HomeMy WebLinkAboutC001 TITLE SHEETCONSTRUCTION PLANS FOR
CARMEL OFFICE BUILDING
1701 E. 116TH STREET
CARMEL, IN 46032
C001TITLE SHEETW220335-C001 titleNO SCALE
PROJECT LOCATION PROJECT LOCATION
LOCATION MAPAREA MAP
APPROXIMATELY 2.56 ACRES LOCATED ON 1701 E. 116TH STREET, INDIANAPOLIS, IN 46032 - PART OF
NW/4 OF SECTION 6, TOWNSHIP 17 NORTH, RANGE 4 EAST, CLAY TOWNSHIP, HAMILTON COUNTY, IN.
LAND DESCRIPTION
PLANS PREPARED FOR
S-MART REAL ESTATE, INC.
8925 PRAIRIE TRAIL
AVON, IN 46123
TELEPHONE: (317) 694-6500
CONTACT PERSON: WARREN JOHNSON
EMAIL: WARREN@STARMIDWEST.COM
1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING THAT ALL PERMITS AND
APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, AND STATE AGENCIES PRIOR TO
STARTING CONSTRUCTION.
2.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE EXACT LOCATION OF ALL
EXISTING UTILITIES IN THE VICINITY OF THE CONSTRUCTION AREA PRIOR TO STARTING
CONSTRUCTION
3.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO NOTIFY AND COORDINATE CONSTRUCTION WITH
ALL RESPECTIVE UTILITIES.
4.ALL QUANTITIES GIVEN ON THESE PRINTS, VERBALLY OR IN THE SCOPE OF WORK SECTION ARE
ESTIMATES AND SHALL BE CONFIRMED BY THE BIDDING CONTRACTORS.
5.OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS FOR EXCAVATIONS; FINAL
RULE 29 CFR PART 1926, SUBPART "P" APPLIES TO ALL EXCAVATIONS EXCEEDING FIVE (5) FEET IN
DEPTH.
6.IN ADDITION, EXCAVATION EXCEEDING TWENTY (20) FEET IN DEPTH REQUIRE THE DESIGN OF A
TRENCH SAFETY SYSTEM BY A REGISTERED PROFESSIONAL ENGINEER.
7.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER AND CONTRACTOR TO MAINTAIN QUALITY
CONTROL THROUGHOUT THIS PROJECT.
8.TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL
STANDARDS.
9.THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS
ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS.
10.ANY FIELD TILES ENCOUNTERED DURING EXCAVATION SHALL BE REPAIRED AND CONNECTED TO NEW
STORM SEWERS AND POSITIVE DRAINAGE PRESERVED.
11.IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER THAT ALL LANDSCAPE REQUIREMENTS ARE MET
AND CONFORM TO APPLICABLE LOCAL STANDARDS.
12.THE SITE DOES LIE IN A SPECIAL FLOOD HAZARD AREA AS ESTABLISHED BY THE FEDERAL EMERGENCY
MANAGEMENT AGENCY - NATIONAL FLOOD INSURANCE PROGRAM, WHEN PLOTTED BY SCALE ON
FLOOD INSURANCE RATE MAP #18057C0209G, DATED NOVEMBER 19, 2014.
13.BEARINGS, DIMENSIONS AND EASEMENTS ARE SHOWN FOR REFERENCE ONLY. SEE RECORD
SURVEYS & PLAT FOR EXACT INFORMATION.
14.THIS SITE DOES NOT CONTAIN ANY WETLANDS AT SHOWN ON THE U.S. DEPARTMENT OF THE INTERIOR
FISH AND WILDLIFE SERVICE; CARMEL, INDIANA, NATIONAL WETLANDS INVENTORY MAP DATED 2022.
