HomeMy WebLinkAboutRepublic_Training-ARCH-V21 - Sheet - A-105 - HIGH ROOF PLANA. THESE GENERAL NOTES APPLY TO ROOF DRAWINGS. B. VERIFY SIZE, LOCATION AND NUMBER OF ROOF PENETRATIONS INCLUDING VENTS, PIPES, CURBS, ROOF DRAINS, CONDUITS, ETC. PROVIDE NEW FLASHING AND SEAL PENETRATIONS WHETHER OR NOT INDICATED ON THE DRAWINGS. C. COMPLETE WORK ABOVE ROOF, SUCH AS MASONRY, WELDING, MASONRY RESTORATION, ETC., PRIOR TO STARTING ROOFING WORK. D. VERIFY AND MAINTAIN ROOF SLOPES AND DRAINAGE PATTERNS. TEST FOR AND CORRECT ANY PONDING CONDITIONS. E. REPAIR AND REPLACE ROOFING SYSTEM OR STRUCTURE DAMAGED BY IMPROPER STORAGE, CONSTRUCTION ACTIVITIES, OR LACK OF ADEQUATE TEMPORARY PROTECTION. THIS ALSO INCLUDES INTERIOR DAMAGE TO FINISHES, EQUIPMENT, FURNISHINGS, ETC., RESULTING FROM LEAKS. F. NEW BLOCKING SHALL BE PRESERVATIVE-TREATED WOOD. G. PAINT EXTERIOR LADDERS, BRACKETS, ETC., UNLESS NOTED OTHERWISE. H. CAP FASTENERS THAT PENETRATE ROOF DECK IN AREAS NOT CONCEALED BY CEILINGS WITH WIRE NUTS OR OTHER MEANS ACCEPTABLE TO ARCHITECT UNLESS OTHERWISE INDICATED. AREAS SUCH AS JANITOR CLOSETS, STORAGE ROOMS, MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, ETC., ARE EXEMPT FROM THIS REQUIREMENT UNLESS OTHERWISE INDICATED. I. REFER TO WALL SECTIONS NOTED ON ROOF PLANS FOR INFORMATION. J. REFER TO MECHANICAL DRAWINGS TO COORDINATE ROOF CONDUCTOR LOCATIONS. A. THESE GENERAL NOTES APPLY TO ROOF DRAWINGS. B. WORK SHOWN ON THE DRAWINGS SHALL BE BASE BID UNLESS SPECIFICALLY NOTED TO BE BY ALTERNATE BID. C. FIELD VERIFY CONDITIONS AND COORDINATE WITH APPROPRIATE TRADES PRIOR TO STARTING CONSTRUCTION. IF DISCREPANCIES ARE FOUND BETWEEN CONTRACT DOCUMENTS AND ACTUAL FIELD CONDITIONS, NOTIFY ARCHITECT IMMEDIATELY. D. PAINT EXTERIOR LADDERS, BRACKETS, ETC., UNLESS OTHERWISE INDICATED. E. PROTECT EXISTING SURFACES TO REMAIN IN AREAS ADJACENT TO DEMOLITION WORK. PROVIDE PLYWOOD PROTECTION OVER EXISTING ROOF MEMBRANE AS REQUIRED. F. REPAIR FINISHES AND SURFACES LEFT EXPOSED BY DEMOLITION OR REMOVAL OF EQUIPMENT USING NEW MATERIALS TO MATCH SURROUNDING SURFACES INCLUDING ROOF DECK, SUBSTRATE, BLOCKING, ETC. REPAIR EXISTING FINISHES TO CORRECT DEFECTS EITHER CAUSED OR EXPOSED BY DEMOLITION WORK OR EQUIPMENT REMOVAL INCLUDING MASONRY, SHEET METAL, ETC. AREAS NOTED ON THE DRAWINGS TO BE REPAIRED OR PATCHED ARE GIVEN FOR REFERENCE AND SHALL NOT BE INTERPRETED TO LIMIT THE SCOPE OF WORK. G. PATCH EXISTING CEILING AND ROOF CONSTRUCTION AT ABANDONED PENETRATION LOCATIONS WITH NEW MATERIALS AS REQUIRED TO RECEIVE NEW FINISHES AND TO MAINTAIN ORIGINAL FIRE RATING OF ASSEMBLY WHERE APPLICABLE. H. REFER TO WALL SECTIONS NOTED ON ROOF PLANS FOR ADDITIONAL DEMOLITION INFORMATION. I. SELECTIVE DEMOLITION, SUCH AS ROOF PENETRATIONS FOR INSTALLATION OF NEW MECHANICAL OR ELECTRICAL WORK, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE REQUIRING THE DEMOLITION. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION INFORMATION. J. REMOVE EXISTING GRAVEL BALLAST, ROOF MEMBRANE, INSULATION, THERMAL AND VAPOR BARRIERS, CANTS, FLASHING, COUNTERFLASHING AND COPING DOWN TO EXISTING STRUCTURAL ROOF DECK UNLESS NOTED OTHERWISE. PLACE NEW ROOFING SYSTEM DIRECTLY OVER EXISTING ROOF DECK. K. REMOVE EXISTING SHINGLES, UNDERLAYMENT, FLASHING, GUTTERS, AND INSULATION DOWN TO EXISTING STRUCTURAL ROOF DECK UNLESS NOTED OTHERWISE. PLACE NEW ROOFING SYSTEM DIRECTLY OVER EXISTING ROOF DECK. L. REMOVE EXISTING ASPHALT AND MASTIC MATERIAL FROM PARAPET WALLS AND SURROUNDING MATERIALS AS REQUIRED BY ROOF MEMBRANE SYSTEM MANUFACTURER'S WARRANTY. M. AT CONTRACTOR'S OPTION, REINSTALL EXISTING GRAVEL BALLAST IF TYPE AND SIZE IS APPROPRIATE, AND IF REUSE IS ALLOWED UNDER REQUIRED WARRANTY. DO NOT STORE BALLAST IN A MANNER THAT COULD CAUSE DAMAGE TO EXISTING STRUCTURE. PROPERLY DISPOSE OF UNUSED BALLAST OFF-SITE. N. IF EXISTING ITEMS TO BE REMOVED OR DISTURBED ARE SUSPECTED OR DISCOVERED TO CONTAIN ASBESTOS OR OTHER HAZARDOUS MATERIALS, STOP DEMOLITION AND NOTIFY OWNER AND ARCHITECT IMMEDIATELY. O. VERIFY SIZE, LOCATION AND NUMBER OF EXISTING ROOF PENETRATIONS INCLUDING VENTS, PIPES, CURBS, ROOF DRAINS, CONDUITS, ETC. PROVIDE NEW FLASHING AND SEAL EXISTING PENETRATIONS WHETHER OR NOT INDICATED ON THE DRAWINGS. P. COMPLETE WORK ABOVE ROOF, SUCH AS MASONRY WALL REPAIR, WELDING, REPOINTING, ETC., PRIOR TO STARTING RE-ROOFING WORK. Q. RAISE EXISTING ROOF CURBS AND PROVIDE ADDITIONAL BLOCKING FOR FANS, VENTS, INTAKES AND MECHANICAL EQUIPMENT AS REQUIRED BY NEW ROOF SYSTEM AND INSULATION THICKNESS. R. RAISE EXISTING ROOF DRAINS, OVERFLOW DRAINS AND SCUPPER OPENINGS AS REQUIRED BY NEW ROOF SYSTEM AND INSULATION THICKNESS. EXTEND DRAIN PIPING AND REINSULATE AS REQUIRED. S. PROVIDE NEW GRAVEL STOP AT EXTERIOR FASCIA CONDITIONS AS REQUIRED BY NEW ROOF SYSTEM AND INSULATION THICKNESS. T. REMOVE EXISTING CAULKING AND PROVIDE NEW SEALANT AT EXISTING FLASHING TO REMAIN. U. THE EXISTING ROOF SYSTEM MEMBRANE IS REPORTED TO BE ▐►FIRESTONE◄▌▐►CARLISLE] ▐►GOODYEAR◄▌ ▐►OTHER◄▌AND IS STILL UNDER WARRANTY. WORK ON EXISTING ROOF AND CONNECTIONS TO EXISTING MEMBRANE SHALL BE PERFORMED AS REQUIRED TO