Loading...
HomeMy WebLinkAboutC101 SWPPP PHASE 2IP WD 2021-03253 La Mouche LLC 1717 E. 116th Street Carmel, IN 46032 Zon e X Zon e A E STM STM STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMS T M S T M S T M S T M ATM TUBE TUBE GGGGGGGGGE(A)E(A)E(A)E(A)E(A)E(A)E(A)E(A)E(A)E(A)E. 116th STREET WESTFIELD BLVDOHUOHU OHU OHU OHU OHU Entry Courtyard 71.46'x61.83' OFFICE / RETAIL SPACE 84.83'x61.83' OFFICE/RETAIL SPACE DDDDDDDDDDDDDDDDDDDDDD DDDD D D DDD D D DDDD D D D DDDDDDDDDDDDD DDDDDDDDFFE=819.60 MFPG = 819.03 MLAG=818.83 W W W W WWWWWW WWEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEWWWWWIP IP IPIP IP IP IP IP IP CONTACT PERSON FOR EROSION CONTROL & SEDIMENT PRACTICES WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, IN 46268 TELEPHONE: (317) 846-6611 FAX: (317) 843-0546 EMAIL: PARKERF@WEIHE.NET CONTACT PERSON: FRED PARKER, CPESC -WARNING- THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. -NOTE- THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AFTER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. DISTURBED ACREAGE = 1.226± AC. LAND DESCRIPTION APPROXIMATELY 2.56 ACRES LOCATED ON 1701 E. 116TH STREET, INDIANAPOLIS, IN 46032 - PART OF NW/4 OF SECTION 6, TOWNSHIP 17 NORTH, RANGE 4 EAST, CLAY TOWNSHIP, HAMILTON COUNTY, IN. C101SWPPP PHASE 2W220335-C101 swppp2SWPPP PHASE 2 LEGEND - INLET PROTECTION - USE SUBSURFACE INLET PROTECTION WITH OVERFLOW CAPABILITY (DANDY SAC) - PERMANENT/TEMPORARY SEEDING USE PLANTING CHART - EROSION CONTROL BLANKET - USE S150BN BIO-NET AS SUPPLIED BY NORTH AMERICAN GREEN OR APPROVED EQUAL - POSTING AREA - 4" PVC TUBE WITH END CAPS ATTACHED TO PROJECT CONSTRUCTION SIGN TO CONTAIN APPROVED CONSTRUCTION DRAWINGS AND PERMITS FOR INSPECTORS. - CONCRETE WASHOUT - SILT FENCE - LIMITS OF DISTURBANCE (CONSTRUCTION LIMITS) - RIPRAP, REFER TO GRADING PLAN SHEET C300 FOR SIZING - SITE DISCHARGE POINT IP SF * D LINE TYPES UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC OVERHEAD UTILITY RIGHT OF WAY LINE BUILDING SETBACK LINE BOUNDARY LINE FLOW LINE G G G W W E(A)E(A) OHU OHU SECTION LINE INDEX CONTOUR INTERMEDIATE CONTOUR STORM SEWER EROSION CONTROL NOTES 1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS. 2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE TO FOLLOW CONTOUR. 3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET. EROSION CONTROL SPECIFICATIONS 1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. 2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS. 3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. 4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. 5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. 6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. 7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. 8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER. 9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "CONSTRUCTION STORMWATER GENERAL PERMIT"(327 IAC, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 10.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER TO MAINTAIN THE SWPPP INFORMATION SIGN UNTIL SUCH TIME THAT THE SITE IS READY FOR THE IDEM NOTICE OF TERMINATION. INSTALL 4" PVC TUBE WITH END CAPS ATTACHED TO THE SWPPP INFORMATION SIGN TO CONTAIN APPROVED SWPPP DRAWINGS AND PERMITS FOR INPSECTORS. 11.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. 12.PORTABLE TOILETS MUST BE ANCHORED.REVISIONS AND ISSUESPart of the NW/4 of Section 06, Township 17 North, Range 4 East, Delaware Township, Hamilton County, IndianaW220335PREPARED FOR:1701 E. 116TH STREET PROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:TASDESIGNED BY:DWG NAME:PROJECT NO.:W220335DATEBY09.14.2022SSRDATE:TASKnow what's below. before you dig.Call R APPROVAL PENDINGNOT FOR CONSTRUCTIONCARMEL OFFICE BUILDINGRevised site based on Carmel comments and building changes2023-02-24SR/MSREVISIONS PER ADLS REVIEW 2023-06-05SSRSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SM06/05/2023 W S N E *