Loading...
HomeMy WebLinkAboutPreliminary site plan study Pickle Ball9 8 8 5 10 12 129 6 10 10 6 4 6 C101A JOB#: SCB.002SITE PLANDATE: 11/06/20DRAWN BY: RCW (317) 251-1738 (FAX) 251-1923INDIANAPOLIS, INDIANA 462206555 CARROLLTON AVENUEwww.rw-engineering.comCIVIL ENGINEERS - LAND SURVEYORS - DEVELOPMENT CONSULTANTS11585 N. PENNSYLVANIA STREETPENNWOOD PROFESSIONALCARMEL, INDIANA 19OFFICE PARKW DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF THE CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. BUILDING GROSS SQUARE FOOTAGE = 27,248 SF SITE AREA = 3.77 AC+/- ZONING = B-5 FRONT SETBACK = 15 FT SIDE SETBACK = 10 FT REAR SETBACK = 30 FT % LOT COVERAGE = 2.23/ 3.77 = 59.2% ON-SITE PARKING REQUIRED: 1 SPACE PER 250 SF OF FLOOR AREA FLOOR AREA = 27,248 / 250 = 109 SPACES REQ'D ON-SITE PARKING PROVIDED: STANDARD SPACES = 109 ACCESSIBLE SPACES = 6 TOTAL: 115 SPACES PROVIDED DEVELOPMENT SUMMARY