Loading...
HomeMy WebLinkAboutC600 DRAINAGE PLANWD 2021-03253 La Mouche LLC 1717 E. 116th Street Carmel, IN 46032 Zon e X Zon e A E STM STM STMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMS T M S T M S T M S T M 8 20453ATM TUBE TUBE GGGGGGGGGE(A)E(A)E(A)E(A)E(A)E(A)E(A)E(A)E(A)E(A)E. 116th STREET WESTFIELD BLVDOHUOHU OHU OHU OHU OHU Entry Courtyard 71.46'x61.83' OFFICE / RETAIL SPACE 84.83'x61.83' OFFICE/RETAIL SPACE DDDDDDDDDDDDDDDDDDDDDD DDDD D D DDD D D DDDD DD D DDDDD DDDDDDDD DDDDDDDD6 FFE=819.60 MFPG = 819.03 MLAG=818.83 W W W W WWWWWW WWEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEWWWWW4 3 2 1 1 1 1 2 2 2 2 5 6 6 6 7 6 1 STORM SEWER STRUCTURE DATA TABLE STRUCTURE NUMBER 100 101 200 201 202 203 204 TOP OF CASTING 810.15 817.08 817.39 817.15 817.00 816.70 817.50 STRUCTURE TYPE FLARED END SECTION, 12'' DIA. 48'' DIA. MANHOLE WATER QUALITY STRUCTURE, 48'' DIA. PAVED INLET, 48'' DIA. PAVED INLET, 24 X 24 PAVED INLET, 48'' DIA. PAVED INLET, 24 X 24 CASTING TYPE N/A OUTLET CONTROL STRUCTURE PER MANUFACTURER R-3405 R-3405 R-3405 R-3405 INVERT INV IN (NW)= 808.90 (12" RCP) INV IN (NW)= 809.50 (12" RCP) INV OUT (SE)= 809.00 (12" RCP) INV IN (S)= 812.15 (15" RCP) INV OUT (NW)= 812.15 (15" RCP) INV IN (SW)= 812.40 (12" RCP) INV IN (NE)= 812.30 (12" RCP) INV OUT (N)= 812.20 (15" RCP) INV OUT (NW)= 812.61 (15" RCP) INV IN (N)= 814.50 (6" HDPE) INV OUT (NE)= 813.00 (12" RCP) INV IN (N)= 812.75 (12" RCP) INV IN (NW)= 813.00 (6" HDPE) INV OUT (SW)= 812.65 (12" RCP) INV OUT (S)= 813.37 (12" RCP) STORM SEWER PIPE DATA TABLE UPSTREAM STRUCTURE 101 200 201 201 202 203 204 DOWNSTREAM STRUCTURE 101 100 200 201 201 203 SIZE 12" 12" 15" 15" 15" 12" 12" 12" MATERIAL RCP RCP RCP RCP RCP RCP RCP RCP LENGTH 7' 16' 6' 13' 9' 121' 77' 120' SLOPE 0.71% 0.64% 0.81% 4.05% 0.57% 0.49% 0.45% 0.52% UGD UGD UGD DRAINAGE PLAN NOTES DOWNSPOUT/ROOF DRAIN POINT OF CONNNECTION. COORDINATE WITH ARCHITECTURAL PLANS. 6" HDPE DUAL WALLED HANCOR HQ OR EQUIVALENT ROOF DRAIN @ 1.0% MINIMUM 4" SUBSURFACE DRAINS, PERFORATED DUAL WALLED HANCOR HQ OR EQUIVALENT WATER QUALITY UNIT - HYDRO INTERNATIONAL FIRST DEFENSE. REFER TO DETAIL ON SHEET C605 STORM TRAP UNDERGROUND DETENTION SYSTEM. REFER TO DETAILS ON SHEET C603 - C 605 INSTALL AG-18 AQUA-GUARDIAN CATCH BASIN INSERT. REFER TO DETAIL ON SHEET C605 INSTALL CHECKMATE ULTRA FLEX INLINE CHECK VALVE ON OUTLET PIPE. REFER TO DETAILS ON SHEET C602 C600DRAINAGE PLANW220335-C600 drainage plan1 2 3 4 5 GUY ANCHOR STREET LIGHT UTILITY POLE TRANSFORMER RIGHT OF WAY LINE BOUNDARY LINE FIRE HYDRANT WATER METER WATER VALVE GAS METER GAS VALVE BOLLARD SIGN DOWN SPOUT ACCESSIBLE SPACE COMMUNICATIONS RISER STORM CLEANOUT CURB INLET SQUARE INLET STORM MANHOLE PARKING LOT LIGHT (1 HEAD) EXISTING ASPHALT CONCRETE PAVEMENT RIGHT OF WAY PAVEMENT ROW RIGHT OF WAY ESMT EASEMENT D.