Loading...
HomeMy WebLinkAbout2021-11-01_Republic TC Foundation PlumbingDN 4" SAN 4" SAN2" SAN4" SAN 2" SAN 4" SAN 12" ST 12" ST 12" ST 2 3 1 1 5 5 6 9 8 11 6 1415 13 12 11 11 16 1616 17 16 10" ST 10" ST 4" SAN 4" SAN 4" SAN 1" CW 3" CW 4" SAN 4" SAN 4" SAN 4" SAN F.F.E. = 862.40' (19,061 SQ.FT.) (13,207 SQ.FT.) (32,268 SQ.FT.) (32,268 SQ.FT.)(32,268 SQ.FT.) 1 1 4" SAN 2" SAN 1 13 (13,176 SQ.FT.) (8,996 SQ.FT.) (13,176 SQ.FT.) (22,172 SQ.FT.) (22,913 SQ.FT.) (19,061 SQ.FT.) 13 10 7 3 12 4 4" ST 4" ST (741 SQ.FT.) 4" ST (741 SQ.FT.) 18 12" STORM I.E.= -4' -9" (857.25') 4" SAN I.E.= -2' -6" (859.50') 10" STORM I.E.= -4' -2 1/2" (857.79') 1" IRRIGATION BOP.= -5'-0" (857') 1" CW BOP.= -5'-0" (857') 2" SAN 7 2" SAN 2" SAN 7 8" ST 10" ST 8" ST 8" ST 10" ST10" ST 8" ST 10" ST 8" ST 1 2 3 4 5 6 7 8 A B C D E F G H J 7.7 D.8 D.3 3.2 C.7 C.6 A.3 A.4 1.8 2.2 2.4 3.8 4.1 5.4 5.6 6.4 6.6 7.4 7.6 7.8 C.8 2.6 2.8 3.3 4.8 5.2 5.8 6.2 6.8 7.2 2.1 7 865421 H A B C D E F G 3 I 3.2 GENERAL NOTES: 1. PROVIDE NEW DOMESTIC WATER, SANITARY WASTE, STORM DRAINAGE AND NATURAL GAS SYSTEMS FOR THIS BUILDING. PROVIDE ALL NECESSARY COMPONENTS FOR FULLY OPERATIONAL SYSTEM. INSTALL SYSTEMS IN ACCORDANCE WITH STATE REQUIREMENTS AND LOCAL AUTHORITY HAVING JURISDICTION. COORDINATE THE LOCATION OF ALL UTILITY CONNECTION POINTS, FLOOR DRAINS AND HUB DRAINS FOR EQUIPMENT WITH OTHER TRADES. 2. ALL FLOOR PENETRATIONS TO BE SEALED WATER TIGHT AND COMPLETELY PACKED WITH FIRE STOP MATERIAL BY TRADE CONTRACTORS. 3. ALL PENETRATIONS THROUGH FIRE RESISTANCE RATED CONSTRUCTION SHALL BE PROVIDED A UL LISTED THROUGH PENETRATION FIRESTOP ASSEMBLY. THE RATINGS OF ALL FIRESTOP ASSEMBLIES SHALL BE GREATER THAN OR EQUAL TO THE RATING OF THE PENETRATED BARRIER. 4. CORE DRILL PENETRATIONS IN CONCRETE FLOORS OR WALLS 1-2 INCHES LARGER THAN THE PIPE DRIAMETER OF THE PENETRATING PIPE. 5. NO STURCTURAL MEMBERS SHALL BE CUT, DRILLED OR BURNED WITHOUT THE KNOWLEDGE AND WRITTEN APPROVAL OF OWNER. 6. CONTRACTOR SHALL PROVIDE LABELS (WITH FLOW ARROWS) FOR ALL PIPING. 7. MAINTAIN MAIXIMUM HEADROOM AT ALL LOCATIONS. ALL PIPING TO BE AS TIGHT TO THE UNDERSIDE OF DECK AS POSSIBLE. ALL EXPOSED PIPING SHALL BE APPROVED BY ARCHITECT AND SHALL MAINTAIN REQUIRED CLEARANCES. 8. STORM AND SANITARY PIPING ARE TO BE INSTALLED SLOPED AT CODE ALLOWABLE SLOPES. SHEET TITLE SHEET NUMBER Kite Realty Group 30 S. Meridian Street, #1100 Indianapolis, Indiana 46204 Owner Republic Airways Holdings RATIO 101 South Pennsylvania Street Indianapolis, Indiana 46204 317-633-4040 Architect McComas/O'donnell & Naccarato Structural Engineer Mechanical / Plumbing Design/Builder Civil Engineer 8909 Purdue Road, Suite 300 Indianapolis, Indiana 46268 1717 E. 116th Street, Suite 200 Carmel, Indiana 46032 317-580-0402 DEEM LLC 6831 E 32nd Street Indianapolis, Indiana 46226 Kimley Horn 250 East 96th Street, Suite 580 Indianapolis, Indiana 46240 KEY PLAN B A HOTEL PROJECT NO. SHEET ISSUE SEAL | DATE COPYRIGHT NOTICE: THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. TRAINING CENTER Electrical Design/Builder Barth Electric Co., Inc. 1934 N. Illinois Street Indianapolis, Indiana 46202 11/1/2021 4:38:05 PMP-100 OVERALL FOUNDATION PLUMBING PLAN Republic Airways Training Center 12195 N. Meridian St. Carmel, Indiana 46032 3/32" = 1'-0"P-100 1 FOUNDATION PLUMBING PLAN # PLAN NOTES 1 SEE CIVIL ENGINEER'S SITE UTILITY PLAN FOR CONTINUATION 2 4" SANITARY UP TO EXTERIOR CLEANOUT 3 8" STORM UP TO EXTERIOR CLEANOUT 4 4" SANITARY STACK UP. 5 2" SANITARY UP TO FLOOR DRAIN 6 4" SANITARY UP IN CHASE 7 2" SANITARY UP IN WALL. 8 3" SANITARY UP TO MOP SINK 9 2" VENT UP 10 10" STORM UP 11 4" SANITARY UP TO FLOOR CLEANOUT 12 8" STORM UP TO FLOOR CLEANOUT 13 8" STORM UP 14 3" DOMESTIC COLD WATER SERVICE UP THROUGH SLAB 15 1" IRRIGATION UP THROUGH SLAB 16 4" SANITARY UP TO FLOOR DRAIN. 17 4" VENT UP THROUGH SLAB. 18 4" STORM UP IN CHASE ABOVE. 1 SHELL AND CORE PERMIT SET 10/15/21 2 WEEKLY PROGRESS SET 10/22/21 3 WEEKLY PROGRESS SET 10/29/21 10/29/21