Loading...
HomeMy WebLinkAbout06080027 Correspondence ",'\ ""'c\~ 'Vi'll \",~~" '~ .r,/l' ,,\:X :\,~~ ~ l,/ . ,<' f'; J.. \ ,~'.,:. " 'l, \, ' ~~ -. :v ~\ ~\ TRIAD ASSOCIATES, INC. ENGINEERING' ARCHITECTURE 5835 LAWlON LOOP EAST DRIVE, INDIANAPOlIS, IN 46216-1004 (317) 377-5230 . FAX: (3m 377-5241 REIFERS CENTER . 839 MAIN STREET . SUlTE 519 . LAFAYETTE, IN 47901 VOICE/FAX: (765) 428.8282 WEBSITE: www.trlodassaclate..Into . E.MAIl: Irlad@trladassoc.net October 20, 2006 " Mr. Brent Liggett, Building Inspector City of Carmel One Civic Square Carmel, IN 46032 Re: Cain Companies, Trinity Homes, LLC Kim Arndt, Spring Farms, Lot 50 13563 Spring Farms Drive Carmel, IN 46032 Building Permit ~~Q~~027~8-15-06) ~,--~; Dear Mr. Liggett, Mr. David Browning, Cain Companies Community Manager requested that I contact you regarding a question that was raised during your final inspection of the above referenced single-family residence. The house had the brick removed and replaced on the south face of the Garage and the south end of the west face of the Garage. The question that was raised was the amount of brick overhang on the areas of brick replacement. The brick overhang at several locations measured I Yz inches. The Building Code that applies for this remediation project is the International Building Code for One and Two Family Dwellings 2003 and adopted by the State of Indiana with modifications on September I 1,2005. Under Section R703.7, Stone and Masonry Veneer, General, there is no specified limit on the allowable brick overhang. Under Section R606, General Masonry Construction, there is a discussion in Sections 606.3 and 606.3.1 on support conditions for corbels, which should not have an overhang exceeding V, of the width of the masonry unit. I do not believe that Sections 606.3 or 606.3.1 can be constructed to apply to a Wall Covering under Section R703.7. Section R703.7 is the appropriate section that is to be applied to this project. if. Thenormal'practice . from .this engineer's experience is' tIult we 'attempt not to have an ","overhang exceeding v,'thelbrlok . Width .or I,.,1/16 inches. In .this case, we have .several '..Iocations that exceed what we consider the norrnalaccepted,overhang by 5//6 inches. The "". ' ~overhang'exceedllncewas;notcontinuous along the 'Wlil.I.Furlher, given the .adequate use ~ ~of;,wall;.ties.to.keep~the.:.veneer:horizontally stable there will not be any adverse impact on " 'the;brick,veneer on 'this one-story Garage wall. I Based on the above discussion it is my professional engineering opinion that the brick veneer has been replaced correctly. If you have any questions, please feel free to call. Very truly yours, TRIAD ASSOCIATES, INC. Engineering. Architecture ~v~ Thomas M. Schubert, P.E. Indiana Registration, P.E. 15614 TMS/dep Cc: Mr. James Blanchard, Chief Building Inspector / Mr. Bernie Cain, Cain Companies Mr. Joe Reel, Cain Companies Mr. David Browning, Cain Companies Mr. David Howard, Cain Companies 2