HomeMy WebLinkAboutC101 STORMWATER POLLUTION PREVENTION PLAN PHASE IW W
D DDD
D DDD D DDD D DDDDDDDDDDDD
DDDDDDDDDDDDD D D D D D D
D D
D D D D D D D D D D D DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD D D
DDDDDD D DDDD4
IP IP IP IP
IP IP IP IPSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
IP
1
2
2 2
2
3
3
3
3
3
3
3
3
3
5
5
6
6
7
8
8
9
11
12
10
10
10
10
10
10
10
10
10
10
10
10
10
13
14
9
9
6
6
6
6
6
15
15
7
7
6
6
6 6
8
8
9
9
8
8
16
16
6
7
17
5
5
6
7
IP
8
9
11
11
7
7
7
7 7
8
8
5
SITE PREPARATION / SWPPP PHASE 1
NOTES
INSTALL CONCRETE WASHOUT. REFER TO DETAIL ON SHEET C104.
INSTALL SILT DIKE OR COIR LOG ON PAVEMENT. REFER TO DETAILS
ON SHEET C104.
EXISTING TREES TO REMAIN.
LIMITS OF EXISTING BUILDING.
REMOVE EXISTING CONCRETE WALK(S) TO NEAREST JOINT (IF
APPLICABLE).
SAWCUT EXISTING PAVEMENT FULL DEPTH FOR REMOVAL.
REMOVE EXISTING PAVING.
SAWCUT EXISTING CURB FOR REMOVAL.
REMOVE EXISTING CURB.
REMOVE EXISTING TREE(S) AND VEGETATION.
REMOVE/RELOCATE EXISTING SIGN(S).
STAGING AREA. PROVIDE CONSTRUCTION DUMPSTER, FUELING
AREA, AND PORT-O-LET AS NEEDED.
RELOCATE FIRE HYDRANT. COORDINATE WITH SHEET C800 AND
SERVICE PROVIDER.
REMOVE ATM ISLAND.
REMOVE PAINT.
EXISTING ASPHALT PAVEMENT TO BE MILLED AND REPLACED.
COORDINATE WITH OWNER.
RELOCATE LIGHT POLE AND BASE
EXISTING AREAS
TOTAL SITE = 5.07 AC.
DISTURBED = 0.14 AC.
PERVIOUS = 0.17 AC.
IMPERVIOUS = 4.90 AC.
REMOVED ASPHALT PAVEMENT
REMOVED CONCRETE PAVEMENT
HATCH LEGEND
SWPPP PHASE 1 LEGEND
- INLET PROTECTION - USE SUBSURFACE
INLET PROTECTION WITH OVERFLOW
CAPABILITY (DANDY SAC)
- STAGING AREA
- INSTALL COIR LOGS (GRASS AREA) OR SILT
DIKES (PAVEMENT AREA) AS SHOWN.
CONTRACTOR TO ADD ADDITIONAL MEASURES
AS CONSTRUCTION PHASING AND SITE
CONDITIONS DICTATE
- CONCRETE WASHOUT
- LIMITS OF DISTURBANCE
SD
IP
1
2
3
4
5
6
7
8
9
10
11
12
D
CONTACT PERSON FOR EROSION
CONTROL & SEDIMENT PRACTICES
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, IN 46268
TELEPHONE: (317) 846-6611
FAX: (317) 843-0546
EMAIL: PARKERF@WEIHE.NET
CONTACT PERSON: FRED PARKER, CPESC
LEGEND C101 SWPPP IC101STORMWATER POLLUTION PREVENTION PLAN PHASE IW22.0802AQW22.080203/03/2023BSMK/AQHARVEST MARKET2140 E. 116TH STREET, INDIANAPOLIS, IN 4603210 9abcd 8 7 6efgh109876
5 4 3 2 Part of the S/2 of Section 31, Township 18 North, Range 4 East, Clay Township, Hamilton County, Indiana1 PREPARED FOR:PROJECT NO.
SHEET NO.abcd5 4 3 2
e1
fhISSUED FOR PERMIT05.16.2023SMB1REVISIONS PER TAC REVIEW05.23.2023SMB2REVISED TO ADD ADA RAMP ON WEST SIDE OF AAA WAY06.06.2023SMB3REVISIONS PER CITY COMMENTS06.28.2023SB / SR4gALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitecturePROJECT NO.:REVISIONS AND ISSUESDATEBYDWG NAME:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:W
S
N
E
Know what's below.
before you dig.Call
R
13
14
UNDERGROUND GAS
UNDERGROUND WATER
UNDERGROUND ELECTRIC
G G G
W W
E E E
UNDERGROUND FIBER OPTICFOFO
LINE TYPES
15
16
17