1 1 Addressing
Dave McCoy
6/27/23 8:33 AM
Comment
For addressing purposes, 5 streets within this development will need to be
named. Please contact me to discuss the process for naming streets.
Info Only
2 1 CrossRoad
Engineers
Willie Hall
6/27/23 9:51 AM
Comment
REVIEW PENDING - please submit all information required by Sec. 102.07 of
the City of Carmel Stormwater Technical Standards Manual so we can
complete our review.
Resolved
3 1 Engineering
Alex Jordan
6/27/23 10:38 AM
Comment
This appears to be an incomplete submittal as only the 200 series of the civil
plans were upload. Additionally, there was no drainage report or O&M
manual provided. Please provide a full submittal with the new review cycle in
order for our review to begin.
Info Only
4 1 Urban Forestry
Daren Mindham
6/29/23 2:01 PM
Changemark
Alternate
I don't see the use of this schedule, please explain.
L510 The Edge Landscape Details-
L500.pdf
Responded by: Ben Bemis - 10/6/23 4:36 PM
Please see the revised plans sheets.
----------------------------------------------------------
Responded by: Rick Lawrence - 8/11/23 10:33 AM
Added labels to call out alternate bid areas
Resolved
5 1 Urban Forestry
Daren Mindham
6/29/23 2:03 PM
Changemark
landscape bed
Please add a landscape bed to screen the utilities and to provide landscaping
on both sides of the entrance.
L200 The Edge Building Base
Landscape Plan-L205.pdf
Responded by: Ben Bemis - 10/6/23 4:36 PM
So noted. Please see the revised plans sheets.
----------------------------------------------------------
Responded by: Rick Lawrence - 8/11/23 10:33 AM
Provided more landscape bed to screen the utilities and
both sides of the entrance
Resolved
6 1 Urban Forestry
Daren Mindham
6/29/23 2:07 PM
Changemark
remove tree
Please remove this tree is too close to the intersection and has a shortened
soil volume area.
L100 The Edge Landscape Plan-
L103.pdf
Responded by: Ben Bemis - 10/6/23 4:37 PM
So noted. Please see the revised plans sheets.
----------------------------------------------------------
Responded by: Rick Lawrence - 8/11/23 10:33 AM
Relocated the tree
Resolved
REVIEW COMMENTS
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
7 1 Urban Forestry
Daren Mindham
6/29/23 2:07 PM
Changemark
trees with arrows
Please move these trees a bit further from the intersection to increase vision
clearance views.
L100 The Edge Landscape Plan-
L103.pdf
Responded by: Ben Bemis - 10/6/23 4:37 PM
So noted. Please see the revised plans sheets.
----------------------------------------------------------
Responded by: Rick Lawrence - 8/11/23 10:33 AM
Relocated these two trees
Resolved
8 1 Urban Forestry
Daren Mindham
6/29/23 2:19 PM
Changemark
tree changes
Please add two oak trees along the sidewalk path and move or remove the
zelkova away from this bend so not to affect vision clearance traffic. This
bend seems like it could be hard to maneuver with moving trucks and traffic.
L100 The Edge Landscape Plan-
L101.pdf
Responded by: Ben Bemis - 10/6/23 4:37 PM
So noted. Please see the revised plans sheets.
----------------------------------------------------------
Responded by: Rick Lawrence - 8/11/23 10:33 AM
Added two oak trees
Resolved
9 1 Urban Forestry
Daren Mindham
6/29/23 2:19 PM
Changemark
move label
Please move label so that the arrow at the intended tree location.
L100 The Edge Landscape Plan-
L101.pdf
Responded by: Ben Bemis - 10/6/23 4:37 PM
So noted. Please see the revised plans sheets.
----------------------------------------------------------
Responded by: Rick Lawrence - 8/11/23 10:34 AM
Moved label to correct location
Resolved
10 1 Urban Forestry
Daren Mindham
6/29/23 2:19 PM
Changemark
reforestation instead of landscape buffer on eastern perimeter
I would like to recommend instead of a landscape buffer, that this perimeter
be landscaped with shade trees to be converted into a woodlands. This
would entail planting 2" caliper native shade trees every 10' in a honeycomb
shape and making notations that this area would be a naturalized 'no mow'
area.
L100 The Edge Landscape Plan-
L101.pdf
Responded by: Ben Bemis - 10/6/23 4:37 PM
So noted. Please see the revised plans sheets.
----------------------------------------------------------
Responded by: Rick Lawrence - 8/11/23 10:34 AM
Provided 25 more shade trees in place of the evergreen
trees and shrubs
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
11 1 Urban Forestry
Daren Mindham
6/29/23 2:24 PM
Changemark
Bufferyard widths
Please add notes about each areas bufferyard width. For instance, the
eastern perimeter is a 25' wide bufferyard as its a 'C' level rear buffer. Please
include the Mich Rd 30' greenbelt width. The north buffer from west to east
is 5', 10', 15' The south buffer from west to east is 5', 10', 5'
L100 The Edge Landscape Plan-
L100.pdf
Responded by: Ben Bemis - 2/28/24 1:08 PM
This has been updated, please see the revised ordinance
chart on L100.
----------------------------------------------------------
Reviewer Response: Daren Mindham - 10/12/23 10:55
AM
I don't see these added to the ordinance chart. I assume
it would be shown right after the 'Type' notation.
----------------------------------------------------------
Reviewer Response: Daren Mindham - 10/12/23 10:55
AM
I don't see these added to the ordinance chart. I assume
it would be shown right after the Type
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 4:37 PM
So noted. Please see the revised plans sheets.
----------------------------------------------------------
Responded by: Rick Lawrence - 8/11/23 10:34 AM
Dimensions have been added to the ordinance chart
Resolved
12 1 Fire
Carmel Fire
7/3/23 8:12 AM
Comment
The Fire hydrant layout and numbers are not sufficient for the amount and
size of buildings proposed. The current fire hydrant plan as proposed is not
approved by CFD. The design engineer needs to contact Capt. Chris Ellison at
317-571-2600 to discuss an approved fire hydrant layout and utility plan.
Responded by: Ben Bemis - 10/6/23 9:28 AM
More fire hydrants have been added to the plans, see
C500 series. We will follow up and coordinate with CFD.
Info Only
13 1 Fire
Carmel Fire
7/3/23 8:31 AM
Comment
Section 3312.1 Fire Hydrants shall be fully functional tested and approved
prior to any combustible materials arriving on the construction site.
Responded by: Ben Bemis - 10/6/23 9:29 AM
More fire hydrants have been added to the plans, see
C500 series. We will follow up and coordinate with CFD.
Info Only
14 1 Fire
Carmel Fire
7/3/23 8:32 AM
Comment
Section 3310.1 Required Fire Department Vehicle Access. Approved Asphalt
fire apparatus access roads shall be provided to and through the
construction site during construction. Fire Apparatus access road must be
capable of supporting the weight of fire apparatus and maintained clear at
all times.
Responded by: Ben Bemis - 10/6/23 9:29 AM
A note has been added to the Utility Plan for the
contractor to provide this prior to building construction.
Please see sheet C500.
Info Only
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
15 1 Sign Permits
Aliza Shalit
7/12/23 8:53 AM
Comment
Will there be any proposed signage for this development? Anything planned
for the entrance? If so, please upload for review.
Reviewer Response: Aliza Shalit - 10/17/23 9:52 AM
An ADLS Amend will be required for an entrance sign
when this comes through.
----------------------------------------------------------
Responded by: Rick Lawrence - 8/8/23 8:14 PM
Signage for the multi-family has not yet been
determined. Once finalized, the appropriate permit will
be requested.
Info Only
16 1 Sign Permits
Aliza Shalit
7/12/23 8:54 AM
Comment
All exterior signage requires a separate sign permit application and review
process. Applications are submitted through the City of Carmel online
permitting portal.
Info Only
17 1 Sign Permits
Aliza Shalit
7/12/23 8:55 AM
Changemark
Window Signs
Maximum allowable window sign area is 3sf. Please make sure etched door
signage complies with this requirement.
23-05-26 REI - Edge Exterior
Elevations.pdf
Info Only
18 1 Vectren Energy
Chad Miller
7/12/23 10:22 AM
Changemark
CenterPoint Energy
Will the proposed buildings or anything on this site need gas service? We
will need load information if they do want gas and also an AutoCAD file.