MAINTAIN CURRENT WARRANTY. V. VERIFY AND MAINTAIN EXISTING ROOF SLOPES AND DRAINAGE PATTERNS UNLESS OTHERWISE INDICATED. TEST FOR AND CORRECT ANY PONDING CONDITIONS. PROVIDE SMOOTH TRANSITIONS BETWEEN NEW ROOFING AND EXISTING FEATURES AS DETAILED OR AS REQUIRED BY CONDITIONS. W. RESTORE ROOF TO A WEATHERTIGHT CONDITION AT THE CONCLUSION OF EACH DAY'S ROOF REMOVAL AND RE- ROOFING ACTIVITIES. X. REPAIR AND REPLACE EXISTING ROOFING OR STRUCTURE DAMAGED BY IMPROPER STORAGE, CONSTRUCTION ACTIVITIES, OR LACK OF ADEQUATE TEMPORARY PROTECTION. THIS ALSO INCLUDES INTERIOR DAMAGE TO FINISHES, EQUIPMENT, FURNISHINGS, ETC., RESULTING FROM LEAKS. Y. EXISTING WOOD BLOCKING SHALL REMAIN UNLESS CONDITIONS REQUIRE REPLACEMENT OR UNLESS NOTED OTHERWISE. NEW BLOCKING SHALL BE PRESERVATIVE- TREATED WOOD. Z. CAP FASTENERS THAT PENETRATE ROOF DECK IN AREAS NOT CONCEALED BY CEILINGS WITH WIRE NUTS OR OTHER MEANS ACCEPTABLE TO ARCHITECT UNLESS OTHERWISE INDICATED. AREAS SUCH AS JANITOR CLOSETS, STORAGE ROOMS, MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, ETC., ARE EXEMPT FROM THIS REQUIREMENT UNLESS OTHERWISE INDICATED. AA. REFER TO MECHANICAL DRAWINGS TO COORDINATE ROOF CONDUCTOR LOCATIONS. 2 2 5 5 6 6 7 7 A A E E D D B B C C F F G G 4 4 H H 1 A-301 1 A-301 A-202A1 A-201 E1 A-202 C1 A-201 A1 1 A-321 2 A-321 3 A-321 A-202 E4 A-202 E6 200'-10"48'-2"250'-4"121'-8 29/32"200'-0 1/2"1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" A-421A2 3 1 1 8 8 SHEET TITLE SHEET NUMBER Kite Realty Group 30 S. Meridian Street, #1100 Indianapolis, Indiana 46204 Owner Republic Airways Holdings RATIO 101 South Pennsylvania Street Indianapolis, Indiana 46204 317-633-4040 Architect McComas/O'donnell & Naccarato Structural Engineer Mechanical / Plumbing Design/Builder Civil Engineer 8909 Purdue Road, Suite 300 Indianapolis, Indiana 46268 1717 E. 116th Street, Suite 200 Carmel, Indiana 46032 317-580-0402 DEEM LLC 6831 E 32nd Street Indianapolis, Indiana 46226 Kimley Horn 250 East 96th Street, Suite 580 Indianapolis, Indiana 46240 KEY PLAN B A HOTEL PROJECT NO. SHEET ISSUE NOT FOR CONSTRUCTION SEAL | DATE COPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. TRAINING CENTER Electrical Design/Builder Barth Electric Co., Inc. 1934 N. Illinois Street Indianapolis, Indiana 46202 9/23/2021 5:36:24 PMA-105 HIGH ROOF PLAN 21040.000 Republic Airways Training Center 12195 N. Meridian St. Carmel, Indiana 46032 KEYNOTES (SPEC BASED) GENERAL ROOFING NOTES GENERAL RE-ROOFING NOTES 3/32" = 1'-0"A-105 1 ROOF FLOOR PLAN 1 BID PACKAGE #1 08/30/21 08/30/21