HomeMy WebLinkAboutA-131-FIRST FLOOR REFLECTED CEILING PLANGYB BOARD CEILING
(REFER TO PLAN FOR
SUSPENSION TYPE)
ACOUSTIC CEILING TILE
2 x 4 LIGHT FIXTURE
DOWNLIGHT
MECHANICAL RETURN REGISTER
MECHANICAL AIR SUPPLY DIFFUSER
SPOT ELEVATION MARKER
XXX-01
10'-10" A.F.F.
CEILING TAG
CEILING TYPE
CEILING HEIGHT
(ABOVE FINISH FLOOR)
A. THESE GENERAL NOTES APPLY TO SERIES A-130
REFLECTED CEILING DRAWINGS.
B. INSTALL NEW CEILINGS AT ▐►+9'-0”◄▌A.F.F. UNLESS
NOTED OTHERWISE. ALL CEILINGS TO BE ▐►ACT-01
◄▌UNLESS NOTED OTHERWISE.
C. CENTER CEILING GRIDS WITHIN ROOMS EACH DIRECTION
UNLESS NOTED OTHERWISE.
D. LOCATE CEILING GRIDS WITHIN ROOMS SUCH THAT
BORDERS CONTAIN NOT LESS THAN 1/2 TILE WIDTH,
UNLESS OTHERWISE INDICATED.
E. CENTER PENETRATIONS IN ACOUSTICAL CEILING SYSTEMS
WITHIN INDIVIDUAL CEILING PANELS, SUCH AS SPRINKLER
HEADS, DIFFUSERS, LIGHT FIXTURES, ETC., UNLESS
OTHERWISE INDICATED.
F. PAINT EXPOSED GYPSUM BOARD AND PLASTER CEILING
SURFACES ▐►PT-XX◄▌UNLESS OTHERWISE INDICATED.
G. PROVIDE CONTROL JOINTS (C.J.) IN GYPSUM BOARD
CEILING CONSTRUCTION AS INDICATED. WHERE NOT
SHOWN, PROVIDE MAXIMUM SPACING BETWEEN JOINTS OF
30'-0”. VERIFY FINAL CONTROL JOINT LOCATIONS WITH
ARCHITECT PRIOR TO STARTING WORK WHETHER OR NOT
INDICATED ON THE DRAWINGS.
H. CEILING ACCESS PANELS INDICATED ARE NOT INTENDED
TO LIMIT NUMBER OF PANELS REQUIRED. PANEL QUANTITY
SHALL BE SUFFICIENT TO PROVIDE REQUIRED ACCESS
WHETHER OR NOT INDICATED ON THE DRAWINGS. VERIFY
FINAL LOCATIONS WITH ARCHITECT PRIOR TO STARTING
WORK.
I. REFER TO ▐►SERIES A-001◄▌GENERAL INFORMATION
DRAWINGS FOR MATERIAL SYMBOL KEY.
J. REFER TO ▐►SERIES A-150◄▌FINISH PLANS FOR
ADDITIONAL CEILING FINISH INFORMATION.
K. REFER TO ELECTRICAL DRAWINGS FOR CEILING-MOUNTED
LIGHT FIXTURE TYPES AND QUANTITIES.
L. REFER TO MECHANICAL DRAWINGS FOR CEILING-MOUNTED
DIFFUSERS, GRILLE TYPES AND QUANTITIES.
M. REFER TO FIRE PROTECTION DRAWINGS FOR SPRINKLER
HEAD TYPES AND QUANTITIES. HEADS HAVE BEEN
INTENTIONALLY OMITTED FROM REFLECTED CEILING PLANS
FOR CLARITY.
N. INSTALLATION OF CEILING SYSTEMS SHALL NOT BEGIN
PRIOR TO SUBMITTAL AND REVIEW OF CEILING
COORDINATION DRAWINGS SHOWING LAYOUT OF CEILING
GRIDS OR CONTROL JOINTS AND ITEMS TO BE INSTALLED IN
OR ON CEILINGS SUCH AS SPRINKLER HEADS, DIFFUSERS,
GRILLES, LIGHT FIXTURES, FIRE DETECTION AND ALARM
DEVICES, ACCESS PANELS, ETC.
O. PROVIDE ▐►4" AXIOM EDGE TRIM◄▌ON ALL EXPOSED
EDGES OF CEILINGS UNLESS NOTED OTHERWISE.
P. IN AREAS WHERE STRUCTURE IS EXPOSED, CONTRACTOR
TO PROVIDE FANAL LAYOUTS OF ALL DUCTWORK, PIPING,
CONDUIT, LIGHTING, ETC. FOR FINAL APPROVAL BY
ARCHITECT PRIOR TO INSTALLATION.
Q. PAINT ALL ELEMENTS ABOVE CLOUD CEILINGS WITHIN 6'-0"
OF PERIMETER INCLUDING BUT NOT LIMITED TO
DUCTWORK, STRUCTURE, CABLES, METAL STUDS, PIPING,
CEILING HANGERS, AND MECHANICAL DEVICES
A A
B B
C C
D D
E E
F F
G G
1
1
2
2
3
3
A.2 A.2
4
4
5
5
6
6
1.2
1.2
B.1 B.1
B.9 B.9
7
7
8
8
A.1 A.1
GWB-X1
12'-0" A.F.F.