C500 OVERALL UTILITY PLAN.pdf Info Only
19 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please provide a legal description of site on the cover sheet
Responded by: Ben Bemis - 10/6/23 9:23 AM
This has been added to the Title Sheet.
Resolved
20 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please provide the sites total disturbance on the cover sheet
Responded by: Ben Bemis - 2/22/24 6:18 PM
This has been added to the Title Sheet in the Site Data
table.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/23/23 2:56 PM
We are unable to locate this on the cover sheet. Please
revise.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:23 AM
This has been added to the Title Sheet.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
21 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please submit a storm water management permit application
Responded by: Ben Bemis - 10/6/23 9:24 AM
This will be submitted.
Resolved
22 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please provide all technical information required by Section 102.02(xi)(m) of
the Storm Water Technical Standards
Responded by: Ben Bemis - 2/22/24 6:54 PM
The Drainage Summary has been added to the Grading
Plan. Please see sheet C300.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/20/23 2:05 PM
We are unable to locate the drainage summary required
by this section. Please include on the grading plans.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:24 AM
Comment noted.
Resolved
23 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please provide the anticipated start construction date in a comment letter or
project summary
Responded by: Ben Bemis - 10/6/23 9:24 AM
This has been added to the Title Sheet.
Resolved
24 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please provide the City's paving policy in the set
Responded by: Ben Bemis - 10/6/23 9:24 AM
This has been added to the detail sheets.
Resolved
25 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please provide the City's curbing policy in the set
Responded by: Ben Bemis - 10/6/23 9:24 AM
This has been added to the detail sheets.
Resolved
26 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please verify that there are no direct discharge areas
Responded by: Ben Bemis - 10/6/23 9:24 AM
These have been included in the Drainage Map.
Resolved
27 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please clearly show the construction limits on all sheets with plan view (not
required on profile sheets)
Responded by: Ben Bemis - 10/6/23 9:24 AM
Construction limits have been added to all plan sheets.
Resolved
28 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please verify that all elevations are North American Vertical Datum of 1988
(NAVD)
Responded by: Ben Bemis - 10/6/23 9:25 AM
Updated on Cover Sheet
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
29 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please verify that the horizontal datum of topgraphic map is Indiana State
Plane Coordinates, NAD83
Responded by: Ben Bemis - 10/6/23 9:25 AM
Updated on Cover Sheet.
Resolved
30 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please verify that all existing culverts, pipes, and bridges on existing drives or
under the roadway are shown indicating size, type, and invert elevations
Responded by: Ben Bemis - 10/6/23 9:25 AM
This information is shown on the grading and drainage
plan sheets.
Resolved
31 1 Engineering
Alex Jordan
7/13/23 9:51 AM
Library Comment
Please verify that the locations of all existing electrical power vaults,
transformers, power lines, gas lines, television cable , and telephone lines are
shown
Responded by: Ben Bemis - 10/6/23 9:25 AM
Existing utilities are shown on grading and drainage
plan sheets.
Resolved
32 1 Engineering
Alex Jordan
7/17/23 2:08 PM
Library Comment
Please label the rights-of-way of all existing and proposed interior and
exterior streets. Pleas also provide road profiles for all public roads in the
development.
Responded by: Ben Bemis - 10/6/23 9:25 AM
The roads have been labeled as Private. ROW and
easement limits are included on the plans.
Resolved
33 1 Engineering
Alex Jordan
7/17/23 2:08 PM
Library Comment
Please label the widths of all internal drives, drive aisles, alleys, and streets
Responded by: Ben Bemis - 10/6/23 9:25 AM
These dimensions have been added to the layout sheets
Resolved
34 1 Engineering
Alex Jordan
7/17/23 2:08 PM
Library Comment
Please label private streets are labeled as such
Responded by: Ben Bemis - 2/22/24 6:55 PM
These labels can be found on sheets C201-C206.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/20/23 1:31 PM
We are unable to locate these call outs on the 200
series. Please revise.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:26 AM
These labels have been added to the layout sheets
Resolved
35 1 Engineering
Alex Jordan
7/17/23 2:08 PM
Library Comment
Please show subsurface drains under the curb of all streets
Responded by: Ben Bemis - 10/6/23 9:26 AM
Subsurface drainage have been added to the drainage
plans.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
36 1 Engineering
Alex Jordan
7/17/23 2:08 PM
Library Comment
Please indicate all existing and proposed utilities on the profiles with the size,
pipe material, and inverts
Responded by: Ben Bemis - 10/6/23 9:26 AM
This information has been added to the profile sheets.
Resolved
37 1 Engineering
Alex Jordan
7/17/23 2:08 PM
Library Comment
Please provide the hydraulic grade line on the profiles
Responded by: Ben Bemis - 10/6/23 9:26 AM
This information has been added to the profile sheets.
Resolved
38 1 Engineering
Alex Jordan
7/17/23 2:08 PM
Library Comment
Please show the SSD connections to structures on the profiles
Responded by: Ben Bemis - 10/6/23 9:26 AM
This information has been added to the profile sheets.
Resolved
39 1 Engineering
Alex Jordan
7/17/23 2:09 PM
Library Comment
Please provide the design speed on the cover sheet
Responded by: Ben Bemis - 10/6/23 9:26 AM
The drives are intended to be private drives.
Resolved
40 1 CrossRoad
Engineers
Willie Hall
7/18/23 1:26 PM
Changemark
102.02.v.f
The Existing Project Site Layout shall include the location of storm, sanitary,
combined sewer, and septic tank systems and outfalls with all top of casting
elevation, invert elevations, pipe sizes, and pipe material indicated. Existing
structure and pipe information shall be as-built information and not design
information.
C100 EXISTING CONDITIONS.pdf Responded by: Ben Bemis - 10/6/23 9:06 AM
All known information has been included on the C 100
plan sheet.
Resolved
41 1 CrossRoad
Engineers
Willie Hall
7/18/23 1:33 PM
Changemark
102.02.vii
the Plan and Profile Sheet(s) shall include the limits of granular backfill may
be indicated on the plan and profile sheets; however, any references with
general notes, plan notes, or legends to the granular backfill material shall
reference the appropriate trench detail on the detail sheets.
C409 STORM PROFILES.pdf Responded by: Ben Bemis - 10/6/23 9:08 AM
This has been added to the profile sheets.
Resolved
42 1 CrossRoad
Engineers
Willie Hall
7/18/23 1:33 PM
Changemark
102.02.vii
the Plan and Profile Sheet(s) shall include the hydraulic grade line indicated
on the profiles to demonstrate that the hydraulic grade line remains below
the rim elevation for the design condition.
C409 STORM PROFILES.pdf Responded by: Ben Bemis - 10/6/23 9:08 AM
This has been added to the profile sheets.
Resolved
43 1 CrossRoad
Engineers
Willie Hall
7/18/23 1:37 PM
Changemark
Inverts
Invert into Str 325 from Str 333 is lower the in outlet invert.
C412 STORM PROFILES.pdf Responded by: Ben Bemis - 10/6/23 9:07 AM
This has been corrected.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
44 1 CrossRoad
Engineers
Willie Hall
7/18/23 1:38 PM
Changemark
501.01
there should be no less than 2.5 feet of cover along any part of the pipe
from final pavement elevation or final ground surface elevation to the top of
the pipe.
C410 STORM PROFILES.pdf Reviewer Response: Willie Hall - 10/11/23 4:05 PM
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:08 AM
2.5 feet of cover has been provided where possible.
Resolved
45 1 CrossRoad
Engineers
Willie Hall
7/18/23 1:49 PM
Changemark
102.02.xi.a
the grading and drainage plan shall include existing drainage facilities,
including size, material, invert elevations and top casting information.
Existing structure and pipe information shall be as-built information and not
design information.
C301 GRADING PLAN - AREA A.pdf Responded by: Ben Bemis - 10/6/23 9:09 AM
This information has been added to the grading plans.
Resolved
46 1 CrossRoad
Engineers
Willie Hall
7/18/23 1:49 PM
Changemark
102.02.xi.d
the grading and drainage plan shall include the delineation of all proposed
land disturbing activities, including off-site activities that will provide services
to the project site.
