HomeMy WebLinkAboutA-151-FIRST FLOOR FINISH PLANA A
B B
C C
D D
E E
F F
G G
1
1
2
2
3
3
A.2 A.2
4
4
5
5
6
6
1.2
1.2
B.1 B.1
B.9 B.9
7
7
8
8
A.1 A.1
W
B
F
LOBBY
100
WDWC
W
B
F
DINING
146
WDWC
W
B
F
COLLABORATION
122
RB
CPT
PT
W
B
F
COLLABORATION
121
RB
CPT
PT
W
B
F
WORKROOM
102
RB
CPT
WC
W
B
F
OFFICE
103
RB
CPT
PT
W
B
F
OFFICE
104
RB
CPT
PT W
B
F
OFFICE
105
RB
CPT
PT
ELEV
ELEV
W
B
F
GROUP STUDY
106
RBWC
W
B
F
LUGGAGE
STORAGE
107
RB
CPT
HPC W
B
F
INTERVIEW/
STUDY
108
RB
CPT
PT W
B
F
INTERVIEW/
STUDY
109
RB
CPT
PT
W
B
F
INTERVIEW/
STUDY
110
RB
CPT
PT W
B
F
INTERVIEW/
STUDY
111
RB
CPT
PT
W
B
F
REC. CENTER
112
RB
WC
W
B
F
GUEST LAUNDRY
113
RB
RS
HPC
W
B
F
MECHANICAL
114
RB
CON
PT
W
B
F
CORRIDOR
115
RB
WOM
PT
W
B
F
ELECTRICAL
117
RB
CON
PT
W
B
F
STAIR 3
S-11B
RB
CPT
WCW
B
F
REC. CENTER
118
RBWC
MEN
119
WOMEN
120
W
B
F
STAIR 1
S-11A
RB
CPT
WC
W
B
F
VESTIBULE
101
RB
WOM
W
B
F
DINING
103
WDWC
MEN
130
WOMEN
131
W
B
F
KITCHEN
132
EPB
EP
WP W
B
F
ELECTRICAL
133
RB
CON
PT
W
B
F
LAUNDRY/LINEN
134
RB
RS
HPC
W
B
F
FITNESS
143
RB
RS
WC
W
B
F
EMPLOYEE
LOUNGE
142
RB
RS
HPC
W
B
F
HOUSEKEEPING
140
RB
RS
PT
W
B
F
OFFICE
141
RB
CPT
PT
W
B
F
STORAGE
138
RB
RS
PT
W
B
F
MECHANICAL
139
RB
CON
PT
W
B
F
PUMP ROOM
137
RB
CON
PT
W
B
F
ELEV. EQUIP
144
RB
CON
PT
ELEV W
B
F
STAIR 2
RB
CPT
WC
W
B
F
RB-1
CPT-1
PT-1
RECEIVING PAD
136
W
B
F
TRASH/
RECYLING
135
RB
CON
HPC
W
B
F
CORRIDOR
515
WDWC
W
B
F
720 SF
YOGA STUDIO
145
RB
RS
HPC
W
B
F
CORRIDOR
516
RBWC
F.5F.5
F.7F.7
1.1
1.1
A-411
C4
A-411
C6
FLOORING MATERIAL
TRANSITION VIEW
REFERENCE
W
B
F
Room name
XXXXX
Base Fin
Floor Fin
Wall Fin
150 SF
ROOM NAME AND
ROOM FINISHES
PT-XX ACCENT WALL FINISH
DESIGNATION
FLOORING DIRECTION
-/---
CT
VCT
CT
TZ
QT
TZ
CPT
CT
CPT
VCT
CPT
QT
-/ ----/ ----/ ---
-/ ----/ ----/ ---
A. THESE GENERAL NOTES APPLY TO SERIES A-150
DRAWINGS.
B. PAINT NEW AND EXISTING HOLLOW METAL DOORS, DOOR
FRAMES, AND LINTELS EXPOSED TO VIEW IN FINISHED
AREAS AND AT EXTERIOR LOCATIONS ▐►PT-XX◄▌UNLESS
NOTED OTHERWISE.
C. PAINT STEEL COLUMNS, BEAMS, STRUCTURE, ETC.,
EXPOSED TO VIEW IN FINISHED AREAS ▐►PT-XX◄▌UNLESS
NOTES OTHERWISE.
D. PAINT EXISTING FIRE EXTINGUISHER CABINETS, METAL
ACCESS PANELS, LOUVERS, UNIT VENTILATORS, AND
OTHER PAINTABLE SURFACES IN ROOMS TO BE FINISHED
TO MATCH HOST WALL UNLESS NOTES OTHERWISE.
