TRAFFIC SIGNAL BOLLARD PARKING METER POST SIGN PARKING WHEEL STOP DOWN SPOUT ACCESSIBLE SPACE GATE POST COMMUNICATIONS RISER STORM CLEANOUT BEEHIVE INLET CURB INLET FLOOR DRAIN ROUND INLET SQUARE INLET STORM MANHOLE SANITARY SEWER CLEANOUT LIFT STATION SANITARY SEWER MANHOLE SANITARY STUB MARKER PARKING LOT LIGHT (1 HEAD) PARKING LOT LIGHT (3 HEAD) PARKING LOT LIGHT (4 HEAD) PARKING LOT LIGHT (2 HEAD)CONCRETE PAVEMENT ROW RIGHT OF WAY BSL BUILDING SETBACK LINE ESMT EASEMENT D.&U.E.DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION 12 PARKING COUNT STANDARD DUTY ASPHALT STONE PAVEMENT SITE PLAN LEGEND UTILITIES ABBREVIATIONS OTHER LINE TYPES SECTION LINE P1 P1 P1 P1 P1 P1 P1 P1 P1 P2 H10 S6