C301 GRADING PLAN - AREA A.pdf Responded by: Ben Bemis - 10/6/23 9:09 AM
This information has been added to the grading plans.
Resolved
47 1 CrossRoad
Engineers
Willie Hall
7/18/23 1:50 PM
Changemark
102.02.xi.n
the grading and drainage plan shall provide details of the storm system
showing connection to the main system or method of discharge into stream
or reservoir, distance to stream outlet, locations and sizes of lift stations,
manholes, inlets, junction boxes, and other necessary appurtenances.
C405 STORMWATER PLAN - AREA
D.pdf
Reviewer Response: Willie Hall - 4/15/24 10:32 AM
Resolved with the understanding that the video will be
provided to the Engineering Department.
----------------------------------------------------------
Responded by: Ben Bemis - 4/12/24 8:57 AM
Everything was found to be in working order and it was
confirmed that the storm sewer does not blind-tee into
the INDOT storm sewer in Michigan Road. It continues
under the roadway and connects to an existing structure
west of Michigan Road. Since runoff from the site will be
reduced in the proposed condition and the existing
system is in good working order we believe the existing
downstream system will not be adversely affected.
----------------------------------------------------------
Responded by: Ben Bemis - 3/23/24 11:13 AM
The storm line will be televised on 3/27 and the
connection will be documented. This will be provided to
Carmel Engineering as soon as the information is
available.
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/15/24 2:13 PM
Please show the accurate condition on the plans.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
Engineering would also like to see photographic
evidence of the connection as well as a video of the
existing pipe to verify the condition of the pipe.
----------------------------------------------------------
Responded by: Ben Bemis - 2/22/24 6:56 PM
After further investigation it appears that the 15" RCP
ties into the storm structure on the west curb line of US
421. The proposed system is tying into the storm sewer
upstream of the existing beehive structure east of US
421. No work is proposed to be performed within the
ROW.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/11/23 4:31 PM
This comment was in reference to providing details on
how the storm sewer connects to the mainline within
Michigan Rd. C100 indicates the assumption that the
existing pipe blind tees to the mainline. This will not be
acceptable and will require a new manhole be installed
in lieu of a blind tee connection.
Please also provide the INDOT drainage permit.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:10 AM
Existing utilities are shown on grading and drainage
plan sheets. Profiles show the point of connection at
the existing storm pipe invert.
48 1 CrossRoad
Engineers
Willie Hall
7/18/23 2:20 PM
Comment
Drainage Report C-1 & C-2 exhibits 102.03.i. The overall drainage maps
should include the fully developed ROW across the site frontage unless
otherwise directed by Engineering.
Responded by: Ben Bemis - 10/6/23 9:10 AM
The frontage of the ROW is controlled by INDOT.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
49 1 Engineering
Alex Jordan
7/18/23 2:21 PM
Changemark
Please review and revise the building elevations
We require that the MLAG/MFPG for the buildings be set 1' above the
adjacent flooding, which for most of the buildings will be the 100-year
clogged event. Please review these elevations and revise them to meet this
requirement. Please also revise any FFE's of building that will be effected by
this, if necessary.
C408 FLOOD ROUTING PLAN.pdf Responded by: Ben Bemis - 3/23/24 10:14 AM
A waiver has been submitted for this requirement.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 3/13/24 11:17 AM
The MLAG/MFPGs are still listed above the FFE
elevations on most of the proposed buildings. These will
need to be addressed with the next submittal.
----------------------------------------------------------
Responded by: Ben Bemis - 2/22/24 6:56 PM
The grading has been revised to provide at least 6"
above the MLAG.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/20/23 2:04 PM
Thank you for raising the MLAG/MFPGs per this
comment. However, the FFEs were not revised as
requested and are now below the MLAG/MFPGs. Per
104.02 of the STSM, the FFE's must be at least 6" above
the lowest adjacent grade.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:26 AM
So noted. Please see the revised plans sheets.
Resolved
50 1 CrossRoad
Engineers
Willie Hall
7/18/23 2:24 PM
Comment
Drainage Report 102.03.i.b.iv Please include time of concentration
calculations.
Responded by: Ben Bemis - 10/6/23 9:11 AM
Time of concentration calculation has been detailed and
included within HydroCAD report. Basins maps has also
been updated to show Tc flow path.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
51 1 CrossRoad
Engineers
Willie Hall
7/18/23 2:51 PM
Comment
Drainage Report Table 1 Please breakout discharge rates (direct discharge,
pond, swale). Please also include required detention, provided detention and
acreage to tributary to each detention facility. The acreage should be equal
to the overall site acreage.
Reviewer Response: Willie Hall - 3/27/24 11:20 AM
Resolved with the understanding the the City Engineer
verbally approved the waiver.
----------------------------------------------------------
Responded by: Ben Bemis - 3/23/24 9:36 AM
A waiver has been submitted for this requirement.
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/15/24 2:22 PM
Pending revisions per Ref.# 59, this comment will
remain unresolved.
----------------------------------------------------------
Responded by: Ben Bemis - 2/22/24 6:56 PM
The grading has been revised to provide at least 6"
above the MLAG.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/16/23 5:09 PM
This comment will remain unresolved until revised
existing discharge rates are provided.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:11 AM
This has been added to the table in the drainage report.
Resolved
52 1 CrossRoad
Engineers
Willie Hall
7/18/23 2:52 PM
Comment
Site Acreage Discrepancy GIS states the deeded acreage is 22.72, title page
shows 22.149 with .983 dedicated r/w and the drainage report 21.32. Please
verify which is correct.
Responded by: Ben Bemis - 10/6/23 9:11 AM
Drainage report updated to 22.149 ac.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
53 1 Engineering
Alex Jordan
7/18/23 3:01 PM
Changemark
Where will this be installed?
C800 SITE DETAILS.pdf Responded by: Ben Bemis - 2/22/24 6:57 PM
Detail 205 on Sheet C800 has been removed.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/20/23 2:11 PM
Please have this detail removed to avoid confusion.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:27 AM
This type of commercial driveway is not planned for this
project.
Resolved
54 1 CrossRoad
Engineers
Willie Hall
7/18/23 3:21 PM
Changemark
104.02
All swales shall be installed with a subsurface drain. Please show the curb
underdrain required per Carmel Standards.
C400 OVERALL STORMWATER
PLAN.pdf
Responded by: Ben Bemis - 10/6/23 9:11 AM
A swale underdrain has been added to the drainage
plans.
Resolved
55 1 Engineering
Alex Jordan
7/18/23 3:22 PM
Changemark
Please provide the native planting list for the banks and shelf on the civil
plans
C900 STORMWATER POLLUTION
PREVENTION PLAN.pdf
Responded by: Ben Bemis - 10/6/23 9:27 AM
List added on C903.
Resolved
56 1 Engineering
Alex Jordan
7/18/23 3:22 PM
Changemark
Please provide a hatching for the native vegetation
C900 STORMWATER POLLUTION
PREVENTION PLAN.pdf
Responded by: Ben Bemis - 2/22/24 7:47 PM
The hatched area has been clarified on the SWPP Plan.
See sheet C900.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/23/23 2:58 PM
Thank you for adding the legend item for this but it
does not appear that the hatching is shown on the plan
sheet or if is covered by the slope blanket hatching.
Please revise to make it clear where the plantings will
go.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:27 AM
Native vegetation area updated on C900.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
57 1 Engineering
Alex Jordan
7/18/23 3:22 PM
Changemark
Are these the locations of the native protection signage?
Please provide a legend item for this
C900 STORMWATER POLLUTION
PREVENTION PLAN.pdf
Responded by: Ben Bemis - 2/23/24 7:38 PM
Callouts for the signage have been added to the SWPP
Plans.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/23/23 2:59 PM
It appears that these signs were added but they are not
called out on the plans and a legend item is not
provided. Please revise.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:27 AM
This has been added to sheet C900.
Resolved
58 1 Engineering
Alex Jordan
7/18/23 3:22 PM
Changemark
Please place erosion control blanket within the swale flowlines
C900 STORMWATER POLLUTION
PREVENTION PLAN.pdf
Responded by: Ben Bemis - 10/6/23 9:27 AM
An erosion control blanket has been added to the swale.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
59 1 CrossRoad
Engineers
Willie Hall
7/18/23 3:26 PM
Comment
Drainage Report 302.03 The existing conditions shall be modeled as two
interconnected ponds as the existing pipe conditions, not as a single pond.