GENERAL NOTES
CITY OF CARMEL STANDARD NOTES
DESIGN DATA
EXISTING ZONING
B-3
ZONING OVERLAY
N/A
TOTAL ACREAGE
2.56 ACRES
NET ACREAGE
2.56 ACRES
BUILDING COVER RATIO
10.7%
BUILDING SQUARE FOOTAGE
10,493 SQUARE FEET
IMPERVIOUS COVER RATIO
34.2%
TOTAL SITE DISTURBANCE
1.23 AC +/-
W
S
N
E
CITY OF CARMEL PLANNING
ONE CIVIC SQUARE
CARMEL, IN 46032
ANGIE CONN / ALEXIA LOPEZ
TEL: 317/571-2417
CITY OF CARMEL ENGINEERING
ONE CIVIC SQUARE
CARMEL, IN 46032
JOHN THOMAS / ALEX JORDAN
TEL: 317/571-2441
CITY OF CARMEL BLDG SERVICES
ONE CIVIC SQUARE
CARMEL, IN 46032
JIM BLANCHARD
TEL: 317/571-2444
CITY OF CARMEL FIRE DEPARTMENT
TWO CIVIC SQUARE
CARMEL, INDIANA 46032
CHRIS ELLISON
TEL: 317/571-2600
CARMEL CITY UTILITIES
30 W MAIN ST, SUITE 220
CARMEL, INDIANA 46032
JOHN DUFFY
TEL: 317/571-2648
HAMILTON COUNTY SURVEYOR
ONE HAMILTON COUNTY SQUARE
SUITE 188
NOBLESVILLE, INDIANA 46060
TEL: 317/776-8495
HAMILTON COUNTY HIGHWAY DEPT
1700 SOUTH 10TH STREET
NOBLESVILLE, INDIANA 46060
TEL: 317/773-7770
HAMILTON COUNTY HEALTH DEPARTMENT
18030 FOUNDATION DR. SUITE A
NOBLESVILLE, INDIANA 46060
JASON LEMASTER
TEL: 317/776-8500
TRICO
7236 MAYFLOWER PARK DR.
ZIONSVILLE, IN 46077
RYAN HARTMAN
TEL: 317-660-6604
DUKE ENERGY
100 SOUTH MILL CREEK RD.
NOBLESVILLE, INDIANA 46060
TEL: 317/776-5352
COMCAST
9750 E. 150th STREET
SUITE 1600
NOBLESVILLE, INDIANA 46060
TEL: 317/776-4495
CENTERPOINT ENERGY
16000 ALLISONVILLE ROAD
NOBLESVILLE, IN 46060
ANDREW THEISZ
TEL: 812-231-6403
AT&T
5858 NORTH COLLEGE
INDIANAPOLIS, INDIANA 46220
TEL: 317/252-5168
OPERATING AUTHORITIES
PLANS PREPARED BY
WEIHE ENGINEERS, INC.
10505 N. COLLEGE AVE.
INDIANAPOLIS, INDIANA 46280
TELEPHONE: (317) 846-6611
FAX: (317) 843-0546
CONTACT PERSON: ERIC CARTER
EMAIL: CARTERE@WEIHE.NET
REVISIONS AND ISSUESPart of the NW/4 of Section 06, Township 17 North, Range 4 East, Delaware Township, Hamilton County, IndianaW220335PREPARED FOR:1701 E. 116TH STREET PROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:TASDESIGNED BY:DWG NAME:PROJECT NO.:W220335DATEBY09.14.2022SSRDATE:TASKnow what's below.
before you dig.Call
R APPROVAL PENDINGNOT FOR CONSTRUCTIONCARMEL OFFICE BUILDINGRevised site based on Carmel comments and building changes2023-02-24SR/MSREVISIONS PER ADLS REVIEW 2023-06-05SSRSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SM06/05/2023GIULFORD RDCARMEL DR.
MEDICA DR.
116th ST.RANGELINE RD111th ST.MERIDIAN ST/ SR-31116th ST.KEYSTONE AVE.COLLEGE AVE.RANGELINE RD.465
106th ST.
MAIN ST.SPRING MILL RD.DITCH RD.TOWNE RD.96th ST.