GWB-01
9'-6" A.F.F.GWB-01
9'-6" A.F.F.
ACT-XX
12'-0" A.F.F.
ACT-XX
12'-0" A.F.F.
ACT-XX
12'-0" A.F.F.ACT-XX
12'-0" A.F.F.
ACT-XX
12'-0" A.F.F.
ACT-XX
12'-0" A.F.F.
ACT-XX
12'-0" A.F.F.
ACT-XX
12'-0" A.F.F.
EXP
EXST. GYP.
9'-6" A.F.F.
EXST. GYP.
9'-6" A.F.F.
KITCHEN
132 ELECTRICAL
133
LAUNDRY/LINEN
134
HOUSEKEEPING
140
EMPLOYEE
LOUNGE
142
FITNESS
143
STORAGE
138
OFFICE
141
PUMP ROOM
137
MECHANICAL
139
STAIR 2
RECEIVING
PAD
136
ELEV.
EQUIP
144
DINING
146
DINING
103
COLLABORATION
122
COLLABORATION
121
ELEV
137
ELEV
138
REC.
CENTER
118 ELECTRICAL
117
MECHANICAL
114
GUEST
LAUNDRY
113
REC.
CENTER
112LUGGAGE
STORAGE
107
VESTIBULE
101
MEN
130
WOMEN
131
F.5F.5
F.7F.7
1.1
1.1
LOBBY
100
GROUP
STUDY
106
YOGA STUDIO
145
ACT-XX
9'-6" A.F.F.ACT-XX
9'-6" A.F.F.
ACT-XX
9'-6" A.F.F.ACT-XX
9'-6" A.F.F.
ACT-XX
9'-6" A.F.F.
S6A.D.1.A
ACT-XX
9'-6" A.F.F.
ACT-XX
9'-6" A.F.F.
GWB-01
9'-6" A.F.F.
GWB-01
9'-6" A.F.F.
EXP
EXP
EXP
ACT-XX
10'-1 1/4" A.F.F.
DECORATIVE
CEILING
12'-6" A.F.F.
DECORATIVE
CEILING
12'-6" A.F.F.
EXP.
EXP.
ACT-XX
12'-0" A.F.F.
WD
12'-0" A.F.F.
OPEN TO ABOVE
OPEN TO ABOVE
OPEN TO ABOVE
9'-3"5'-1 11/16"GWB-01
9'-10" A.F.F.
GWB-01
9'-10" A.F.F.
S3C.AS3C.A
S3C.A
GWB-01
9'-10" A.F.F.
GWB-X1
8'-6" A.F.F.
TRASH/
RECYLING
135
8'-3 3/4"8'-9 3/8"10'-8 1/2"10'-0"10'-0"10'-0"10'-0"10'-0"4
SHEET TITLE
SHEET NUMBER
Kite Realty Group
30 S. Meridian Street, #1100
Indianapolis, Indiana 46204
Owner
Republic Airways Holdings
RATIO
101 South Pennsylvania Street
Indianapolis, Indiana 46204
317-633-4040
Architect
McComas/O'donnell & Naccarato
Structural Engineer
Mechanical / Plumbing Design/Builder
Civil Engineer
8909 Purdue Road, Suite 300
Indianapolis, Indiana 46268
1717 E. 116th Street, Suite 200
Carmel, Indiana 46032
317-580-0402
DEEM LLC
6831 E 32nd Street
Indianapolis, Indiana 46226
Kimley Horn
250 East 96th Street, Suite 580
Indianapolis, Indiana 46240
PROJECT NO.
SHEET ISSUE
NOT FOR CONSTRUCTION
SEAL | DATE
COPYRIGHT NOTICE: THIS ARCHITECTURAL
AND ENGINEERING DRAWING IS GIVEN IN
CONFIDENCE AND SHALL BE USED ONLY
PURSUANT TO THE AGREEMENT WITH RATIO.
NO OTHER USE, DISSEMINATION OR
DUPLICATION MAY BE MADE WITHOUT PRIOR
WRITTEN CONSENT OF RATIO. ALL COMMON
LAW RIGHTS OF COPYRIGHT AND OTHERWISE
ARE HEREBY SPECIFICALLY RESERVED.
Electrical Design/Builder
Barth Electric Co., Inc.
1934 N. Illinois Street
Indianapolis, Indiana 46202
10/29/2021 4:11:34 PMA-131
FIRST FLOOR
REFLECTED CEILING
PLAN
21040.000
Republic Airways
Hotel
12197 N Meridian St.
Carmel, IN 46032
RCP LEGEND
KEYNOTES (SPEC BASED)
GENERAL CEILING PLAN NOTES
KEYNOTES (ACTION/GENERAL)
3/32" = 1'-0"A-131
B1 FIRST LEVEL RCP
1 BID PACKAGE #1 08/30/21
2 DESIGN DEVELOPMENT 10/01/21
3 SHELL AND CORE PERMIT SET 10/15/21
4 10/29/21 ADDENDUM #1 10/29/21
10/29/21