Post developed release rate for sites with depressional storage shall be the
2-year pre-developed peak runoff rate for the post-developed 10-year storm
and 10-year pre-developed peak runoff rate for the post developed 100-year
storm. In no case shall the calculated site-specific release rates be larger than
general release rates per this section.
Reviewer Response: Willie Hall - 3/27/24 11:20 AM
Resolved with the understanding the the City Engineer
verbally approved the waiver.
----------------------------------------------------------
Responded by: Ben Bemis - 3/23/24 9:36 AM
A waiver has been submitted for this requirement.
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/15/24 2:20 PM
Per the revised existing conditions, the existing site
outlet discharge rate is 1.98 cfs and 3.82 cfs for the 2-
and 10-yr storm events. 1.98 cfs and 3.82 cfs shall be
the 10- and 100-yr post developed release rates to
which this site will be held. Please make revisions
accordingly.
----------------------------------------------------------
Responded by: Ben Bemis - 2/22/24 6:58 PM
The Existing HydroCAD calculations have been updated
to show the two separate drainage areas.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/16/23 5:05 PM
Please revise the existing model to account for the
existing drainage basins to each pond. The city will also
require that the post development release rates be the
equal to or less than existing release rates or 0.1/0.3
cfs/acre, whichever is lesser.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:12 AM
Existing HydroCAD model has been updated to show
two interconnected ponds. This site does not have
depressional storage.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
60 1 CrossRoad
Engineers
Willie Hall
7/18/23 3:46 PM
Comment
Drainage Report 302.06.01 Please confirm that detention facilities are
designed in such a manner that a minimum 90% of the original detention
capacity is restored within 48 hours from the start of the design 100-year
storm by providing stage/storage vs time tables.
Reviewer Response: Willie Hall - 3/27/24 11:20 AM
Resolved with the understanding the the City Engineer
verbally approved the waiver.
----------------------------------------------------------
Responded by: Ben Bemis - 3/23/24 9:36 AM
A waiver has been submitted for this requirement.
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/15/24 2:21 PM
This comment will remain unresolved until the waiver is
approved at BPW.
----------------------------------------------------------
Responded by: Ben Bemis - 2/28/24 12:43 PM
Waiver request was uploaded to the correspondence
older in ProjectDox.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/11/23 5:21 PM
This comment will remain unresolved until the waiver
request is provided.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:12 AM
To maintain the allowable release rates for the extended
detention basin the control orifice needs to be 2". This
orifice size does not allow for the storage to be restored
to 90% capacity after 48 hrs. A variance will be
requested for this requirement.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
61 1 CrossRoad
Engineers
Willie Hall
7/18/23 3:55 PM
Comment
Drainage Report 302.11 Please provide emergency overflow calculations for
the emergency spillways to verify they are adequately sized to pass the
1.25x100YR peak inflow.
Responded by: Ben Bemis - 4/12/24 8:58 AM
Per Caleb Warner, BPW approved the waiver at their
April meeting.
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/27/24 11:21 AM
Resolved with the understanding the the City Engineer
verbally approved the waiver.
----------------------------------------------------------
Responded by: Ben Bemis - 3/23/24 9:37 AM
A waiver has been submitted for comment 59
requirement.
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/15/24 2:22 PM
Pending revisions per Ref.# 59, this comment will
remain unresolved.
----------------------------------------------------------
Responded by: Ben Bemis - 2/22/24 6:59 PM
Emergency overflow weir calculations for the pond and
the detention swale can be found in Appendix G.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/16/23 5:08 PM
Emergency Overflow calculations do not appear to be
included in drainage report. Appendix G appears to be
mislabeled in the TOC.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:12 AM
Emergency overflow calculations has been provided
through HydroCAD.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
62 1 CrossRoad
Engineers
Willie Hall
7/18/23 4:10 PM
Comment
Drainage Report 303 Please provide calculations confirming that the onsite
drainage swale meet the section 303 requirements.
Responded by: Ben Bemis - 2/22/24 7:00 PM
These areas are not designed as swales but as inlet
basin areas. The inlet basins are adequately sized to
convey stormwater per the stormwater manual.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/11/23 5:25 PM
There are 'rear yard' swales along the southern, eastern
and northern edges of the property. Please provide
capacity calculations for these.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:12 AM
The drainage swale within this site is not a conveyance
measure is instead act as a detention storage measure.
Resolved
63 1 CrossRoad
Engineers
Willie Hall
7/18/23 4:28 PM
Comment
Drainage Report 305.02 & 305.05 All storm sewers, inlets, catch basins, and
street gutters shall accommodate, subject to the allowable spread provisions,
as a minimum, peak runoff from a 10-year return frequency storm calculated
based on methodology described in Section 201.02. Most of the sag inlets in
the in the proposed roadway exceed the allowable spread. Please revise.
Responded by: Ben Bemis - 2/22/24 7:00 PM
The plans have been revised and the calculations have
been updated to show at least 10' of available drive lane
width.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/11/23 5:36 PM
Based on the ponding depth of most of the road inlets,
a 10' lane will not be provided in a 10 year event. For
example, the spread for 220 would be 8' and 221 would
be 12', leaving only 8' of travel lane vs the required 10'.
In some cases it appears that the ponding would
overtop the crown of the road as well which will not be
acceptable. Please revise.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:16 AM
Gutter spread calculations have been added to the
report
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
64 1 CrossRoad
Engineers
Willie Hall
7/18/23 4:34 PM
Comment
Drainage Report C3.3 Exhibit Please clarify how the "Greenspace" in the
southwest corner of the site will be routed to the detention. It is not labeled
as a future development area and there is no inlet connecting the low point
to the site infrastructure.
Responded by: Ben Bemis - 3/24/24 12:36 PM
The Greenspace at the southwest corner has been
reconciled with the landscape plans. Berms are now
included to screen the dog park however the revised
swale and drainage pattern remain in place per the
recent submittal. Please see revised grading sheet C301.
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/15/24 2:33 PM
It appears that there are contours included in the
landscape plan that contradict the proposed grading
sheet. Please clarify.
----------------------------------------------------------
Responded by: Ben Bemis - 2/28/24 12:45 PM
The greenspace or dog park at the southwest corner of
the site has been re-graded to capture a portion of the
water and route it to the detention. The remainder will
direct discharge to the ROW. Updated plans and
calculations have been provided.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/11/23 5:44 PM
This comment was in reference to the green space in
the southwest corner of the site, just south of the
entrance drive. This has now been labeled as future
development with a stub for future connection but is
still hatched as proposed pervious area, please confirm
there are planned future improvements that will
eventually be routed to the pond and not to the existing
beehive in the R/W.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:17 AM
This area is planned to be completely planted with
native vegetation.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
65 1 CrossRoad
Engineers
Willie Hall
7/18/23 4:36 PM
Comment
Future outlot drainage The lowest point of the outlots is lower than the
stubout inverts. Please confirm that there are no concerns regarding routing
future drainage to the to the detention facility.
Responded by: Ben Bemis - 4/12/24 8:59 AM
The future outlots have been regraded to minimize
direct disharge until the lots can be fully developed.
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/27/24 11:10 AM
Engineering will require that Lot 1 be graded towards
the stubout manholes to minimize direct discharge in
the interim condition.
----------------------------------------------------------
Responded by: Ben Bemis - 3/23/24 9:37 AM
Structures have been added to the stub-outs.
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/15/24 2:07 PM
Per conversation with Engineering, these stubs will need
to have a structure at each end in the for of an end
section or an inlet and take in drainage in the interim
condition vs the future outlet direct discharging to the
right of way.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:17 AM
Due to site constraints, the storm sewer stubs are as low
as reasonably possible. The proposed storm sewer
system is sized to convey the future outlot
developments.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
66 1 CrossRoad
Engineers
Willie Hall
7/18/23 4:42 PM
Comment
Drainage Report Mechanical Units The 10-yr online flow rates exceed the
allowable for the selected units. Please upsize water quality units or move
them offline.
