HomeMy WebLinkAboutC800 UTILITY PLANW W
26 26 20
5
18 25
7
27 27 25 18
7
21 24
3
25
22 4" GW6" SS4" GW4" GW
W1
S1
WATER MAIN NOT LOCATED.
CONTRACTOR TO LOCATE PRIOR
TO RELOCATING HYDRANT AND LIGHT POLE
UTILITY PLAN NOTES
SANITARY SEWER NOTES:
GREASE TRAP - SEE PLANS AND DETAILS BY OTHERS
WATER SERVICE NOTES:
PROPOSED FIRE HYDRANT LOCATION PER CURRENT CARMEL
STANDARDS
C800 UTILITY PLANC800UTILITY PLANW22.0802AQW22.080203/03/2023BSMK/AQHARVEST MARKET2140 E. 116TH STREET, INDIANAPOLIS, IN 46032S1
10 9abcd 8 7 6efgh109876
5 4 3 2 Part of the S/2 of Section 31, Township 18 North, Range 4 East, Clay Township, Hamilton County, Indiana1 PREPARED FOR:PROJECT NO.
SHEET NO.abcd5 4 3 2
e1
fhISSUED FOR PERMIT05.16.2023SMB1REVISIONS PER TAC REVIEW05.23.2023SMB2REVISED TO ADD ADA RAMP ON WEST SIDE OF AAA WAY06.06.2023SMB3REVISIONS PER CITY COMMENTS06.28.2023SB / SR4gALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitecturePROJECT NO.:REVISIONS AND ISSUESDATEBYDWG NAME:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:W
S
N
E
Know what's below.
before you dig.Call
R
CONCRETE PAVEMENT
STANDARD DUTY ASPHALT
PAVEMENT
SITE PLAN LEGEND
EXISTING CONCRETE PAVEMENT
UNDERGROUND GAS
UNDERGROUND WATER
UNDERGROUND ELECTRIC
G G G
W W
E E E
UNDERGROUND FIBER OPTICFOFO
LINE TYPES
W1