E. IN STAIRWELLS, PAINT STEEL STAIR AND LANDING PARTS
EXPOSED TO VIEW INCLUDING RISERS AND TREADS,
STRINGERS, UNDERSIDE OF STAIR STRUCTURE,
HANDRAILS, WALL BRACKETS, COMPONENTS VISIBLE FROM
EXTERIOR, ETC., ▐►PT-XX◄▌UNLESS NOTED OTHERWISE.
F. ▐►DO NOT APPLY◄▌▐►PROVIDE◄▌FINISHES BEHIND
FIXED CABINETS/CASEWORK.
G. ▐►DO NOT APPLY◄▌▐►PROVIDE◄▌FINISHES BEHIND
FIXED EQUIPMENT SUCH AS CHALK AND TACKBOARDS,
LOCKERS, ETC.
H. ALIGN FLOOR FINISH TRANSITIONS AT DOOR LOCATIONS
WITH CENTERLINE OF DOOR SUCH THAT TRANSITION
MATERIALS ARE NOT VISIBLE FROM EITHER SIDE WHEN
DOOR IS IN CLOSED POSITION.
I. REFER TO REFLECTED CEILING PLANS AND INTERIOR
ELEVATIONS FOR ADDITIONAL FINISH INFORMATION.
J. REFER TO PROJECT MANUAL DIVISION 09 FOR FINISH LEVEL
REQUIREMENTS FOR GYPSUM BOARD SURFACES UNLESS
OTHERWISE INDICATED.
K. ELEVATOR CABS TO RECEIVE ▐►WO-XX◄▌FLOORING,
▐►PL-XX◄▌WALLS, AND ▐►STAINLESS STEEL◄▌
CEILINGS, UNLESS NOTED OTHERWISE.
L. REFERENCE SHEET▐►A-651◄▌FOR TYPICAL TRANSITION
AND BASE DETAILS.
M. ALL WINDOWSILLS SHALL BE ▐►SSM-01◄▌UNLESS NOTED
OTHERWISE.
N. DO NOT APPLY BASE TO CURTAIN WALL BASE MULLION OR
BRICK. SCRIBE FLOOR FINISHES TO MULLIONS / BRICK.
O. UNLESS NOTED OTHERWISE, DO NOT TERMINATE OR
TRANSITION ANY FINISHES ON OUTSIDE CORNERS. BRING
ANY CONFLICTS TO THE ARCHITECT'S/OWNER'S ATTENTION
PRIOR TO ORDER AND INSTALLATION OF MATERIALS.
SHEET TITLE
SHEET NUMBER
Kite Realty Group
30 S. Meridian Street, #1100
Indianapolis, Indiana 46204
Owner
Republic Airways Holdings
RATIO
101 South Pennsylvania Street
Indianapolis, Indiana 46204
317-633-4040
Architect
McComas/O'donnell & Naccarato
Structural Engineer
Mechanical / Plumbing Design/Builder
Civil Engineer
8909 Purdue Road, Suite 300
Indianapolis, Indiana 46268
1717 E. 116th Street, Suite 200
Carmel, Indiana 46032
317-580-0402
DEEM LLC
6831 E 32nd Street
Indianapolis, Indiana 46226
Kimley Horn
250 East 96th Street, Suite 580
Indianapolis, Indiana 46240
KEY PLAN
B
A
HOTEL
PROJECT NO.
SHEET ISSUE
NOT FOR CONSTRUCTION
SEAL | DATE
COPYRIGHT NOTICE: THIS ARCHITECTURAL
AND ENGINEERING DRAWING IS GIVEN IN
CONFIDENCE AND SHALL BE USED ONLY
PURSUANT TO THE AGREEMENT WITH RATIO.
NO OTHER USE, DISSEMINATION OR
DUPLICATION MAY BE MADE WITHOUT PRIOR
WRITTEN CONSENT OF RATIO. ALL COMMON
LAW RIGHTS OF COPYRIGHT AND OTHERWISE
ARE HEREBY SPECIFICALLY RESERVED.
TRAINING
CENTER
Electrical Design/Builder
Barth Electric Co., Inc.
1934 N. Illinois Street
Indianapolis, Indiana 46202
10/29/2021 4:12:39 PMA-151
FIRST FLOOR FINISH
PLAN
21040.000
Republic Airways
Hotel
12197 N Meridian St.
Carmel, IN 46032
1/8" = 1'-0"A-151
A1 FIRST LEVEL FINISH PLAN
FINISHES-SYMBOLS LEGEND
KEYNOTES (SPEC BASED)
FINISH TRANSITIONS AT DOORS
GENERAL FINISH PLAN NOTES
1 BID PACKAGE #1 08/30/21
2 DESIGN DEVELOPMENT 10/01/21
3 SHELL AND CORE PERMIT SET 10/15/21
10/15/21