Responded by: Ben Bemis - 3/23/24 9:56 AM
The calculations and details have been updated to show
the correct inverts. Please see Appendix I and sheet
C805
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/15/24 2:45 PM
The calculated depths in Appendix I do not match
inverts on details and structure data table. Please revise
----------------------------------------------------------
Responded by: Ben Bemis - 2/22/24 7:05 PM
The diversion details can be found on sheet C805.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/12/23 8:24 AM
Please provide diversion structure details in the plans
and diversion weir calculations in the drainage report.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:18 AM
The drainage plans have been revised to bypass online
flow.
Resolved
67 1 CrossRoad
Engineers
Willie Hall
7/18/23 4:56 PM
Comment
Drainage Report Detention Pond BMPs Please provide calculations showing
that the water quality volume is detained for at least 12 hours but no longer
than 48 hours. Please confirm that the permanent pool volume is 3 times the
WQv.
Responded by: Ben Bemis - 2/23/24 7:26 PM
Per the Hydrograph table in Appendix F the WQv is
released after 14 hrs.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/12/23 8:27 AM
Please provide a hydrocad output that shows that the
WQv is released in no less than 12 hours.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:18 AM
WQ calculations have been added to the drainage
report to show the normal pool volume is at least 3x the
required amount.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
68 1 CrossRoad
Engineers
Willie Hall
7/18/23 5:09 PM
Changemark
102.02.vii
Please include utility crossings on the storm plan and profiles.
C409 STORM PROFILES.pdf Responded by: Ben Bemis - 10/6/23 9:20 AM
Utility crossings have been added to the profiles.
Resolved
69 1 Engineering
Alex Jordan
7/19/23 8:58 AM
Changemark
Please include the native vegetation in this section
311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/22/24 7:05 PM
This section has been updated to include information
about the native vegetation.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/23/23 3:01 PM
The wet pond section on this sheet still does not
reference the proposed native vegetation on the banks
or shelf. Please revise.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:27 AM
This has been added to the O+M manual.
Resolved
70 1 Engineering
Alex Jordan
7/19/23 8:58 AM
Changemark
Please provide an item for the native vegetation in this checklist
311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/22/24 7:06 PM
The checklists have been updated to include
information about the native vegetation.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/23/23 3:02 PM
It does not appear that a native vegetation checklist
item was added for the pond or swale. Please revise.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:27 AM
This has been added to the O+M manual.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
71 1 Engineering
Alex Jordan
7/19/23 8:58 AM
Changemark
If this will be a BMP, it will need to be placed in a BMP easement
311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/23/24 6:56 PM
The vegetated swale is now included in an easement.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/23/23 3:03 PM
The limits of the BMP easement do not contain the
vegetated swale. Please revise.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:27 AM
This has been added to the O+M manual.
Resolved
72 1 Engineering
Alex Jordan
7/19/23 8:58 AM
Changemark
Please revise this call out to be for the native vegetation
Please also provide a hatching for this vegetation
311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/23/24 6:56 PM
The native planting vegetation has been added to the
BMP map.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/23/23 3:05 PM
This was not included, please revise.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:27 AM
This has been added to the O+M manual.
Resolved
73 1 Engineering
Alex Jordan
7/19/23 8:58 AM
Changemark
Are aerator proposed in the pond?
If so, please provide details in the O&M and plans and list in the SWPPP
narrative.
311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/28/24 12:51 PM
Aerator cut sheets were added to sheet C814 and the
O&M manual. It was also called out in the SWPPP
narrative.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/23/23 3:05 PM
These need to be called out and details need to be
provided in the O&M.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:28 AM
Aerators are planned. Notes and details have been
added to the SWPPP sheets.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
74 1 Engineering
Alex Jordan
7/19/23 8:58 AM
Changemark
Please label the protective signage on this
311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/23/24 6:58 PM
Protective signage labels have been added to the BMP
map.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/23/23 3:05 PM
This was not included, please revise.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:28 AM
This has been added to the O+M manual.
Resolved
75 1 Engineering
Alex Jordan
7/19/23 9:01 AM
Changemark
Please show the native vegetation limits and protective signage on the cross-
section
311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/23/24 7:10 PM
The vegetation limits and signage has been added to
the detail.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/23/23 3:09 PM
This was not included, please revise.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:28 AM
This has been added to the O+M manual.
Resolved
76 1 Engineering
Alex Jordan
7/19/23 9:02 AM
Changemark
Please provide a detail for the protective signage
311-804-O&M Manual.pdf Responded by: Ben Bemis - 10/6/23 9:28 AM
This has been added to the O+M manual.
Resolved
77 1 Engineering
Alex Jordan
7/19/23 9:04 AM
Changemark
Please list the native vegetation in this section
311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/22/24 7:12 PM
This section has been updated to include information
about the native vegetation.
----------------------------------------------------------
Reviewer Response: Alex Jordan - 10/23/23 3:09 PM
This was not included, please revise.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:28 AM
This has been added to the O+M manual.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
78 1 TriCo Regional
Sewer Utility
Ryan Hartman
7/19/23 11:52 AM
Comment
TriCo performed our review and sent comments to CEC on 7/19
Responded by: Ben Bemis - 2/28/24 1:19 PM
TriCo Comments have been addressed and returned to
TriCo.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 4:38 PM
Comments have been addressed. Please see updated
plan sheets.
Resolved
79 1 CrossRoad
Engineers
Willie Hall
7/20/23 9:36 AM
Changemark
303.07
Please revise grading so that the garages are not flooded during the clogged
scenario.
C408 FLOOD ROUTING PLAN.pdf Responded by: Ben Bemis - 4/12/24 9:01 AM
The grading has been revised and the flood routing
plan has been updated.
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/27/24 11:10 AM
This comment to remain unresolved until flood routing
is accurate per Ref.# 133.
----------------------------------------------------------
Responded by: Ben Bemis - 3/23/24 10:14 AM
A waiver has been submitted for this requirement.
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/15/24 2:49 PM
MFPGs still exceed FFEs for all buildings except 7,9, &
11.
----------------------------------------------------------
Responded by: Ben Bemis - 2/22/24 7:36 PM
The FFE has been added to the flood routing plan.
----------------------------------------------------------
Reviewer Response: Willie Hall - 10/12/23 8:33 AM
The garage bays still appear to be flooded. Please
provide FFE for the garage to confirm no flooding.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:20 AM
The grading around the garages have been revised.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
80 1 Planning & Zoning
Alexia Lopez
7/30/23 9:55 PM
Changemark
Label Setback lines
Label the setback lines on C201 through C207
Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:29 AM
These have been labeled in the layout plans.
Resolved
81 1 Planning & Zoning
Alexia Lopez
7/30/23 9:56 PM
Changemark
Label Property Line
Please label the property line on the site plan sheets or put in in the legend.
Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:29 AM
These have been labeled in the layout plans.
Resolved
82 1 Planning & Zoning
Alexia Lopez
7/30/23 9:57 PM
Changemark
Label ROW
Label the ROW on the north part of the north south road on sheet C 201
Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:29 AM
This will be labeled in the layout plans.
Resolved
83 1 Planning & Zoning
Alexia Lopez
7/30/23 9:58 PM
Changemark
Private Drives
Can you label the private drives so it is clear it is not ROW.
Site Plans C201.pdf Responded by: Ben Bemis - 2/28/24 12:52 PM
The private drives were labeled on sheet C201 and other
site plans.
----------------------------------------------------------
Reviewer Response: Alexia Lopez - 12/7/23 5:00 PM
What are the layout plans? What sheet number is that?
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:29 AM
These have been labeled in the layout plans.
Resolved
84 1 Planning & Zoning
Alexia Lopez
7/30/23 10:00 PM
Changemark
Lot 1 south setback front yard
I believe the south setback line for Lot 1 is a front yard since it is adjacent to
a public road. Per B-3 this should be 60 ft. Please adjust the plans.
Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:29 AM
This road is intended to be private.
Resolved
85 1 Planning & Zoning
Alexia Lopez
7/30/23 10:01 PM
Changemark
Label Open Space on Site Plans
Please label this area south of Lot 1 as Open Space to reduce confusion.
Site Plans C201.pdf Responded by: Ben Bemis - 2/28/24 1:06 PM
This area is now labeled as a Dog Park.
