HomeMy WebLinkAboutPreliminary site plan study Pickle Ball9
8 8
5
10
12
129 6
10
10
6
4
6
C101A
JOB#: SCB.002SITE PLANDATE: 11/06/20DRAWN BY: RCW (317) 251-1738 (FAX) 251-1923INDIANAPOLIS, INDIANA 462206555 CARROLLTON AVENUEwww.rw-engineering.comCIVIL ENGINEERS - LAND SURVEYORS - DEVELOPMENT CONSULTANTS11585 N. PENNSYLVANIA STREETPENNWOOD PROFESSIONALCARMEL, INDIANA 19OFFICE PARKW
DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL
BE RESTORED/REPAIRED TO THE SATISFACTION
OF THE CITY AT THE COMPLETION OF THE
PROJECT. THE CONTRACTOR IS ENCOURAGED
TO INSPECT THE RIGHT-OF-WAY WITH THE CITY
PRIOR TO THE START OF THE CONSTRUCTION
TO DOCUMENT THE EXISTING CONDITION OF THE
RIGHT-OF-WAY.
BUILDING GROSS SQUARE FOOTAGE = 27,248 SF
SITE AREA = 3.77 AC+/-
ZONING = B-5
FRONT SETBACK = 15 FT
SIDE SETBACK = 10 FT
REAR SETBACK = 30 FT
% LOT COVERAGE = 2.23/ 3.77 = 59.2%
ON-SITE PARKING REQUIRED:
1 SPACE PER 250 SF OF FLOOR AREA
FLOOR AREA = 27,248 / 250 = 109 SPACES REQ'D
ON-SITE PARKING PROVIDED:
STANDARD SPACES = 109
ACCESSIBLE SPACES = 6
TOTAL: 115 SPACES PROVIDED
DEVELOPMENT SUMMARY