Loading...
HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Addressing Dave McCoy 6/27/23 8:33 AM Comment For addressing purposes, 5 streets within this development will need to be named. Please contact me to discuss the process for naming streets. Info Only 2 1 CrossRoad Engineers Willie Hall 6/27/23 9:51 AM Comment REVIEW PENDING - please submit all information required by Sec. 102.07 of the City of Carmel Stormwater Technical Standards Manual so we can complete our review. Resolved 3 1 Engineering Alex Jordan 6/27/23 10:38 AM Comment This appears to be an incomplete submittal as only the 200 series of the civil plans were upload. Additionally, there was no drainage report or O&M manual provided. Please provide a full submittal with the new review cycle in order for our review to begin. Info Only 4 1 Urban Forestry Daren Mindham 6/29/23 2:01 PM Changemark Alternate I don't see the use of this schedule, please explain. L510 The Edge Landscape Details- L500.pdf Responded by: Ben Bemis - 10/6/23 4:36 PM Please see the revised plans sheets. ---------------------------------------------------------- Responded by: Rick Lawrence - 8/11/23 10:33 AM Added labels to call out alternate bid areas Resolved 5 1 Urban Forestry Daren Mindham 6/29/23 2:03 PM Changemark landscape bed Please add a landscape bed to screen the utilities and to provide landscaping on both sides of the entrance. L200 The Edge Building Base Landscape Plan-L205.pdf Responded by: Ben Bemis - 10/6/23 4:36 PM So noted. Please see the revised plans sheets. ---------------------------------------------------------- Responded by: Rick Lawrence - 8/11/23 10:33 AM Provided more landscape bed to screen the utilities and both sides of the entrance Resolved 6 1 Urban Forestry Daren Mindham 6/29/23 2:07 PM Changemark remove tree Please remove this tree is too close to the intersection and has a shortened soil volume area. L100 The Edge Landscape Plan- L103.pdf Responded by: Ben Bemis - 10/6/23 4:37 PM So noted. Please see the revised plans sheets. ---------------------------------------------------------- Responded by: Rick Lawrence - 8/11/23 10:33 AM Relocated the tree Resolved REVIEW COMMENTS Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 7 1 Urban Forestry Daren Mindham 6/29/23 2:07 PM Changemark trees with arrows Please move these trees a bit further from the intersection to increase vision clearance views. L100 The Edge Landscape Plan- L103.pdf Responded by: Ben Bemis - 10/6/23 4:37 PM So noted. Please see the revised plans sheets. ---------------------------------------------------------- Responded by: Rick Lawrence - 8/11/23 10:33 AM Relocated these two trees Resolved 8 1 Urban Forestry Daren Mindham 6/29/23 2:19 PM Changemark tree changes Please add two oak trees along the sidewalk path and move or remove the zelkova away from this bend so not to affect vision clearance traffic. This bend seems like it could be hard to maneuver with moving trucks and traffic. L100 The Edge Landscape Plan- L101.pdf Responded by: Ben Bemis - 10/6/23 4:37 PM So noted. Please see the revised plans sheets. ---------------------------------------------------------- Responded by: Rick Lawrence - 8/11/23 10:33 AM Added two oak trees Resolved 9 1 Urban Forestry Daren Mindham 6/29/23 2:19 PM Changemark move label Please move label so that the arrow at the intended tree location. L100 The Edge Landscape Plan- L101.pdf Responded by: Ben Bemis - 10/6/23 4:37 PM So noted. Please see the revised plans sheets. ---------------------------------------------------------- Responded by: Rick Lawrence - 8/11/23 10:34 AM Moved label to correct location Resolved 10 1 Urban Forestry Daren Mindham 6/29/23 2:19 PM Changemark reforestation instead of landscape buffer on eastern perimeter I would like to recommend instead of a landscape buffer, that this perimeter be landscaped with shade trees to be converted into a woodlands. This would entail planting 2" caliper native shade trees every 10' in a honeycomb shape and making notations that this area would be a naturalized 'no mow' area. L100 The Edge Landscape Plan- L101.pdf Responded by: Ben Bemis - 10/6/23 4:37 PM So noted. Please see the revised plans sheets. ---------------------------------------------------------- Responded by: Rick Lawrence - 8/11/23 10:34 AM Provided 25 more shade trees in place of the evergreen trees and shrubs Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 11 1 Urban Forestry Daren Mindham 6/29/23 2:24 PM Changemark Bufferyard widths Please add notes about each areas bufferyard width. For instance, the eastern perimeter is a 25' wide bufferyard as its a 'C' level rear buffer. Please include the Mich Rd 30' greenbelt width. The north buffer from west to east is 5', 10', 15' The south buffer from west to east is 5', 10', 5' L100 The Edge Landscape Plan- L100.pdf Responded by: Ben Bemis - 2/28/24 1:08 PM This has been updated, please see the revised ordinance chart on L100. ---------------------------------------------------------- Reviewer Response: Daren Mindham - 10/12/23 10:55 AM I don't see these added to the ordinance chart. I assume it would be shown right after the 'Type' notation. ---------------------------------------------------------- Reviewer Response: Daren Mindham - 10/12/23 10:55 AM I don't see these added to the ordinance chart. I assume it would be shown right after the Type ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 4:37 PM So noted. Please see the revised plans sheets. ---------------------------------------------------------- Responded by: Rick Lawrence - 8/11/23 10:34 AM Dimensions have been added to the ordinance chart Resolved 12 1 Fire Carmel Fire 7/3/23 8:12 AM Comment The Fire hydrant layout and numbers are not sufficient for the amount and size of buildings proposed. The current fire hydrant plan as proposed is not approved by CFD. The design engineer needs to contact Capt. Chris Ellison at 317-571-2600 to discuss an approved fire hydrant layout and utility plan. Responded by: Ben Bemis - 10/6/23 9:28 AM More fire hydrants have been added to the plans, see C500 series. We will follow up and coordinate with CFD. Info Only 13 1 Fire Carmel Fire 7/3/23 8:31 AM Comment Section 3312.1 Fire Hydrants shall be fully functional tested and approved prior to any combustible materials arriving on the construction site. Responded by: Ben Bemis - 10/6/23 9:29 AM More fire hydrants have been added to the plans, see C500 series. We will follow up and coordinate with CFD. Info Only 14 1 Fire Carmel Fire 7/3/23 8:32 AM Comment Section 3310.1 Required Fire Department Vehicle Access. Approved Asphalt fire apparatus access roads shall be provided to and through the construction site during construction. Fire Apparatus access road must be capable of supporting the weight of fire apparatus and maintained clear at all times. Responded by: Ben Bemis - 10/6/23 9:29 AM A note has been added to the Utility Plan for the contractor to provide this prior to building construction. Please see sheet C500. Info Only Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 15 1 Sign Permits Aliza Shalit 7/12/23 8:53 AM Comment Will there be any proposed signage for this development? Anything planned for the entrance? If so, please upload for review. Reviewer Response: Aliza Shalit - 10/17/23 9:52 AM An ADLS Amend will be required for an entrance sign when this comes through. ---------------------------------------------------------- Responded by: Rick Lawrence - 8/8/23 8:14 PM Signage for the multi-family has not yet been determined. Once finalized, the appropriate permit will be requested. Info Only 16 1 Sign Permits Aliza Shalit 7/12/23 8:54 AM Comment All exterior signage requires a separate sign permit application and review process. Applications are submitted through the City of Carmel online permitting portal. Info Only 17 1 Sign Permits Aliza Shalit 7/12/23 8:55 AM Changemark Window Signs Maximum allowable window sign area is 3sf. Please make sure etched door signage complies with this requirement. 23-05-26 REI - Edge Exterior Elevations.pdf Info Only 18 1 Vectren Energy Chad Miller 7/12/23 10:22 AM Changemark CenterPoint Energy Will the proposed buildings or anything on this site need gas service? We will need load information if they do want gas and also an AutoCAD file. C500 OVERALL UTILITY PLAN.pdf Info Only 19 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please provide a legal description of site on the cover sheet Responded by: Ben Bemis - 10/6/23 9:23 AM This has been added to the Title Sheet. Resolved 20 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please provide the sites total disturbance on the cover sheet Responded by: Ben Bemis - 2/22/24 6:18 PM This has been added to the Title Sheet in the Site Data table. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/23/23 2:56 PM We are unable to locate this on the cover sheet. Please revise. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:23 AM This has been added to the Title Sheet. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 21 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please submit a storm water management permit application Responded by: Ben Bemis - 10/6/23 9:24 AM This will be submitted. Resolved 22 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please provide all technical information required by Section 102.02(xi)(m) of the Storm Water Technical Standards Responded by: Ben Bemis - 2/22/24 6:54 PM The Drainage Summary has been added to the Grading Plan. Please see sheet C300. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/20/23 2:05 PM We are unable to locate the drainage summary required by this section. Please include on the grading plans. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:24 AM Comment noted. Resolved 23 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please provide the anticipated start construction date in a comment letter or project summary Responded by: Ben Bemis - 10/6/23 9:24 AM This has been added to the Title Sheet. Resolved 24 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please provide the City's paving policy in the set Responded by: Ben Bemis - 10/6/23 9:24 AM This has been added to the detail sheets. Resolved 25 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please provide the City's curbing policy in the set Responded by: Ben Bemis - 10/6/23 9:24 AM This has been added to the detail sheets. Resolved 26 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please verify that there are no direct discharge areas Responded by: Ben Bemis - 10/6/23 9:24 AM These have been included in the Drainage Map. Resolved 27 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please clearly show the construction limits on all sheets with plan view (not required on profile sheets) Responded by: Ben Bemis - 10/6/23 9:24 AM Construction limits have been added to all plan sheets. Resolved 28 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please verify that all elevations are North American Vertical Datum of 1988 (NAVD) Responded by: Ben Bemis - 10/6/23 9:25 AM Updated on Cover Sheet Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 29 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please verify that the horizontal datum of topgraphic map is Indiana State Plane Coordinates, NAD83 Responded by: Ben Bemis - 10/6/23 9:25 AM Updated on Cover Sheet. Resolved 30 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please verify that all existing culverts, pipes, and bridges on existing drives or under the roadway are shown indicating size, type, and invert elevations Responded by: Ben Bemis - 10/6/23 9:25 AM This information is shown on the grading and drainage plan sheets. Resolved 31 1 Engineering Alex Jordan 7/13/23 9:51 AM Library Comment Please verify that the locations of all existing electrical power vaults, transformers, power lines, gas lines, television cable , and telephone lines are shown Responded by: Ben Bemis - 10/6/23 9:25 AM Existing utilities are shown on grading and drainage plan sheets. Resolved 32 1 Engineering Alex Jordan 7/17/23 2:08 PM Library Comment Please label the rights-of-way of all existing and proposed interior and exterior streets. Pleas also provide road profiles for all public roads in the development. Responded by: Ben Bemis - 10/6/23 9:25 AM The roads have been labeled as Private. ROW and easement limits are included on the plans. Resolved 33 1 Engineering Alex Jordan 7/17/23 2:08 PM Library Comment Please label the widths of all internal drives, drive aisles, alleys, and streets Responded by: Ben Bemis - 10/6/23 9:25 AM These dimensions have been added to the layout sheets Resolved 34 1 Engineering Alex Jordan 7/17/23 2:08 PM Library Comment Please label private streets are labeled as such Responded by: Ben Bemis - 2/22/24 6:55 PM These labels can be found on sheets C201-C206. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/20/23 1:31 PM We are unable to locate these call outs on the 200 series. Please revise. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:26 AM These labels have been added to the layout sheets Resolved 35 1 Engineering Alex Jordan 7/17/23 2:08 PM Library Comment Please show subsurface drains under the curb of all streets Responded by: Ben Bemis - 10/6/23 9:26 AM Subsurface drainage have been added to the drainage plans. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 36 1 Engineering Alex Jordan 7/17/23 2:08 PM Library Comment Please indicate all existing and proposed utilities on the profiles with the size, pipe material, and inverts Responded by: Ben Bemis - 10/6/23 9:26 AM This information has been added to the profile sheets. Resolved 37 1 Engineering Alex Jordan 7/17/23 2:08 PM Library Comment Please provide the hydraulic grade line on the profiles Responded by: Ben Bemis - 10/6/23 9:26 AM This information has been added to the profile sheets. Resolved 38 1 Engineering Alex Jordan 7/17/23 2:08 PM Library Comment Please show the SSD connections to structures on the profiles Responded by: Ben Bemis - 10/6/23 9:26 AM This information has been added to the profile sheets. Resolved 39 1 Engineering Alex Jordan 7/17/23 2:09 PM Library Comment Please provide the design speed on the cover sheet Responded by: Ben Bemis - 10/6/23 9:26 AM The drives are intended to be private drives. Resolved 40 1 CrossRoad Engineers Willie Hall 7/18/23 1:26 PM Changemark 102.02.v.f The Existing Project Site Layout shall include the location of storm, sanitary, combined sewer, and septic tank systems and outfalls with all top of casting elevation, invert elevations, pipe sizes, and pipe material indicated. Existing structure and pipe information shall be as-built information and not design information. C100 EXISTING CONDITIONS.pdf Responded by: Ben Bemis - 10/6/23 9:06 AM All known information has been included on the C 100 plan sheet. Resolved 41 1 CrossRoad Engineers Willie Hall 7/18/23 1:33 PM Changemark 102.02.vii the Plan and Profile Sheet(s) shall include the limits of granular backfill may be indicated on the plan and profile sheets; however, any references with general notes, plan notes, or legends to the granular backfill material shall reference the appropriate trench detail on the detail sheets. C409 STORM PROFILES.pdf Responded by: Ben Bemis - 10/6/23 9:08 AM This has been added to the profile sheets. Resolved 42 1 CrossRoad Engineers Willie Hall 7/18/23 1:33 PM Changemark 102.02.vii the Plan and Profile Sheet(s) shall include the hydraulic grade line indicated on the profiles to demonstrate that the hydraulic grade line remains below the rim elevation for the design condition. C409 STORM PROFILES.pdf Responded by: Ben Bemis - 10/6/23 9:08 AM This has been added to the profile sheets. Resolved 43 1 CrossRoad Engineers Willie Hall 7/18/23 1:37 PM Changemark Inverts Invert into Str 325 from Str 333 is lower the in outlet invert. C412 STORM PROFILES.pdf Responded by: Ben Bemis - 10/6/23 9:07 AM This has been corrected. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 44 1 CrossRoad Engineers Willie Hall 7/18/23 1:38 PM Changemark 501.01 there should be no less than 2.5 feet of cover along any part of the pipe from final pavement elevation or final ground surface elevation to the top of the pipe. C410 STORM PROFILES.pdf Reviewer Response: Willie Hall - 10/11/23 4:05 PM ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:08 AM 2.5 feet of cover has been provided where possible. Resolved 45 1 CrossRoad Engineers Willie Hall 7/18/23 1:49 PM Changemark 102.02.xi.a the grading and drainage plan shall include existing drainage facilities, including size, material, invert elevations and top casting information. Existing structure and pipe information shall be as-built information and not design information. C301 GRADING PLAN - AREA A.pdf Responded by: Ben Bemis - 10/6/23 9:09 AM This information has been added to the grading plans. Resolved 46 1 CrossRoad Engineers Willie Hall 7/18/23 1:49 PM Changemark 102.02.xi.d the grading and drainage plan shall include the delineation of all proposed land disturbing activities, including off-site activities that will provide services to the project site. C301 GRADING PLAN - AREA A.pdf Responded by: Ben Bemis - 10/6/23 9:09 AM This information has been added to the grading plans. Resolved 47 1 CrossRoad Engineers Willie Hall 7/18/23 1:50 PM Changemark 102.02.xi.n the grading and drainage plan shall provide details of the storm system showing connection to the main system or method of discharge into stream or reservoir, distance to stream outlet, locations and sizes of lift stations, manholes, inlets, junction boxes, and other necessary appurtenances. C405 STORMWATER PLAN - AREA D.pdf Reviewer Response: Willie Hall - 4/15/24 10:32 AM Resolved with the understanding that the video will be provided to the Engineering Department. ---------------------------------------------------------- Responded by: Ben Bemis - 4/12/24 8:57 AM Everything was found to be in working order and it was confirmed that the storm sewer does not blind-tee into the INDOT storm sewer in Michigan Road. It continues under the roadway and connects to an existing structure west of Michigan Road. Since runoff from the site will be reduced in the proposed condition and the existing system is in good working order we believe the existing downstream system will not be adversely affected. ---------------------------------------------------------- Responded by: Ben Bemis - 3/23/24 11:13 AM The storm line will be televised on 3/27 and the connection will be documented. This will be provided to Carmel Engineering as soon as the information is available. ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/15/24 2:13 PM Please show the accurate condition on the plans. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM Engineering would also like to see photographic evidence of the connection as well as a video of the existing pipe to verify the condition of the pipe. ---------------------------------------------------------- Responded by: Ben Bemis - 2/22/24 6:56 PM After further investigation it appears that the 15" RCP ties into the storm structure on the west curb line of US 421. The proposed system is tying into the storm sewer upstream of the existing beehive structure east of US 421. No work is proposed to be performed within the ROW. ---------------------------------------------------------- Reviewer Response: Willie Hall - 10/11/23 4:31 PM This comment was in reference to providing details on how the storm sewer connects to the mainline within Michigan Rd. C100 indicates the assumption that the existing pipe blind tees to the mainline. This will not be acceptable and will require a new manhole be installed in lieu of a blind tee connection. Please also provide the INDOT drainage permit. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:10 AM Existing utilities are shown on grading and drainage plan sheets. Profiles show the point of connection at the existing storm pipe invert. 48 1 CrossRoad Engineers Willie Hall 7/18/23 2:20 PM Comment Drainage Report C-1 & C-2 exhibits 102.03.i. The overall drainage maps should include the fully developed ROW across the site frontage unless otherwise directed by Engineering. Responded by: Ben Bemis - 10/6/23 9:10 AM The frontage of the ROW is controlled by INDOT. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 49 1 Engineering Alex Jordan 7/18/23 2:21 PM Changemark Please review and revise the building elevations We require that the MLAG/MFPG for the buildings be set 1' above the adjacent flooding, which for most of the buildings will be the 100-year clogged event. Please review these elevations and revise them to meet this requirement. Please also revise any FFE's of building that will be effected by this, if necessary. C408 FLOOD ROUTING PLAN.pdf Responded by: Ben Bemis - 3/23/24 10:14 AM A waiver has been submitted for this requirement. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 3/13/24 11:17 AM The MLAG/MFPGs are still listed above the FFE elevations on most of the proposed buildings. These will need to be addressed with the next submittal. ---------------------------------------------------------- Responded by: Ben Bemis - 2/22/24 6:56 PM The grading has been revised to provide at least 6" above the MLAG. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/20/23 2:04 PM Thank you for raising the MLAG/MFPGs per this comment. However, the FFEs were not revised as requested and are now below the MLAG/MFPGs. Per 104.02 of the STSM, the FFE's must be at least 6" above the lowest adjacent grade. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:26 AM So noted. Please see the revised plans sheets. Resolved 50 1 CrossRoad Engineers Willie Hall 7/18/23 2:24 PM Comment Drainage Report 102.03.i.b.iv Please include time of concentration calculations. Responded by: Ben Bemis - 10/6/23 9:11 AM Time of concentration calculation has been detailed and included within HydroCAD report. Basins maps has also been updated to show Tc flow path. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 51 1 CrossRoad Engineers Willie Hall 7/18/23 2:51 PM Comment Drainage Report Table 1 Please breakout discharge rates (direct discharge, pond, swale). Please also include required detention, provided detention and acreage to tributary to each detention facility. The acreage should be equal to the overall site acreage. Reviewer Response: Willie Hall - 3/27/24 11:20 AM Resolved with the understanding the the City Engineer verbally approved the waiver. ---------------------------------------------------------- Responded by: Ben Bemis - 3/23/24 9:36 AM A waiver has been submitted for this requirement. ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/15/24 2:22 PM Pending revisions per Ref.# 59, this comment will remain unresolved. ---------------------------------------------------------- Responded by: Ben Bemis - 2/22/24 6:56 PM The grading has been revised to provide at least 6" above the MLAG. ---------------------------------------------------------- Reviewer Response: Willie Hall - 10/16/23 5:09 PM This comment will remain unresolved until revised existing discharge rates are provided. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:11 AM This has been added to the table in the drainage report. Resolved 52 1 CrossRoad Engineers Willie Hall 7/18/23 2:52 PM Comment Site Acreage Discrepancy GIS states the deeded acreage is 22.72, title page shows 22.149 with .983 dedicated r/w and the drainage report 21.32. Please verify which is correct. Responded by: Ben Bemis - 10/6/23 9:11 AM Drainage report updated to 22.149 ac. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 53 1 Engineering Alex Jordan 7/18/23 3:01 PM Changemark Where will this be installed? C800 SITE DETAILS.pdf Responded by: Ben Bemis - 2/22/24 6:57 PM Detail 205 on Sheet C800 has been removed. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/20/23 2:11 PM Please have this detail removed to avoid confusion. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:27 AM This type of commercial driveway is not planned for this project. Resolved 54 1 CrossRoad Engineers Willie Hall 7/18/23 3:21 PM Changemark 104.02 All swales shall be installed with a subsurface drain. Please show the curb underdrain required per Carmel Standards. C400 OVERALL STORMWATER PLAN.pdf Responded by: Ben Bemis - 10/6/23 9:11 AM A swale underdrain has been added to the drainage plans. Resolved 55 1 Engineering Alex Jordan 7/18/23 3:22 PM Changemark Please provide the native planting list for the banks and shelf on the civil plans C900 STORMWATER POLLUTION PREVENTION PLAN.pdf Responded by: Ben Bemis - 10/6/23 9:27 AM List added on C903. Resolved 56 1 Engineering Alex Jordan 7/18/23 3:22 PM Changemark Please provide a hatching for the native vegetation C900 STORMWATER POLLUTION PREVENTION PLAN.pdf Responded by: Ben Bemis - 2/22/24 7:47 PM The hatched area has been clarified on the SWPP Plan. See sheet C900. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/23/23 2:58 PM Thank you for adding the legend item for this but it does not appear that the hatching is shown on the plan sheet or if is covered by the slope blanket hatching. Please revise to make it clear where the plantings will go. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:27 AM Native vegetation area updated on C900. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 57 1 Engineering Alex Jordan 7/18/23 3:22 PM Changemark Are these the locations of the native protection signage? Please provide a legend item for this C900 STORMWATER POLLUTION PREVENTION PLAN.pdf Responded by: Ben Bemis - 2/23/24 7:38 PM Callouts for the signage have been added to the SWPP Plans. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/23/23 2:59 PM It appears that these signs were added but they are not called out on the plans and a legend item is not provided. Please revise. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:27 AM This has been added to sheet C900. Resolved 58 1 Engineering Alex Jordan 7/18/23 3:22 PM Changemark Please place erosion control blanket within the swale flowlines C900 STORMWATER POLLUTION PREVENTION PLAN.pdf Responded by: Ben Bemis - 10/6/23 9:27 AM An erosion control blanket has been added to the swale. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 59 1 CrossRoad Engineers Willie Hall 7/18/23 3:26 PM Comment Drainage Report 302.03 The existing conditions shall be modeled as two interconnected ponds as the existing pipe conditions, not as a single pond. Post developed release rate for sites with depressional storage shall be the 2-year pre-developed peak runoff rate for the post-developed 10-year storm and 10-year pre-developed peak runoff rate for the post developed 100-year storm. In no case shall the calculated site-specific release rates be larger than general release rates per this section. Reviewer Response: Willie Hall - 3/27/24 11:20 AM Resolved with the understanding the the City Engineer verbally approved the waiver. ---------------------------------------------------------- Responded by: Ben Bemis - 3/23/24 9:36 AM A waiver has been submitted for this requirement. ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/15/24 2:20 PM Per the revised existing conditions, the existing site outlet discharge rate is 1.98 cfs and 3.82 cfs for the 2- and 10-yr storm events. 1.98 cfs and 3.82 cfs shall be the 10- and 100-yr post developed release rates to which this site will be held. Please make revisions accordingly. ---------------------------------------------------------- Responded by: Ben Bemis - 2/22/24 6:58 PM The Existing HydroCAD calculations have been updated to show the two separate drainage areas. ---------------------------------------------------------- Reviewer Response: Willie Hall - 10/16/23 5:05 PM Please revise the existing model to account for the existing drainage basins to each pond. The city will also require that the post development release rates be the equal to or less than existing release rates or 0.1/0.3 cfs/acre, whichever is lesser. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:12 AM Existing HydroCAD model has been updated to show two interconnected ponds. This site does not have depressional storage. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 60 1 CrossRoad Engineers Willie Hall 7/18/23 3:46 PM Comment Drainage Report 302.06.01 Please confirm that detention facilities are designed in such a manner that a minimum 90% of the original detention capacity is restored within 48 hours from the start of the design 100-year storm by providing stage/storage vs time tables. Reviewer Response: Willie Hall - 3/27/24 11:20 AM Resolved with the understanding the the City Engineer verbally approved the waiver. ---------------------------------------------------------- Responded by: Ben Bemis - 3/23/24 9:36 AM A waiver has been submitted for this requirement. ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/15/24 2:21 PM This comment will remain unresolved until the waiver is approved at BPW. ---------------------------------------------------------- Responded by: Ben Bemis - 2/28/24 12:43 PM Waiver request was uploaded to the correspondence older in ProjectDox. ---------------------------------------------------------- Reviewer Response: Willie Hall - 10/11/23 5:21 PM This comment will remain unresolved until the waiver request is provided. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:12 AM To maintain the allowable release rates for the extended detention basin the control orifice needs to be 2". This orifice size does not allow for the storage to be restored to 90% capacity after 48 hrs. A variance will be requested for this requirement. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 61 1 CrossRoad Engineers Willie Hall 7/18/23 3:55 PM Comment Drainage Report 302.11 Please provide emergency overflow calculations for the emergency spillways to verify they are adequately sized to pass the 1.25x100YR peak inflow. Responded by: Ben Bemis - 4/12/24 8:58 AM Per Caleb Warner, BPW approved the waiver at their April meeting. ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/27/24 11:21 AM Resolved with the understanding the the City Engineer verbally approved the waiver. ---------------------------------------------------------- Responded by: Ben Bemis - 3/23/24 9:37 AM A waiver has been submitted for comment 59 requirement. ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/15/24 2:22 PM Pending revisions per Ref.# 59, this comment will remain unresolved. ---------------------------------------------------------- Responded by: Ben Bemis - 2/22/24 6:59 PM Emergency overflow weir calculations for the pond and the detention swale can be found in Appendix G. ---------------------------------------------------------- Reviewer Response: Willie Hall - 10/16/23 5:08 PM Emergency Overflow calculations do not appear to be included in drainage report. Appendix G appears to be mislabeled in the TOC. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:12 AM Emergency overflow calculations has been provided through HydroCAD. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 62 1 CrossRoad Engineers Willie Hall 7/18/23 4:10 PM Comment Drainage Report 303 Please provide calculations confirming that the onsite drainage swale meet the section 303 requirements. Responded by: Ben Bemis - 2/22/24 7:00 PM These areas are not designed as swales but as inlet basin areas. The inlet basins are adequately sized to convey stormwater per the stormwater manual. ---------------------------------------------------------- Reviewer Response: Willie Hall - 10/11/23 5:25 PM There are 'rear yard' swales along the southern, eastern and northern edges of the property. Please provide capacity calculations for these. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:12 AM The drainage swale within this site is not a conveyance measure is instead act as a detention storage measure. Resolved 63 1 CrossRoad Engineers Willie Hall 7/18/23 4:28 PM Comment Drainage Report 305.02 & 305.05 All storm sewers, inlets, catch basins, and street gutters shall accommodate, subject to the allowable spread provisions, as a minimum, peak runoff from a 10-year return frequency storm calculated based on methodology described in Section 201.02. Most of the sag inlets in the in the proposed roadway exceed the allowable spread. Please revise. Responded by: Ben Bemis - 2/22/24 7:00 PM The plans have been revised and the calculations have been updated to show at least 10' of available drive lane width. ---------------------------------------------------------- Reviewer Response: Willie Hall - 10/11/23 5:36 PM Based on the ponding depth of most of the road inlets, a 10' lane will not be provided in a 10 year event. For example, the spread for 220 would be 8' and 221 would be 12', leaving only 8' of travel lane vs the required 10'. In some cases it appears that the ponding would overtop the crown of the road as well which will not be acceptable. Please revise. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:16 AM Gutter spread calculations have been added to the report Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 64 1 CrossRoad Engineers Willie Hall 7/18/23 4:34 PM Comment Drainage Report C3.3 Exhibit Please clarify how the "Greenspace" in the southwest corner of the site will be routed to the detention. It is not labeled as a future development area and there is no inlet connecting the low point to the site infrastructure. Responded by: Ben Bemis - 3/24/24 12:36 PM The Greenspace at the southwest corner has been reconciled with the landscape plans. Berms are now included to screen the dog park however the revised swale and drainage pattern remain in place per the recent submittal. Please see revised grading sheet C301. ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/15/24 2:33 PM It appears that there are contours included in the landscape plan that contradict the proposed grading sheet. Please clarify. ---------------------------------------------------------- Responded by: Ben Bemis - 2/28/24 12:45 PM The greenspace or dog park at the southwest corner of the site has been re-graded to capture a portion of the water and route it to the detention. The remainder will direct discharge to the ROW. Updated plans and calculations have been provided. ---------------------------------------------------------- Reviewer Response: Willie Hall - 10/11/23 5:44 PM This comment was in reference to the green space in the southwest corner of the site, just south of the entrance drive. This has now been labeled as future development with a stub for future connection but is still hatched as proposed pervious area, please confirm there are planned future improvements that will eventually be routed to the pond and not to the existing beehive in the R/W. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:17 AM This area is planned to be completely planted with native vegetation. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 65 1 CrossRoad Engineers Willie Hall 7/18/23 4:36 PM Comment Future outlot drainage The lowest point of the outlots is lower than the stubout inverts. Please confirm that there are no concerns regarding routing future drainage to the to the detention facility. Responded by: Ben Bemis - 4/12/24 8:59 AM The future outlots have been regraded to minimize direct disharge until the lots can be fully developed. ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/27/24 11:10 AM Engineering will require that Lot 1 be graded towards the stubout manholes to minimize direct discharge in the interim condition. ---------------------------------------------------------- Responded by: Ben Bemis - 3/23/24 9:37 AM Structures have been added to the stub-outs. ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/15/24 2:07 PM Per conversation with Engineering, these stubs will need to have a structure at each end in the for of an end section or an inlet and take in drainage in the interim condition vs the future outlet direct discharging to the right of way. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:17 AM Due to site constraints, the storm sewer stubs are as low as reasonably possible. The proposed storm sewer system is sized to convey the future outlot developments. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 66 1 CrossRoad Engineers Willie Hall 7/18/23 4:42 PM Comment Drainage Report Mechanical Units The 10-yr online flow rates exceed the allowable for the selected units. Please upsize water quality units or move them offline. Responded by: Ben Bemis - 3/23/24 9:56 AM The calculations and details have been updated to show the correct inverts. Please see Appendix I and sheet C805 ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/15/24 2:45 PM The calculated depths in Appendix I do not match inverts on details and structure data table. Please revise ---------------------------------------------------------- Responded by: Ben Bemis - 2/22/24 7:05 PM The diversion details can be found on sheet C805. ---------------------------------------------------------- Reviewer Response: Willie Hall - 10/12/23 8:24 AM Please provide diversion structure details in the plans and diversion weir calculations in the drainage report. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:18 AM The drainage plans have been revised to bypass online flow. Resolved 67 1 CrossRoad Engineers Willie Hall 7/18/23 4:56 PM Comment Drainage Report Detention Pond BMPs Please provide calculations showing that the water quality volume is detained for at least 12 hours but no longer than 48 hours. Please confirm that the permanent pool volume is 3 times the WQv. Responded by: Ben Bemis - 2/23/24 7:26 PM Per the Hydrograph table in Appendix F the WQv is released after 14 hrs. ---------------------------------------------------------- Reviewer Response: Willie Hall - 10/12/23 8:27 AM Please provide a hydrocad output that shows that the WQv is released in no less than 12 hours. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:18 AM WQ calculations have been added to the drainage report to show the normal pool volume is at least 3x the required amount. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 68 1 CrossRoad Engineers Willie Hall 7/18/23 5:09 PM Changemark 102.02.vii Please include utility crossings on the storm plan and profiles. C409 STORM PROFILES.pdf Responded by: Ben Bemis - 10/6/23 9:20 AM Utility crossings have been added to the profiles. Resolved 69 1 Engineering Alex Jordan 7/19/23 8:58 AM Changemark Please include the native vegetation in this section 311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/22/24 7:05 PM This section has been updated to include information about the native vegetation. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/23/23 3:01 PM The wet pond section on this sheet still does not reference the proposed native vegetation on the banks or shelf. Please revise. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:27 AM This has been added to the O+M manual. Resolved 70 1 Engineering Alex Jordan 7/19/23 8:58 AM Changemark Please provide an item for the native vegetation in this checklist 311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/22/24 7:06 PM The checklists have been updated to include information about the native vegetation. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/23/23 3:02 PM It does not appear that a native vegetation checklist item was added for the pond or swale. Please revise. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:27 AM This has been added to the O+M manual. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 71 1 Engineering Alex Jordan 7/19/23 8:58 AM Changemark If this will be a BMP, it will need to be placed in a BMP easement 311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/23/24 6:56 PM The vegetated swale is now included in an easement. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/23/23 3:03 PM The limits of the BMP easement do not contain the vegetated swale. Please revise. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:27 AM This has been added to the O+M manual. Resolved 72 1 Engineering Alex Jordan 7/19/23 8:58 AM Changemark Please revise this call out to be for the native vegetation Please also provide a hatching for this vegetation 311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/23/24 6:56 PM The native planting vegetation has been added to the BMP map. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/23/23 3:05 PM This was not included, please revise. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:27 AM This has been added to the O+M manual. Resolved 73 1 Engineering Alex Jordan 7/19/23 8:58 AM Changemark Are aerator proposed in the pond? If so, please provide details in the O&M and plans and list in the SWPPP narrative. 311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/28/24 12:51 PM Aerator cut sheets were added to sheet C814 and the O&M manual. It was also called out in the SWPPP narrative. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/23/23 3:05 PM These need to be called out and details need to be provided in the O&M. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:28 AM Aerators are planned. Notes and details have been added to the SWPPP sheets. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 74 1 Engineering Alex Jordan 7/19/23 8:58 AM Changemark Please label the protective signage on this 311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/23/24 6:58 PM Protective signage labels have been added to the BMP map. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/23/23 3:05 PM This was not included, please revise. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:28 AM This has been added to the O+M manual. Resolved 75 1 Engineering Alex Jordan 7/19/23 9:01 AM Changemark Please show the native vegetation limits and protective signage on the cross- section 311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/23/24 7:10 PM The vegetation limits and signage has been added to the detail. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/23/23 3:09 PM This was not included, please revise. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:28 AM This has been added to the O+M manual. Resolved 76 1 Engineering Alex Jordan 7/19/23 9:02 AM Changemark Please provide a detail for the protective signage 311-804-O&M Manual.pdf Responded by: Ben Bemis - 10/6/23 9:28 AM This has been added to the O+M manual. Resolved 77 1 Engineering Alex Jordan 7/19/23 9:04 AM Changemark Please list the native vegetation in this section 311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/22/24 7:12 PM This section has been updated to include information about the native vegetation. ---------------------------------------------------------- Reviewer Response: Alex Jordan - 10/23/23 3:09 PM This was not included, please revise. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:28 AM This has been added to the O+M manual. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 78 1 TriCo Regional Sewer Utility Ryan Hartman 7/19/23 11:52 AM Comment TriCo performed our review and sent comments to CEC on 7/19 Responded by: Ben Bemis - 2/28/24 1:19 PM TriCo Comments have been addressed and returned to TriCo. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 4:38 PM Comments have been addressed. Please see updated plan sheets. Resolved 79 1 CrossRoad Engineers Willie Hall 7/20/23 9:36 AM Changemark 303.07 Please revise grading so that the garages are not flooded during the clogged scenario. C408 FLOOD ROUTING PLAN.pdf Responded by: Ben Bemis - 4/12/24 9:01 AM The grading has been revised and the flood routing plan has been updated. ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/27/24 11:10 AM This comment to remain unresolved until flood routing is accurate per Ref.# 133. ---------------------------------------------------------- Responded by: Ben Bemis - 3/23/24 10:14 AM A waiver has been submitted for this requirement. ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/15/24 2:49 PM MFPGs still exceed FFEs for all buildings except 7,9, & 11. ---------------------------------------------------------- Responded by: Ben Bemis - 2/22/24 7:36 PM The FFE has been added to the flood routing plan. ---------------------------------------------------------- Reviewer Response: Willie Hall - 10/12/23 8:33 AM The garage bays still appear to be flooded. Please provide FFE for the garage to confirm no flooding. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:20 AM The grading around the garages have been revised. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 80 1 Planning & Zoning Alexia Lopez 7/30/23 9:55 PM Changemark Label Setback lines Label the setback lines on C201 through C207 Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:29 AM These have been labeled in the layout plans. Resolved 81 1 Planning & Zoning Alexia Lopez 7/30/23 9:56 PM Changemark Label Property Line Please label the property line on the site plan sheets or put in in the legend. Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:29 AM These have been labeled in the layout plans. Resolved 82 1 Planning & Zoning Alexia Lopez 7/30/23 9:57 PM Changemark Label ROW Label the ROW on the north part of the north south road on sheet C 201 Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:29 AM This will be labeled in the layout plans. Resolved 83 1 Planning & Zoning Alexia Lopez 7/30/23 9:58 PM Changemark Private Drives Can you label the private drives so it is clear it is not ROW. Site Plans C201.pdf Responded by: Ben Bemis - 2/28/24 12:52 PM The private drives were labeled on sheet C201 and other site plans. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/7/23 5:00 PM What are the layout plans? What sheet number is that? ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:29 AM These have been labeled in the layout plans. Resolved 84 1 Planning & Zoning Alexia Lopez 7/30/23 10:00 PM Changemark Lot 1 south setback front yard I believe the south setback line for Lot 1 is a front yard since it is adjacent to a public road. Per B-3 this should be 60 ft. Please adjust the plans. Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:29 AM This road is intended to be private. Resolved 85 1 Planning & Zoning Alexia Lopez 7/30/23 10:01 PM Changemark Label Open Space on Site Plans Please label this area south of Lot 1 as Open Space to reduce confusion. Site Plans C201.pdf Responded by: Ben Bemis - 2/28/24 1:06 PM This area is now labeled as a Dog Park. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/7/23 5:09 PM What are the Layout plans? What sheet number is that. Please label it on the site plans as well. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:29 AM These have been labeled in the layout plans. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 86 1 Planning & Zoning Alexia Lopez 7/30/23 10:03 PM Changemark Show Setback line for Lot 2 Show the front yard setback line for this building on Lot 2 since it is along a public ROW. For B-3 I believe this should be 30 ft. Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:30 AM This road is intended to be private. Resolved 87 1 Planning & Zoning Alexia Lopez 7/30/23 10:05 PM Changemark Add grass area Please make this area grass between the sidewalk and the drive in front of the building entrances. Please make this change to all buildings. Then you could also add a tree here. Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:30 AM Grass areas have been added to the driveways. Resolved 88 1 Planning & Zoning Alexia Lopez 7/30/23 10:07 PM Changemark Grass area between driveways Can you make a grass area or landscape area between driveways instead of all being concrete? Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:30 AM Grass areas have been added to the driveways. Resolved 89 1 Planning & Zoning Alexia Lopez 7/30/23 10:11 PM Changemark Add Building Numbers to Site Plans Please assign a building number for each apartment building and add the building numbers to the site plans. Site Plans C201.pdf Responded by: Ben Bemis - 2/28/24 12:54 PM Building 11 was labeled on sheet C201. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/7/23 5:13 PM I did not see a building number on Sheet C 201 ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:30 AM Building numbers have been added to the plans. Resolved 90 1 Planning & Zoning Alexia Lopez 7/30/23 10:19 PM Library Comment Submit a copy of the Adjoining Property Owners List from Hamilton County. Responded by: Rick Lawrence - 8/8/23 8:11 PM See uploaded proof of service package Resolved 91 1 Planning & Zoning Alexia Lopez 7/30/23 10:19 PM Library Comment Provide the filled out and notarized affidavit of notice of public hearing page of the application. Responded by: Rick Lawrence - 8/8/23 8:11 PM See uploaded proof of service package Resolved 92 1 Planning & Zoning Alexia Lopez 7/30/23 10:19 PM Library Comment Provide the filled out Notice of Public Hearing page of the application. Responded by: Rick Lawrence - 8/8/23 8:11 PM See uploaded proof of service package Resolved 93 1 Planning & Zoning Alexia Lopez 7/30/23 10:19 PM Library Comment Submit Proof of Publication from the newspaper. Responded by: Rick Lawrence - 8/8/23 8:11 PM See uploaded proof of service package Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 94 1 Planning & Zoning Alexia Lopez 7/30/23 10:19 PM Library Comment Submit Certificate of Mailing for proof of mailing. Responded by: Rick Lawrence - 8/8/23 8:11 PM See uploaded proof of service package Resolved 95 1 Planning & Zoning Alexia Lopez 7/30/23 10:19 PM Library Comment Submit a copy of the Sign Affidavit. Responded by: Rick Lawrence - 8/8/23 8:11 PM See uploaded proof of service package Resolved 96 1 Planning & Zoning Alexia Lopez 7/30/23 10:20 PM Library Comment Submit a copy of the Adjoining Property Owners List from Hamilton County. Responded by: Rick Lawrence - 8/8/23 8:11 PM See uploaded proof of service package Resolved 97 1 Planning & Zoning Alexia Lopez 7/30/23 10:20 PM Library Comment Provide the filled out and notarized affidavit of notice of public hearing page of the application. Responded by: Rick Lawrence - 8/8/23 8:11 PM See uploaded proof of service package Resolved 98 1 Planning & Zoning Alexia Lopez 7/30/23 10:20 PM Library Comment Provide the filled out Notice of Public Hearing page of the application. Responded by: Rick Lawrence - 8/8/23 8:11 PM See uploaded proof of service package Resolved 99 1 Planning & Zoning Alexia Lopez 7/30/23 10:20 PM Library Comment Submit Proof of Publication from the newspaper. Responded by: Rick Lawrence - 8/8/23 8:11 PM See uploaded proof of service package Resolved 100 1 Planning & Zoning Alexia Lopez 7/30/23 10:20 PM Library Comment Submit Certificate of Mailing for proof of mailing. Responded by: Rick Lawrence - 8/8/23 8:11 PM See uploaded proof of service package Resolved 101 1 Planning & Zoning Alexia Lopez 7/30/23 10:20 PM Library Comment Submit a copy of the Sign Affidavit. Responded by: Rick Lawrence - 8/8/23 8:12 PM See uploaded proof of service package Resolved 102 1 Planning & Zoning Alexia Lopez 7/30/23 10:37 PM Library Comment Please list what green or sustainable site or building design aspects will implemented, similar to the LEED checklist: www.usgbc.org/leed/rating- systems from the US Green Building Council. (This is not a requirement, but the Commission looks favorably upon this.) Responded by: Rick Lawrence - 10/2/23 5:08 PM See residential committee brochure Resolved 103 1 Planning & Zoning Alexia Lopez 7/30/23 10:53 PM Changemark Label this area Please label this area. Is it fenced in? Site Plans C203.pdf Responded by: Ben Bemis - 10/6/23 9:30 AM This area has been labeled. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 104 1 Planning & Zoning Alexia Lopez 7/30/23 10:53 PM Changemark Parallel Parking Could you move this building south a little and add some parallel parking spaces? Please look at other areas around the site where you might be able to add some parallel spaces. Site Plans C203.pdf Responded by: Ben Bemis - 10/6/23 9:31 AM Parking spaces have been added to the site plans and the number of residential units has been reduced. Therefore the unit/parking space ratio has been improved for the overall site. Resolved 105 1 Planning & Zoning Alexia Lopez 7/30/23 10:53 PM Changemark Label this space Please label this area. Are these garages? Site Plans C203.pdf Responded by: Ben Bemis - 10/6/23 9:32 AM These have been labeled in the layout plans. Resolved 106 1 Planning & Zoning Alexia Lopez 7/30/23 10:53 PM Changemark Fence Height Will this fence be 6 ft. or 8 ft. Or does the height change around the site? The legend says 6 ft. but sheet C207 says 8 ft. Site Plans C203.pdf Responded by: Ben Bemis - 10/6/23 9:32 AM The perimeter fence is planned to be 8-ft. ---------------------------------------------------------- Responded by: Rick Lawrence - 8/8/23 8:12 PM The fence is 8 feet high throughout the site Resolved 107 1 Planning & Zoning Alexia Lopez 7/30/23 10:53 PM Changemark Fence Drawings Please submit drawings of the design of the fence. Site Plans C203.pdf Responded by: Ben Bemis - 2/28/24 12:54 PM Fence details have been uploaded, please reference sheets L502 and L503. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/7/23 5:19 PM Please upload the details for the fence design so that I can stamp it approved. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:33 AM Details will be added to the plans. ---------------------------------------------------------- Responded by: Rick Lawrence - 8/8/23 8:13 PM See uploaded drawings of the fence Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 108 1 Planning & Zoning Alexia Lopez 7/30/23 10:53 PM Changemark Perpendicular Parking Could you add some perpendicular parking spaces in this area? Site Plans C203.pdf Responded by: Ben Bemis - 10/6/23 9:32 AM Parking spaces have been added to the site plans and the number of residential units has been reduced. Therefore the unit/parking space ratio has been improved for the overall site. Resolved 109 1 Planning & Zoning Alexia Lopez 7/30/23 10:59 PM Changemark Label this area Is this an amenity area? Site Plans C202.pdf Responded by: Ben Bemis - 10/6/23 9:33 AM The amenity area has been updated. Resolved 110 1 Planning & Zoning Alexia Lopez 7/30/23 10:59 PM Changemark Label setback lines Please label these dashed lines. Site Plans C202.pdf Responded by: Ben Bemis - 2/28/24 1:02 PM The dashed lines were added to the legend on the site plans. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/8/23 3:55 PM I do not see this labeled or provided in the Legend on this sheet. Please revise so that it is clear when looking at each sheet and one doesn't have to flip between different pages to find labels. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:33 AM These have been labeled in the layout plans. Resolved 111 1 Planning & Zoning Alexia Lopez 7/30/23 11:02 PM Changemark Parallel Parking Please look into adding some parallel spots along this side of the road. It may help reduce the amount of your variance request and it helps calm traffic. But keep the tree lawn between the sidewalk and the parking. Site Plans C202.pdf Responded by: Ben Bemis - 10/6/23 9:32 AM Parking spaces have been added to the site plans and the number of residential units has been reduced. Therefore the unit/parking space ratio has been improved for the overall site. Resolved 112 1 Planning & Zoning Alexia Lopez 7/30/23 11:10 PM Changemark Label Dotted setback line Please make sure these meets the UDO standards for a front setback line since it is adjacent to a public street. Site Plans C204.pdf Responded by: Ben Bemis - 10/6/23 9:33 AM The roads are intended to be private. Resolved 113 1 Planning & Zoning Alexia Lopez 7/30/23 11:10 PM Changemark Label this as ROW Label this as public ROW if it is. Site Plans C204.pdf Responded by: Ben Bemis - 10/6/23 9:33 AM The roads are intended to be private. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 114 1 Planning & Zoning Alexia Lopez 7/30/23 11:10 PM Changemark Dashed lines to pond What are these dashed lines leading to the pond? Please label. Site Plans C204.pdf Responded by: Ben Bemis - 10/6/23 9:33 AM This is the BMP/Drainage easement limit. A label has been added to clarify this. Resolved 115 1 Planning & Zoning Alexia Lopez 7/30/23 11:10 PM Changemark Label this dashed line in the pond. Please label this dashed line, Site Plans C204.pdf Responded by: Ben Bemis - 2/28/24 1:03 PM The pond normal pool line was added to the legend in the site plans. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/8/23 4:01 PM Thank you, but I still did not see a label on this sheet. Please either label the dashed line or add it to the Legend. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:33 AM This dashed line is the limit of the 'normal pool' of the pond. Resolved 116 1 Planning & Zoning Alexia Lopez 7/30/23 11:10 PM Changemark Pool Label Is this the pool? Please label. Site Plans C204.pdf Responded by: Ben Bemis - 10/6/23 9:33 AM The pool area has been updated with detail. Resolved 117 1 Planning & Zoning Alexia Lopez 7/31/23 11:24 PM Changemark Label Bubble Line Please label this bubble line on all sheets. Is this tree preservation? Site Plans C206.pdf Responded by: Ben Bemis - 2/28/24 1:04 PM The post construction tree line was added to the site plan legend. ---------------------------------------------------------- Reviewer Response: Alexia Lopez - 12/8/23 4:05 PM Thank you for the response but please provide this label in the Legend so anyone reading these plans knows what it is. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:34 AM This is the limit of the tree line post construction. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 118 1 Hamilton County Surveyor Samuel Clark 8/1/23 10:51 AM Comment This lot is located outside of a Hamilton County watershed. Therefore, no permitting from our office will be needed. Responded by: Ben Bemis - 4/12/24 9:02 AM Please change status to 'Resolved' ---------------------------------------------------------- Responded by: Ben Bemis - 3/23/24 10:22 AM Comment noted. Please change to 'Resolved'. ---------------------------------------------------------- Responded by: Ben Bemis - 2/22/24 7:37 PM Comment noted. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:29 AM Comment noted. Info Only 119 1 Planning & Zoning Alexia Lopez 8/7/23 5:20 PM Changemark Color Elevations do not match black and white These color elevations do not appear to match the black and white elevations. Such as as the window placement and window headers. Please upload the correct color elevations for the next submittal. 23-05-26 REI - Edge Color Elevations.pdf Responded by: Rick Lawrence - 8/8/23 8:13 PM Revised elevations are uploaded to correspond between the color and black and white. Resolved 120 1 Planning & Zoning Alexia Lopez 8/7/23 5:20 PM Changemark Percent Siding What percent of the non-window facade area is siding? The UDO limits this material to 10 percent. 23-05-26 REI - Edge Exterior Elevations.pdf Responded by: Rick Lawrence - 8/8/23 8:13 PM The blank and white elevations note that the siding material on all buildings is 10%. Resolved 121 1 Planning & Zoning Alexia Lopez 8/8/23 10:26 AM Library Comment Please submit an exhibit of the proposed black lined site plan overlaid upon a current aerial photo of the immediate area. Responded by: Ben Bemis - 2/28/24 1:04 PM An site plan aerial overlay exhibit was added to the correspondence folder in ProjectDox. ---------------------------------------------------------- Responded by: Ben Bemis - 10/6/23 9:34 AM This will be included with the resubmittal. Resolved 122 1 Planning & Zoning Alexia Lopez 8/8/23 10:34 AM Changemark Property Line on Lighting Plan Please clear show and label the property line on the lighting plan. THE EDGE Photometrics 2023-05- 22.pdf Responded by: Ben Bemis - 10/6/23 4:39 PM Property line is shown and labeled. See updated photometrics plan. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 123 1 Planning & Zoning Alexia Lopez 8/8/23 10:34 AM Changemark Lighting Levels on northeast boundary These lighting levels appear to be over the allowed 0.1 foot-candles at the property line. Please make changes to lower the foot candles at the property line. THE EDGE Photometrics 2023-05- 22.pdf Responded by: Ben Bemis - 10/6/23 4:39 PM The lighting levels have been revised. Please see updated Photometrics plan. Resolved 124 2 Urban Forestry Daren Mindham 10/12/23 10:59 AM Changemark wording to add Please add a note to this area, that if any existing evergreen trees are not sufficiently screening per the Urban Forester, that any gaps will need to be filled per the bufferyard requirements. L100 Altum Landscape Plan-L101.pdf Responded by: Ben Bemis - 2/28/24 1:08 PM A note has been added, please see the updated L101 sheet. Resolved 125 2 TriCo Regional Sewer Utility Ryan Hartman 10/19/23 3:54 PM Comment TriCo performed our review and sent comments to CEC on 10/19 Responded by: Ben Bemis - 2/28/24 1:15 PM TriCo Comments have been addressed and returned to TriCo. Resolved 126 2 Carmel Water Operations Steve Cook 10/20/23 8:27 AM Changemark Changemark note #01 please contact to schedule an in person review of drawings Steve Cook 317- 733-2849 scook@carmel.in.gov C500 OVERALL UTILITY PLAN.pdf Responded by: Ben Bemis - 2/28/24 12:40 PM We met in person with Steve Cook and John Duffy regarding the water on November 9th, 2023. Resolved 127 2 Engineering Alex Jordan 10/23/23 3:06 PM Changemark The earlier sheets in this manual call for an XC-9 and XC-10 Please clarify if two XC-9's are planned or if a 9 and 10 will be installed. 311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/22/24 7:44 PM (1) XC-9 & (1) XC-10 are planned. The O&M manual has been revised to clarify this. Resolved 128 2 Planning & Zoning Alexia Lopez 12/11/23 2:17 PM Changemark HVAC Units Bldg 10 Please move some of these units to the southside of the sidewalk so they aren't so close to the street and sidewalk on the north side. This was discussed and agreed to via email. Refer to email sent to Ryan Wells on 9-18 -23 Site Plans C202.pdf Responded by: Ben Bemis - 2/28/24 1:17 PM The HVAC units have been shifted to the southside of the sidewalk. See updated sheet C202. Resolved 129 2 Planning & Zoning Alexia Lopez 12/11/23 3:35 PM Changemark Update Pedestrian Plan Please update the pedestrian plan with the most recent site layout. Site Plans C207.pdf Responded by: Ben Bemis - 2/28/24 1:17 PM The pedestrian plan has been updated with the new site layout and was uploaded to ProjectDox. Resolved 130 3 Engineering Alex Jordan 3/13/24 10:30 AM Changemark Will inline or offline units be used on the project? Both the plans and O&M provide details for inline units but offline units are shown in the plans and O&M site map. Please clarify which configuration will be used and revise the details or plans/site map accordingly. C805 STORMWATER DETAILS.pdf Responded by: Ben Bemis - 3/23/24 10:20 AM The XC-units can be used in inline/offline configurations interchangeably. The "Inline" designation on the detail titles has been removed to avoid confusion. Resolved Plan Review - Review Comments Report Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel Workflow Started: 6/21/2023 10:19:13 AM Report Generated: 04/24/2024 03:59 PM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 131 3 Engineering Alex Jordan 3/13/24 2:36 PM Changemark Please clarify that the easements over the pond and vegetated swale are also BMP easements I was unable to locate a call out for the easements over these two items. C900 STORMWATER POLLUTION PREVENTION PLAN.pdf Responded by: Ben Bemis - 3/23/24 10:21 AM Notes have been added to the SWPP Plan to clarify that these easements are for BMP accessibility. Resolved 132 3 Planning & Zoning Alexia Lopez 3/15/24 2:01 PM Changemark Tree Preservation Can you please make a note or clearly show which trees will be preserved. This Demolition Item 25 reads as though all of this area will be removed. We want to make it clear on all the plans, including the demo plans, that the trees that were agreed to be preserved are preserved. C101 DEMOLITION PLAN.pdf Responded by: Ben Bemis - 3/24/24 12:34 PM Notes and trees have been added to the demolition plan for clarification to the contractor. See updated sheet C101. Resolved 133 3 CrossRoad Engineers Willie Hall 3/15/24 2:58 PM Changemark Grading around buildings Grading between walk and buildings indicate that drainage is being routed towards the building. Please revise grading or accurately show on flood routing sheet. C304 GRADING PLAN - AREA D.pdf Responded by: Ben Bemis - 4/12/24 9:02 AM The grading has been revised and the flood routing plan has been updated. ---------------------------------------------------------- Reviewer Response: Willie Hall - 3/27/24 10:47 AM This comment also applies to the buildings in Areas A, B, C, E, & F. The flood routing sheet still needs to be updated to include all of the depressional landscape areas containing yard inlets where water would stage in a fully clogged scenario. ---------------------------------------------------------- Responded by: Ben Bemis - 3/24/24 12:33 PM The grading around the building in Area D was revised to allow positive drainage away from the building. See update sheet C304. Resolved 134 4 Engineering Alex Jordan 4/4/24 11:11 AM Comment We have no further comments on plans. Before we can issue a stormwater management permit, the following will need to be provided: 1. A signed and recorded O&M manual 2. A non-expiring erosion control performance bond for 100% of the approved estimate 3. A completed BMP easement agreement with exhibits and legal description (template uploaded to the drainage document folder) Info Only NET & Frankenberger LLC Attorneys at Law 550 Congressional Blvd., Suite 210, Carmel, Indiana 46032 317-844-0106 JAMES E. SHINAVER JON C. DOBOSIEWICZ LAWRENCE J.KEMPER' Land Use Professional JOHN B. FLATT• FREDRIC LAWRENCE VALERIE L.MATHEIS** *Also licensed in Kentucky JANE B.MERRILL—Of Counsel **Also licensed in Illinois FRED PFENNINGER —Of Counsel Via Hand Delivery October 6, 2023 City of Carmel Attn: Alexia Lopez One Civic Square Q�� U Carmel, IN 46032 2023 Re: REI Real Estate Investment, LLC The Edge at West Carmel DP/ADLS and Variances Request Docket Nos.PZ-2023-00136 DP/ADLS,PZ-2023-00157 V,PZ-2023-00158 V,PZ-2023- 00159 V,PZ-2023-00160 V,PZ-2023-00161 V,AND PZ-2023-00162 V Dear Alexia: Enclosed please find nine (9) copies of the brochures for distribution to the Plan Commission members for the October 17th meeting, as well as a flash drive that contains a digital copy of the brochure. Also included on the flash drive is a copy of the proof of noticing. Thanks for your assistance in this matter and should you have any questions please do not hesitate to contact me. Very truly yours, NELSON &FRANKENBERGER, LLC Jon C. Dobosiewicz Land Use Professional Enclosures Nelson & i,` Frankenberger, LLC Attorneys at Law 550 Congressional Blvd.. Suite 210, Carmel, Indiana 46032 317-844-0106 JAMES E. SHINAVER JON C. DOBOSIEWICZ LAWRENCE J. KEMPER` Land Use Professional JOHN B.FLATT* r FREDRIC LAWRENCE VALERIE VALERIE L.MATHEIS** � � W *Also licensed in Kentucky JANE B.MERRILL—Of Counsel cp **Also licensed in Illinois FRED PFENNINGER —Of Counsel Cr 2023 BY: Via Hand Delivery . .. September 22, 2023 City of Carmel Attn: Alexia Lopez One Civic Square Carmel, IN 46032 Re: REI Real Estate Investment, LLC The Edge at West Carmel DP/ADLS and Variances Request Docket Nos. PZ-2023-00136 DP/ADLS,PZ-2023-00157 V,PZ-2023-00158 V,PZ-2023- 00159 V,PZ-2023-00160 V,PZ-2023-00161 V,AND PZ-2023-00162 V Dear Alexia: Enclosed please find six (6) copies of the brochures for distribution to the Plan Commission members for the October 3rd meeting, as well as a flash drive that contains a digital copy of the brochure. Also included on the flash drive is a copy of the proof of noticing. Thanks for your assistance in this matter and should you have any questions please do not hesitate to contact me. Very truly yours, NELSON & FRANKENBERGER, LLC Jon C. Dobosiewicz Land Use Professional Enclosures i\F Nelson & Frarikenberger, LLCLin-6L"Attorneys at Law 550 Congressional Blvd., Suite 210, Carmel, Indiana 46032 317-844-0106 JAMES E.SHINAVER JON C.DOBOSIEWICZ LAWRENCE J.KEMPER* Land Use Professional JOHN B.FLATT* FREDRIC LAWRENCE VALERIE L.MATHEIS** *Also licensed in Kentucky JANE B.MERRILL—Of Counsel **Also licensed in Illinois FRED PFENNINGER —Of Counsel Via Hand Delivery R7'cEIVED August 4, 2023 City of Carmel O Attn: Alexia Lopez BY:..... ...................... One Civic Square Carmel, IN 46032 Re: REI Real Estate Investment, LLC The Edge at West Carmel DP/ADLS and Variances Request Docket Nos.PZ-2023-00136 DP/ADLS,PZ-2023-00157 V,PZ-2023-00158 V,PZ-2023- 00159 V,PZ-2023-00160 V,PZ-2023-00161 V,AND PZ-2023-00162 V Dear Alexia: Enclosed please find nine (9) copies of the brochures for distribution to the Plan Commission members for the April 19th meeting, as well as a flash drive that contains a digital copy of the brochure. Also included on the flash drive is a copy of the proof of noticing. Thanks for your assistance in this matter and should you have any questions please do not hesitate to contact me. Very truly yours, NELSON& FRANKENBERGER, LLC Jon C. Dobosiewicz Land Use Professional Enclosures