----------------------------------------------------------
Reviewer Response: Alexia Lopez - 12/7/23 5:09 PM
What are the Layout plans? What sheet number is that.
Please label it on the site plans as well.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:29 AM
These have been labeled in the layout plans.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
86 1 Planning & Zoning
Alexia Lopez
7/30/23 10:03 PM
Changemark
Show Setback line for Lot 2
Show the front yard setback line for this building on Lot 2 since it is along a
public ROW. For B-3 I believe this should be 30 ft.
Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:30 AM
This road is intended to be private.
Resolved
87 1 Planning & Zoning
Alexia Lopez
7/30/23 10:05 PM
Changemark
Add grass area
Please make this area grass between the sidewalk and the drive in front of
the building entrances. Please make this change to all buildings. Then you
could also add a tree here.
Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:30 AM
Grass areas have been added to the driveways.
Resolved
88 1 Planning & Zoning
Alexia Lopez
7/30/23 10:07 PM
Changemark
Grass area between driveways
Can you make a grass area or landscape area between driveways instead of
all being concrete?
Site Plans C201.pdf Responded by: Ben Bemis - 10/6/23 9:30 AM
Grass areas have been added to the driveways.
Resolved
89 1 Planning & Zoning
Alexia Lopez
7/30/23 10:11 PM
Changemark
Add Building Numbers to Site Plans
Please assign a building number for each apartment building and add the
building numbers to the site plans.
Site Plans C201.pdf Responded by: Ben Bemis - 2/28/24 12:54 PM
Building 11 was labeled on sheet C201.
----------------------------------------------------------
Reviewer Response: Alexia Lopez - 12/7/23 5:13 PM
I did not see a building number on Sheet C 201
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:30 AM
Building numbers have been added to the plans.
Resolved
90 1 Planning & Zoning
Alexia Lopez
7/30/23 10:19 PM
Library Comment
Submit a copy of the Adjoining Property Owners List from Hamilton County.
Responded by: Rick Lawrence - 8/8/23 8:11 PM
See uploaded proof of service package
Resolved
91 1 Planning & Zoning
Alexia Lopez
7/30/23 10:19 PM
Library Comment
Provide the filled out and notarized affidavit of notice of public hearing page
of the application.
Responded by: Rick Lawrence - 8/8/23 8:11 PM
See uploaded proof of service package
Resolved
92 1 Planning & Zoning
Alexia Lopez
7/30/23 10:19 PM
Library Comment
Provide the filled out Notice of Public Hearing page of the application.
Responded by: Rick Lawrence - 8/8/23 8:11 PM
See uploaded proof of service package
Resolved
93 1 Planning & Zoning
Alexia Lopez
7/30/23 10:19 PM
Library Comment
Submit Proof of Publication from the newspaper.
Responded by: Rick Lawrence - 8/8/23 8:11 PM
See uploaded proof of service package
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
94 1 Planning & Zoning
Alexia Lopez
7/30/23 10:19 PM
Library Comment
Submit Certificate of Mailing for proof of mailing.
Responded by: Rick Lawrence - 8/8/23 8:11 PM
See uploaded proof of service package
Resolved
95 1 Planning & Zoning
Alexia Lopez
7/30/23 10:19 PM
Library Comment
Submit a copy of the Sign Affidavit.
Responded by: Rick Lawrence - 8/8/23 8:11 PM
See uploaded proof of service package
Resolved
96 1 Planning & Zoning
Alexia Lopez
7/30/23 10:20 PM
Library Comment
Submit a copy of the Adjoining Property Owners List from Hamilton County.
Responded by: Rick Lawrence - 8/8/23 8:11 PM
See uploaded proof of service package
Resolved
97 1 Planning & Zoning
Alexia Lopez
7/30/23 10:20 PM
Library Comment
Provide the filled out and notarized affidavit of notice of public hearing page
of the application.
Responded by: Rick Lawrence - 8/8/23 8:11 PM
See uploaded proof of service package
Resolved
98 1 Planning & Zoning
Alexia Lopez
7/30/23 10:20 PM
Library Comment
Provide the filled out Notice of Public Hearing page of the application.
Responded by: Rick Lawrence - 8/8/23 8:11 PM
See uploaded proof of service package
Resolved
99 1 Planning & Zoning
Alexia Lopez
7/30/23 10:20 PM
Library Comment
Submit Proof of Publication from the newspaper.
Responded by: Rick Lawrence - 8/8/23 8:11 PM
See uploaded proof of service package
Resolved
100 1 Planning & Zoning
Alexia Lopez
7/30/23 10:20 PM
Library Comment
Submit Certificate of Mailing for proof of mailing.
Responded by: Rick Lawrence - 8/8/23 8:11 PM
See uploaded proof of service package
Resolved
101 1 Planning & Zoning
Alexia Lopez
7/30/23 10:20 PM
Library Comment
Submit a copy of the Sign Affidavit.
Responded by: Rick Lawrence - 8/8/23 8:12 PM
See uploaded proof of service package
Resolved
102 1 Planning & Zoning
Alexia Lopez
7/30/23 10:37 PM
Library Comment
Please list what green or sustainable site or building design aspects will
implemented, similar to the LEED checklist: www.usgbc.org/leed/rating-
systems from the US Green Building Council. (This is not a requirement, but
the Commission looks favorably upon this.)
Responded by: Rick Lawrence - 10/2/23 5:08 PM
See residential committee brochure
Resolved
103 1 Planning & Zoning
Alexia Lopez
7/30/23 10:53 PM
Changemark
Label this area
Please label this area. Is it fenced in?
Site Plans C203.pdf Responded by: Ben Bemis - 10/6/23 9:30 AM
This area has been labeled.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
104 1 Planning & Zoning
Alexia Lopez
7/30/23 10:53 PM
Changemark
Parallel Parking
Could you move this building south a little and add some parallel parking
spaces? Please look at other areas around the site where you might be able
to add some parallel spaces.
Site Plans C203.pdf Responded by: Ben Bemis - 10/6/23 9:31 AM
Parking spaces have been added to the site plans and
the number of residential units has been reduced.
Therefore the unit/parking space ratio has been
improved for the overall site.
Resolved
105 1 Planning & Zoning
Alexia Lopez
7/30/23 10:53 PM
Changemark
Label this space
Please label this area. Are these garages?
Site Plans C203.pdf Responded by: Ben Bemis - 10/6/23 9:32 AM
These have been labeled in the layout plans.
Resolved
106 1 Planning & Zoning
Alexia Lopez
7/30/23 10:53 PM
Changemark
Fence Height
Will this fence be 6 ft. or 8 ft. Or does the height change around the site?
The legend says 6 ft. but sheet C207 says 8 ft.
Site Plans C203.pdf Responded by: Ben Bemis - 10/6/23 9:32 AM
The perimeter fence is planned to be 8-ft.
----------------------------------------------------------
Responded by: Rick Lawrence - 8/8/23 8:12 PM
The fence is 8 feet high throughout the site
Resolved
107 1 Planning & Zoning
Alexia Lopez
7/30/23 10:53 PM
Changemark
Fence Drawings
Please submit drawings of the design of the fence.
Site Plans C203.pdf Responded by: Ben Bemis - 2/28/24 12:54 PM
Fence details have been uploaded, please reference
sheets L502 and L503.
----------------------------------------------------------
Reviewer Response: Alexia Lopez - 12/7/23 5:19 PM
Please upload the details for the fence design so that I
can stamp it approved.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:33 AM
Details will be added to the plans.
----------------------------------------------------------
Responded by: Rick Lawrence - 8/8/23 8:13 PM
See uploaded drawings of the fence
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
108 1 Planning & Zoning
Alexia Lopez
7/30/23 10:53 PM
Changemark
Perpendicular Parking
Could you add some perpendicular parking spaces in this area?
Site Plans C203.pdf Responded by: Ben Bemis - 10/6/23 9:32 AM
Parking spaces have been added to the site plans and
the number of residential units has been reduced.
Therefore the unit/parking space ratio has been
improved for the overall site.
Resolved
109 1 Planning & Zoning
Alexia Lopez
7/30/23 10:59 PM
Changemark
Label this area
Is this an amenity area?
Site Plans C202.pdf Responded by: Ben Bemis - 10/6/23 9:33 AM
The amenity area has been updated.