&U.E.DRAINAGE AND UTILITY EASEMENT FFE FINISH FLOOR ELEVATION RCP REINFORCED CONCRETE PIPE PVC POLYVINYL CHLORIDE PIPE HDPE HIGH DENSITY POLYETHYLENE PIPE SSD SUB SURFACE DRAIN PIPE STM STORM SAN SANITARY STR STRUCTURE CO CLEANOUT STANDARD DUTY ASPHALT RIP RAP PAVEMENT DRAINAGE PLAN LEGEND UTILITIES ABBREVIATIONS LINE TYPES INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER MAIN STORM SEWER MAIN UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND COMMUNICATIONS OVERHEAD UTILITY G G G W W E(A)E(A) C C C OHU OHU EMERGENCY FLOOD ROUTE SANITARY SEWER LATERALSANSAN ROOF DRAINSTMSTM SUB SURFACE DRAIN FLOW DIRECTION AND SLOPE GENERAL DRAINAGE NOTES 1.THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS OUTLINED IN THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND STORMWATER POLLUTION PREVENTION PLAN. 2.REFER TO THE INDIANA DEPARTMENT OF TRANSPORTATION (INDOT) STANDARD SPECIFICATIONS, LATEST EDITION, FOR BASIC MATERIALS AND CONSTRUCTION METHODS. THE SECTIONS BELOW FOR VARIOUS ITEMS ARE TO CLARIFY THE INTENT OF THE REQUIREMENTS FOR THIS PROJECT. PLEASE NOTE THAT OTHER SECTIONS OF THE INDOT STANDARD SPECIFICATIONS MAY ALSO BE APPLICABLE. 3.THE CONTRACTOR SHALL CONTACT APPLICABLE STATE UNDERGROUND LOCATION SERVICE AT LEAST 72 HOURS PRIOR TO ANY WORK AND SHALL CONTACT THE OWNER AND/OR ENGINEER SHOULD UTILITIES APPEAR TO BE IN CONFLICT WITH THE PROPOSED IMPROVEMENTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 4.THE PLANS SHOW THE LOCATION OF ALL KNOWN UTILITIES LOCATED WITHIN THE LIMITS OF CONSTRUCTION ACCORDING TO INFORMATION PROVIDED BY THE VARIOUS UTILITY COMPANIES, PREVIOUS CONSTRUCTION PLANS AND AS EVIDENCED BY OBSERVATION OF ABOVE GROUND CONDITIONS BY THE SURVEYOR. THE ACCURACY OF THIS INFORMATION IS NOT GUARANTEED. 5.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO LOCATE MAINS, CONDUITS, SERVICE LINES, ETC. WITHIN THE CONSTRUCTION LIMITS. THE LOCATION AND PROTECTION OF UTILITY STRUCTURES, THEIR SUPPORT AND MAINTENANCE DURING CONSTRUCTION (IN COOPERATION WITH APPLICABLE UTILITY COMPANY) IS THE EXPRESSED RESPONSIBILITY OF THE CONTRACTOR. 6.THE CONTRACTOR SHALL CONTACT ALL APPLICABLE UTILITIES AND VERIFY ANY AND ALL FEES ASSOCIATED WITH THE INSTALLATION OF ALL UTILITIES. 7.ALL CONSTRUCTION ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH O.S.H.A. STANDARDS FOR WORKER SAFETY. 8.ANY PART OF STORM SEWER TRENCHES RUNNING UNDER OR WITHIN 5' OF PAVEMENT TO BE BACKFILLED WITH GRANULAR MATERIAL. 9.IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION, SIZE, AND ELEVATION OF EXISTING UTILITIES, STRUCTURES, PIPES, PAVEMENTS, ETC. AS RELATED TO THEIR WORK. NOTIFY ENGINEER OF ANY CONFLICT AND/OR DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS. 10.