HomeMy WebLinkAboutBuilding MassingNORTH ELEVATION (Along 116TH street)
1/8" = 1'-0"
EAST ELEVATION
1/8" = 1'-0"
SOUTH ELEVATION
1/8" = 1'-0"
WEST ELEVATION (Along Rangeline/ Westfield blvd)
1/8" = 1'-0"
BANK ENTRANCE VIEW - PARTIAL EAST ELEVATION
BUILDING ENTRANCE VIEW - NORTH WEST AT ROUNDABOUT30'-3 1/4"27'-8"BRICK 1
BRICK 2
BRICK 3
ALUMINUM STOREFRONT
CAST STONE
BMO BANK PROJECT, CARMEL IN
30 JANUARY 2023
VIEW FROM INNER COURTYARD LOOKING NORTH WEST
VIEW FROM CIRCLE ON 116TH ST AND WESTFIELD BLVD LOOKING SOUTH EAST
BMO BANK PROJECT, CARMEL IN
30 JANUARY 2023
BMO BANK PROJECT, CARMEL IN
30 JANUARY 2023
NORTH ELEVATION
1/8" = 1'-0"
EAST ELEVATION
1/8" = 1'-0"
SOUTH ELEVATION
1/8" = 1'-0"
WEST ELEVATION
1/8" = 1'-0"
BANK ENTRANCE VIEW - PARTIAL EAST ELEVATION
BUILDING ENTRANCE VIEW - NORTH WEST AT ROUNDABOUT32'-11 1/4"27'-8"BRICK 1
BRICK 2
CAST STONE
CAST
STONE
COLORED ALUMINUM TUBE AWNING
BRICK 3
ALUMINUM STOREFRONT
NOTE: THE ENTIRE EXTERIOR FINISH MATERIAL IS A DRYVIT INSULATED WALL PANEL SYSTEM.
SPANDREL
PANEL
BMO BANK PROJECT, CARMEL IN
BMO BANK PROJECT, CARMEL IN
BMO BANK PROJECT, CARMEL IN