Resolved
110 1 Planning & Zoning
Alexia Lopez
7/30/23 10:59 PM
Changemark
Label setback lines
Please label these dashed lines.
Site Plans C202.pdf Responded by: Ben Bemis - 2/28/24 1:02 PM
The dashed lines were added to the legend on the site
plans.
----------------------------------------------------------
Reviewer Response: Alexia Lopez - 12/8/23 3:55 PM
I do not see this labeled or provided in the Legend on
this sheet. Please revise so that it is clear when looking
at each sheet and one doesn't have to flip between
different pages to find labels.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:33 AM
These have been labeled in the layout plans.
Resolved
111 1 Planning & Zoning
Alexia Lopez
7/30/23 11:02 PM
Changemark
Parallel Parking
Please look into adding some parallel spots along this side of the road. It
may help reduce the amount of your variance request and it helps calm
traffic. But keep the tree lawn between the sidewalk and the parking.
Site Plans C202.pdf Responded by: Ben Bemis - 10/6/23 9:32 AM
Parking spaces have been added to the site plans and
the number of residential units has been reduced.
Therefore the unit/parking space ratio has been
improved for the overall site.
Resolved
112 1 Planning & Zoning
Alexia Lopez
7/30/23 11:10 PM
Changemark
Label Dotted setback line
Please make sure these meets the UDO standards for a front setback line
since it is adjacent to a public street.
Site Plans C204.pdf Responded by: Ben Bemis - 10/6/23 9:33 AM
The roads are intended to be private.
Resolved
113 1 Planning & Zoning
Alexia Lopez
7/30/23 11:10 PM
Changemark
Label this as ROW
Label this as public ROW if it is.
Site Plans C204.pdf Responded by: Ben Bemis - 10/6/23 9:33 AM
The roads are intended to be private.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
114 1 Planning & Zoning
Alexia Lopez
7/30/23 11:10 PM
Changemark
Dashed lines to pond
What are these dashed lines leading to the pond? Please label.
Site Plans C204.pdf Responded by: Ben Bemis - 10/6/23 9:33 AM
This is the BMP/Drainage easement limit. A label has
been added to clarify this.
Resolved
115 1 Planning & Zoning
Alexia Lopez
7/30/23 11:10 PM
Changemark
Label this dashed line in the pond.
Please label this dashed line,
Site Plans C204.pdf Responded by: Ben Bemis - 2/28/24 1:03 PM
The pond normal pool line was added to the legend in
the site plans.
----------------------------------------------------------
Reviewer Response: Alexia Lopez - 12/8/23 4:01 PM
Thank you, but I still did not see a label on this sheet.
Please either label the dashed line or add it to the
Legend.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:33 AM
This dashed line is the limit of the 'normal pool' of the
pond.
Resolved
116 1 Planning & Zoning
Alexia Lopez
7/30/23 11:10 PM
Changemark
Pool Label
Is this the pool? Please label.
Site Plans C204.pdf Responded by: Ben Bemis - 10/6/23 9:33 AM
The pool area has been updated with detail.
Resolved
117 1 Planning & Zoning
Alexia Lopez
7/31/23 11:24 PM
Changemark
Label Bubble Line
Please label this bubble line on all sheets. Is this tree preservation?
Site Plans C206.pdf Responded by: Ben Bemis - 2/28/24 1:04 PM
The post construction tree line was added to the site
plan legend.
----------------------------------------------------------
Reviewer Response: Alexia Lopez - 12/8/23 4:05 PM
Thank you for the response but please provide this label
in the Legend so anyone reading these plans knows
what it is.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:34 AM
This is the limit of the tree line post construction.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
118 1 Hamilton County
Surveyor
Samuel Clark
8/1/23 10:51 AM
Comment
This lot is located outside of a Hamilton County watershed. Therefore, no
permitting from our office will be needed.
Responded by: Ben Bemis - 4/12/24 9:02 AM
Please change status to 'Resolved'
----------------------------------------------------------
Responded by: Ben Bemis - 3/23/24 10:22 AM
Comment noted. Please change to 'Resolved'.
----------------------------------------------------------
Responded by: Ben Bemis - 2/22/24 7:37 PM
Comment noted.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:29 AM
Comment noted.
Info Only
119 1 Planning & Zoning
Alexia Lopez
8/7/23 5:20 PM
Changemark
Color Elevations do not match black and white
These color elevations do not appear to match the black and white
elevations. Such as as the window placement and window headers. Please
upload the correct color elevations for the next submittal.
23-05-26 REI - Edge Color
Elevations.pdf
Responded by: Rick Lawrence - 8/8/23 8:13 PM
Revised elevations are uploaded to correspond between
the color and black and white.
Resolved
120 1 Planning & Zoning
Alexia Lopez
8/7/23 5:20 PM
Changemark
Percent Siding
What percent of the non-window facade area is siding? The UDO limits this
material to 10 percent.
23-05-26 REI - Edge Exterior
Elevations.pdf
Responded by: Rick Lawrence - 8/8/23 8:13 PM
The blank and white elevations note that the siding
material on all buildings is 10%.
Resolved
121 1 Planning & Zoning
Alexia Lopez
8/8/23 10:26 AM
Library Comment
Please submit an exhibit of the proposed black lined site plan overlaid upon
a current aerial photo of the immediate area.
Responded by: Ben Bemis - 2/28/24 1:04 PM
An site plan aerial overlay exhibit was added to the
correspondence folder in ProjectDox.
----------------------------------------------------------
Responded by: Ben Bemis - 10/6/23 9:34 AM
This will be included with the resubmittal.
Resolved
122 1 Planning & Zoning
Alexia Lopez
8/8/23 10:34 AM
Changemark
Property Line on Lighting Plan
Please clear show and label the property line on the lighting plan.
THE EDGE Photometrics 2023-05-
22.pdf
Responded by: Ben Bemis - 10/6/23 4:39 PM
Property line is shown and labeled. See updated
photometrics plan.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
123 1 Planning & Zoning
Alexia Lopez
8/8/23 10:34 AM
Changemark
Lighting Levels on northeast boundary
These lighting levels appear to be over the allowed 0.1 foot-candles at the
property line. Please make changes to lower the foot candles at the property
line.
THE EDGE Photometrics 2023-05-
22.pdf
Responded by: Ben Bemis - 10/6/23 4:39 PM
The lighting levels have been revised. Please see
updated Photometrics plan.
Resolved
124 2 Urban Forestry
Daren Mindham
10/12/23 10:59 AM
Changemark
wording to add
Please add a note to this area, that if any existing evergreen trees are not
sufficiently screening per the Urban Forester, that any gaps will need to be
filled per the bufferyard requirements.
L100 Altum Landscape Plan-L101.pdf Responded by: Ben Bemis - 2/28/24 1:08 PM
A note has been added, please see the updated L101
sheet.
Resolved
125 2 TriCo Regional
Sewer Utility
Ryan Hartman
10/19/23 3:54 PM
Comment
TriCo performed our review and sent comments to CEC on 10/19
Responded by: Ben Bemis - 2/28/24 1:15 PM
TriCo Comments have been addressed and returned to
TriCo.
Resolved
126 2 Carmel Water
Operations
Steve Cook
10/20/23 8:27 AM
Changemark
Changemark note #01
please contact to schedule an in person review of drawings Steve Cook 317-
733-2849 scook@carmel.in.gov
C500 OVERALL UTILITY PLAN.pdf Responded by: Ben Bemis - 2/28/24 12:40 PM
We met in person with Steve Cook and John Duffy
regarding the water on November 9th, 2023.
Resolved
127 2 Engineering
Alex Jordan
10/23/23 3:06 PM
Changemark
The earlier sheets in this manual call for an XC-9 and XC-10
Please clarify if two XC-9's are planned or if a 9 and 10 will be installed.
311-804-O&M Manual.pdf Responded by: Ben Bemis - 2/22/24 7:44 PM
(1) XC-9 & (1) XC-10 are planned. The O&M manual has
been revised to clarify this.
Resolved
128 2 Planning & Zoning
Alexia Lopez
12/11/23 2:17 PM
Changemark
HVAC Units Bldg 10
Please move some of these units to the southside of the sidewalk so they
aren't so close to the street and sidewalk on the north side. This was
discussed and agreed to via email. Refer to email sent to Ryan Wells on 9-18
-23
Site Plans C202.pdf Responded by: Ben Bemis - 2/28/24 1:17 PM
The HVAC units have been shifted to the southside of
the sidewalk. See updated sheet C202.