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL CLEARANCE BETWEEN STORM / SANITARY SEWER SYSTEMS AND DOMESTIC/FIRE LINE SERVICE. SANITARY SEWER LINE IN PROXIMITY OF WATER LINE SHALL BE C900 WATER MAIN GRADE PVC. 11.CONTRACTOR TO INSTALL CONCRETE CRADLES WHEN THE VERTICAL SEPARATION (AS MEASURED FROM THE EXTERIOR OF THE PIPES) BETWEEN SANITARY SEWERS, WATER MAINS AND STORM SEWERS IS 18" OR LESS. 12.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 13.WHEN PERFORMING EXCAVATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. 14.COMPACTED "B" BORROW BACK FILL REQUIRED OVER ALL UTILITIES IN PAVED AREAS. 15.ALL UTILITY STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND COVERS. 16.COORDINATE LOCATIONS AND CONNECTIONS OF BUILDING STORM LINES WITH PLUMBING DRAWINGS. 17.FOLLOW ALL LOCAL AND STATE CODES IN REFERENCE TO STORM SEWER INSTALLATION. 18.ALL EXISTING MANHOLE AND CATCH BASIN GRATES SHALL BE ADJUSTED TO NEW FINISH GRADE ELEVATIONS. 19.EXISTING PIPES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS. 20.ALL STORM PIPE CONNECTIONS AT STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT. 21.ALL STORM SEWER STRUCTURES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT AND SHALL HAVE TRAFFIC BEARING RING AND COVERS. 22.ALL STORM SEWER STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR CHANNEL FROM INVERT IN TO INVERT OUT. 23.NEW PIPES AND STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS PRIOR TO FINAL TURNOVER TO THE OWNER. 24.ALL HDPE PIPE SHALL BE DUAL WALLED, HANCOR HQ, ADS N-12 PIPE OR APPROVED EQUAL. 25.ALL FITTINGS AND ACCESSORIES INCLUDING BUT NOT LIMITED TO END CAPS, CLEANOUTS, REDUCERS, ETC., SHALL BE OF HDPE MATERIAL COMPARABLE WITH STORAGE PIPES. 26.PROVIDE BACKFILL WITH A MINIMUM OF 4" BEDDING MATERIAL OF #8 AGGREGATE COMPACTED IN 8" LIFTS TO 95% MAXIMUM DRY DENSITY. 27.VERIFY EXISTING STORM INVERT ELEVATIONS PRIOR TO STARTING NEW STORM SEWER CONNECTION. STORM STRUCTURE T.O.C. ELEVATION LOCATION PAVED AREA INLET TOP OF CASTING (T.O.C.) ELEVATION LOCATION BEEHIVE INLET TOP OF CASTING (T.O.C.) ELEVATION LOCATION CHAIRBACK CURB TOP OF CASTING (T.O.C.) ELEVATION LOCATION SOLID LID CASTING TOP OF CASTING (T.O.C.) ELEVATION LOCATION END SECTION INVERT ELEVATION LOCATION 6 7 REVISIONS AND ISSUESPart of the NW/4 of Section 06, Township 17 North, Range 4 East, Delaware Township, Hamilton County, IndianaW220335PREPARED FOR:1701 E. 116TH STREET PROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:TASDESIGNED BY:DWG NAME:PROJECT NO.:W220335DATEBY09.14.2022SSRDATE:TASKnow what's below. before you dig.Call R APPROVAL PENDINGNOT FOR CONSTRUCTIONCARMEL OFFICE BUILDINGRevised site based on Carmel comments and building changes2023-02-24SR/MSREVISIONS PER ADLS REVIEW 2023-06-05SSRSTEVEN SCOTT RUCKER P.E. 11300279ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SM06/05/2023 W S N E