146 ST.
126 ST.
Sheet List Table
Sheet Number Sheet Title
C001 TITLE SHEET
C100 SWPPP PHASE 1
C101 SWPPP PHASE 2
C102 SWPPP SPECIFICATIONS
C103 SWPPP DETAILS
C104 SWPPP DETAILS
C200 SITE PLAN
C201 SITE DETAIL
C202 SITE DETAILS
C300 GRADING PLAN
C301 COMPENSATORY STORAGE
C600 DRAINAGE PLAN
C601 STORM PLAN & PROFILE
C602 DRAINAGE DETAILS
C603 DRAINAGE DETAILS
C604 DRAINAGE DETAILS
C605 DRAINAGE DETAILS
C800 UTILITY PLAN
C900 SPECIFICATIONS
C901 SPECIFICATIONS
L100 LANDSCAPE PLAN
L201 LANDSCAPE DETAILS
SITE TBM #1
CUT SQUARE IN CONCRETE ON THE NORTH SIDE OF THE PROPERTY WEST
OF THE EAST ADJOINER'S DRIVE AND EAST OF WESTFIELD BLVD.
ELEV. = 818.74 (NAVD 88)
SITE TBM #2
CUT "X" IN THE NORTHEAST FIRE HYDRANT BONNET BOLT ON THE EAST SIDE
OF WESTFIELD BLVD. AND SOUTH OF 116TH STREET.
ELEV. = 820.69 (NAVD 88)
THE HORIZONTAL AND VERTICAL LOCATION DATA SHOWN ON THIS
SURVEY ARE BASED UPON POSITIONAL SOLUTIONS DERIVED FROM
REAL-TIME KINEMATIC (RTK) GLOBAL POSITIONING SYSTEM (GPS)
OBSERVATIONS PROCESSED BY THE INDIANA DEPARTMENT OF
TRANSPORTATION (INDOT) CONTINUOUSLY OPERATING REFERENCE
STATIONS (CORS). THE BEARINGS SHOWN ARE DERIVED FROM
COORDINATES BASED ON THE INDIANA STATE PLANE COORDINATE
SYSTEM (EAST ZONE) NAD 83 (2011) EPOCH 2010.0). THE VERTICAL
DATUM IS BASED UPON NAVD 88.
BENCHMARK INFORMATION
1.NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN APPROVED STORM WATER
MANAGEMENT PERMIT
2.THESE PLANS COMPLY WITH ALL ADA REQUIREMENTS.
3.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE
DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A
CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPER TO RESOLVE WITH THE
UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF
PROPOSED RIGHT-OF-WAY LINE.
4.ALL EXISTING PERIMETER ROAD DRAINAGE STRUCTURES AND BRIDGES ACROSS THE
FRONTAGE OF THIS DEVELOPMENT ARE INDICATED ON THE PLANS. PROVISIONS HAVE BEEN
MADE TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES AS NECESSARY
OR AS REQUEST BY THE CITY TO ACCOMMODATE THE PAVEMENT WIDENING, AUXILIARY LANES,
MULTI-USE PATH, AND ANY OTHER REQUIRED IMPROVEMENTS TO THE PROPERTY OR THE
ROADWAY. THE COST TO IMPROVE OR REPLACE ANY DRAINAGE STRUCTURES AND BRIDGES
WILL BE BORNE BY THE DEVELOPER.
5.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE
SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS
ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF
CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY.
6.CONTRACTOR SHALL PROTECT THE EXISTING CITY DUAL DUCT BANK IN THE RIGHT-OF-WAY. IN
THE EVENT OF CONFLICT WITH THE PROPOSED IMPROVEMENTS, RELOCATION OF THE DUAL
DUCT BANK AND ALL ASSOCIATED/APPURTENANT/ANCILLARY ITEMS SHALL BE THE SOLE
RESPONSIBILITY OF THE DEVELOPER SUBJECT TO REVIEW AND APPROVAL BY THE CITY.
7.ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT -OF-WAY SHALL CONFORM TO
THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL
CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING
TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION
REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW
THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND
PROPOSED RIGHT-OF-WAY.