Resolved
129 2 Planning & Zoning
Alexia Lopez
12/11/23 3:35 PM
Changemark
Update Pedestrian Plan
Please update the pedestrian plan with the most recent site layout.
Site Plans C207.pdf Responded by: Ben Bemis - 2/28/24 1:17 PM
The pedestrian plan has been updated with the new site
layout and was uploaded to ProjectDox.
Resolved
130 3 Engineering
Alex Jordan
3/13/24 10:30 AM
Changemark
Will inline or offline units be used on the project?
Both the plans and O&M provide details for inline units but offline units are
shown in the plans and O&M site map. Please clarify which configuration will
be used and revise the details or plans/site map accordingly.
C805 STORMWATER DETAILS.pdf Responded by: Ben Bemis - 3/23/24 10:20 AM
The XC-units can be used in inline/offline configurations
interchangeably. The "Inline" designation on the detail
titles has been removed to avoid confusion.
Resolved
Plan Review - Review Comments Report
Project Name: PZ-2023-00136 DP ADLS The Edge at West Carmel
Workflow Started: 6/21/2023 10:19:13 AM
Report Generated: 04/24/2024 03:59 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
131 3 Engineering
Alex Jordan
3/13/24 2:36 PM
Changemark
Please clarify that the easements over the pond and vegetated swale are also
BMP easements
I was unable to locate a call out for the easements over these two items.
C900 STORMWATER POLLUTION
PREVENTION PLAN.pdf
Responded by: Ben Bemis - 3/23/24 10:21 AM
Notes have been added to the SWPP Plan to clarify that
these easements are for BMP accessibility.
Resolved
132 3 Planning & Zoning
Alexia Lopez
3/15/24 2:01 PM
Changemark
Tree Preservation
Can you please make a note or clearly show which trees will be preserved.
This Demolition Item 25 reads as though all of this area will be removed. We
want to make it clear on all the plans, including the demo plans, that the
trees that were agreed to be preserved are preserved.
C101 DEMOLITION PLAN.pdf Responded by: Ben Bemis - 3/24/24 12:34 PM
Notes and trees have been added to the demolition
plan for clarification to the contractor. See updated
sheet C101.
Resolved
133 3 CrossRoad
Engineers
Willie Hall
3/15/24 2:58 PM
Changemark
Grading around buildings
Grading between walk and buildings indicate that drainage is being routed
towards the building. Please revise grading or accurately show on flood
routing sheet.
C304 GRADING PLAN - AREA D.pdf Responded by: Ben Bemis - 4/12/24 9:02 AM
The grading has been revised and the flood routing
plan has been updated.
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/27/24 10:47 AM
This comment also applies to the buildings in Areas A,
B, C, E, & F.
The flood routing sheet still needs to be updated to
include all of the depressional landscape areas
containing yard inlets where water would stage in a fully
clogged scenario.
----------------------------------------------------------
Responded by: Ben Bemis - 3/24/24 12:33 PM
The grading around the building in Area D was revised
to allow positive drainage away from the building. See
update sheet C304.
Resolved
134 4 Engineering
Alex Jordan
4/4/24 11:11 AM
Comment
We have no further comments on plans. Before we can issue a stormwater
management permit, the following will need to be provided: 1. A signed and
recorded O&M manual 2. A non-expiring erosion control performance bond
for 100% of the approved estimate 3. A completed BMP easement
agreement with exhibits and legal description (template uploaded to the
drainage document folder)
Info Only
NET
&
Frankenberger LLC
Attorneys at Law
550 Congressional Blvd., Suite 210, Carmel, Indiana 46032 317-844-0106
JAMES E. SHINAVER JON C. DOBOSIEWICZ
LAWRENCE J.KEMPER' Land Use Professional
JOHN B. FLATT•
FREDRIC LAWRENCE
VALERIE L.MATHEIS** *Also licensed in Kentucky
JANE B.MERRILL—Of Counsel **Also licensed in Illinois
FRED PFENNINGER —Of Counsel
Via Hand Delivery
October 6, 2023
City of Carmel
Attn: Alexia Lopez
One Civic Square Q�� U
Carmel, IN 46032 2023
Re: REI Real Estate Investment, LLC
The Edge at West Carmel DP/ADLS and Variances Request
Docket Nos.PZ-2023-00136 DP/ADLS,PZ-2023-00157 V,PZ-2023-00158 V,PZ-2023-
00159 V,PZ-2023-00160 V,PZ-2023-00161 V,AND PZ-2023-00162 V
Dear Alexia:
Enclosed please find nine (9) copies of the brochures for distribution to the Plan Commission
members for the October 17th meeting, as well as a flash drive that contains a digital copy of the
brochure.
Also included on the flash drive is a copy of the proof of noticing.
Thanks for your assistance in this matter and should you have any questions please do not
hesitate to contact me.
Very truly yours,
NELSON &FRANKENBERGER, LLC
Jon C. Dobosiewicz
Land Use Professional
Enclosures
Nelson &
i,`
Frankenberger, LLC
Attorneys at Law
550 Congressional Blvd.. Suite 210, Carmel, Indiana 46032 317-844-0106
JAMES E. SHINAVER JON C. DOBOSIEWICZ
LAWRENCE J. KEMPER` Land Use Professional
JOHN B.FLATT* r
FREDRIC LAWRENCE VALERIE VALERIE L.MATHEIS** � �
W *Also licensed in Kentucky
JANE B.MERRILL—Of Counsel cp **Also licensed in Illinois
FRED PFENNINGER —Of Counsel Cr 2023
BY:
Via Hand Delivery . ..
September 22, 2023
City of Carmel
Attn: Alexia Lopez
One Civic Square
Carmel, IN 46032
Re: REI Real Estate Investment, LLC
The Edge at West Carmel DP/ADLS and Variances Request
Docket Nos. PZ-2023-00136 DP/ADLS,PZ-2023-00157 V,PZ-2023-00158 V,PZ-2023-
00159 V,PZ-2023-00160 V,PZ-2023-00161 V,AND PZ-2023-00162 V
Dear Alexia:
Enclosed please find six (6) copies of the brochures for distribution to the Plan Commission
members for the October 3rd meeting, as well as a flash drive that contains a digital copy of the
brochure.
Also included on the flash drive is a copy of the proof of noticing.
Thanks for your assistance in this matter and should you have any questions please do not
hesitate to contact me.
Very truly yours,
NELSON & FRANKENBERGER, LLC
Jon C. Dobosiewicz
Land Use Professional
Enclosures
i\F Nelson &
Frarikenberger, LLCLin-6L"Attorneys at Law
550 Congressional Blvd., Suite 210, Carmel, Indiana 46032 317-844-0106
JAMES E.SHINAVER JON C.DOBOSIEWICZ
LAWRENCE J.KEMPER* Land Use Professional
JOHN B.FLATT*
FREDRIC LAWRENCE
VALERIE L.MATHEIS** *Also licensed in Kentucky
JANE B.MERRILL—Of Counsel **Also licensed in Illinois
FRED PFENNINGER —Of Counsel
Via Hand Delivery
R7'cEIVED
August 4, 2023
City of Carmel
O
Attn: Alexia Lopez BY:.....
......................
One Civic Square
Carmel, IN 46032
Re: REI Real Estate Investment, LLC
The Edge at West Carmel DP/ADLS and Variances Request
Docket Nos.PZ-2023-00136 DP/ADLS,PZ-2023-00157 V,PZ-2023-00158 V,PZ-2023-
00159 V,PZ-2023-00160 V,PZ-2023-00161 V,AND PZ-2023-00162 V
Dear Alexia:
Enclosed please find nine (9) copies of the brochures for distribution to the Plan Commission
members for the April 19th meeting, as well as a flash drive that contains a digital copy of the
brochure.
Also included on the flash drive is a copy of the proof of noticing.
Thanks for your assistance in this matter and should you have any questions please do not
hesitate to contact me.
Very truly yours,
NELSON& FRANKENBERGER, LLC
Jon C. Dobosiewicz