TABLE OF CONTENTS
DRAINAGE SUMMARy................ ......... ............ ..... ............ .......... ...... ..... ............. ... ........... SECTION 1
RUNOFF & STORM SEWER CALCULATIONS....................................................................... SECTION 2
DRAINAGE BASIN MAps ......... ....... ............ ............. ............ ..................................... ........ SECTION 3
Woolpert, Inc.
April 2006
Liberty Mutual Group (Indiana Insurance Company)
Parking Garage
U
I
i
U
i
q
o
Q-
o
i
o
!. .
I ~
W
i
U
,
U
q
W
,
'U
q
U
W
r.
U
t,
q
U
i
DRAINAGE SUMMARY
Project Description
The project consists of the construction of a four-level parking structure for the Indiana
Insurance Building, located in the Parkwood Crossing development. The structure will be
located immediately west of the Indiana Insurance Building where an existing surface parking lot
is currently located.
Existing Conditions
The existing site is a paved surface parking lot with landscaping with an undisturbed wooded
area along the south. The soil type present on the site is: Brookston(Br) silty clay loam.
The existing parking lot currently slopes from north to south. Runoff is collected by three storm
sewer inlets that drain off-site to the west and connect to the overall storm sewer system for
Parkwood Crossing. This portion of storm sewer system drains to an existing pond southwest of
the site, Pond 1. Pond 1 outlets west through a drop structure and drains through the storm sewer
network to a large detention pond, Pond 2, at the southwest comer of the overall development.
Pond 2 provides detention for the western half of the overall development, and outlets to storm
sewer along 96th Street. Table 1 shows the existing runoff properties and discharge to Pond 1:
T blIP D
d R ffP
rf
a e . re- eve ope uno rope les
Runoff Time of 2- Year 10-Year 100-Year
Conditions Area Coefficient Concentration Tc Discharge Discharge Discharge
(acres) (C) (min.) Q2yr Q 1 Oyr Q 100yr
(cfs) (cfs) (cfs)
Existing Site 2.41 0.55 25 3.04 4.74 6.88
Developed Conditions
All of the existing pavement, along with the three existing pavement inlets will be removed.
Stormwater from the proposed site will be directed to Pond 1 by two means. Runoff from the
north and west sides of the proposed parking structure will be collected with new storm sewer
inlets, which will tie into the existing storm sewer that drains off-site to the west, and eventually
to Pond 1. A trench drain at the lower level entrance on the east side of the structure will collect
a small amount of runoff, and will tie in with the interior building drains. The building drains
will then exit on the south side of the structure and connect to a proposed storm sewer, which
drains west through an oil separator, before outletting to Pond 1. The oil separator will prevent
Woolpert, Inc.
April 2006
Uberty Mutual Group (Indiana Insurance Company)
Parking Garage
u
o
o
I u-
U
U
I
U
L--- :
Q,
0-
i
U
Q-
Q
u
u
u
u
[
u
U
!,'
U
any oils draining from the parking structure from entering the drainage system. Table 2 shows
the post-developed runoff properties and discharge to Pond 1:
T hi 2 P t Did R ff P rf
a e . os - eve ope uno rope les
Runoff Time of 2- Year IO-Year 100-Year
Conditions Area Coefficient Concentration Tc Discharge Discharge Discharge
(acres) (C) (min.) Q2yr QlO QlOO
( cfs) (cfs) (cfs)
Proposed Site 2.41 0.59 25 3.15 4.90 7.12
The existing ponds, Pond 1 and Pond 2, will provide the two required BMPs for Post-
Construction stormwater pollution prevention. The oil separator will also aid in the water
quality.
The on-site storm sewer was designed for a IO-year storm event. Calculations are included in
this report.
Conclusion
The proposed parking structure will be built in the location of an existing paved parking lot. The
drainage pattern will remain very similar to currently conditions. Overall site runoff will
increase by slight amount, and will have negligible effects to the downstream drainage system.
No adverse drainage impacts are anticipated from the development.
Woolpert. Inc.
April 2006
Uberty Mutual Group (Indiana Insurance Company)
Parking Garage
U:
u-
u
U
D
W
o
1:- -,
L.'
U
1
w-
Q
u
I.
u.
D-
U
I
U
U
U
L....
U
U
SITE LOCATION MAP
Woolpert, Inc.
April 2006
Liberty Mutual Group (Indiana Insurance Company)
Parking Garage
u
U
D
i
U
U
U
o
(.:
W
U
i
U
I. .
U
U
U.
U
U
U
[,.
J' .
U
,
U
!
U
SOILS MAP
Woolpert, Inc.
April 2006
Uberty Mutual Group (Indiana Insurance Company)
Parking Garage
u
o
Q
D
Q
o
q
q
q
u
w
U
D
D
D
q-
q
p
o
RUNOFF & STORM SEWER
CALCULATIONS
WooIpert, Inc.
April 2006
Uberty Mutual Group (Indiana Insurance Company)
Parking Garage
u
u
~
D
D
o
~.....
u
u
~
u..
D
D
U
o
U
U
o
D
Project: Liberty Mutual Parking Garage
Location: Carmel, IN
Prepared By: JRS
Date: 4/19/2006
Site Runoff Calculations
Existing Site:
Q = CiA
Area = 2.41 acres
C= 0.57 I Q2-year = 3.04 cfsl
Tc= 25 min.
i2-year = 2.22 in/hr I Q10-year = 4.74 cfsl
i1O-year = 3.45 inlhr
i1Oo-year = 5.01inlhr I Q1oo-year = 6.88 cfsl
Proposed Site:
Q = CiA
Area = 2.41 acres
C= 0.59 I Q2-year = 3.15 cfsl
Tc= 25 min.
i2-year = 2.22 in/hr I Q 1O-year = 4.90 cfsl
'1O-year = 3.45 in/hr
i 100-year = 5.01 in/hr I Q 100-year = 7.12 cfsl
U
D
D
D
D
D
U
U
U
U
U
D
D
o
o
W
U
D
D
Project: liberty Mutual Parking Garage
Location: Carmel, IN
Prepared By: JRS
Pre-Dev Post-Dev Ex.lnlet Inlet
Basin Basin #2 #201
Grass Grass . Grass Grass
0.15 0.15 0.15 0.15
200 200 200 260
2.64 2.64 2.64 2.64
0.010 0.010 0.010 0.038
Total Time of Concentration:
atershed or subarea Tc or Tt.....hr
atershed or subarea Tc or Tt.....min
o
o
o
o
o
o
o
o
o
o
o
o
** All Time of Concentration values are assumed to be a minimum of 5 minutes.
Date: 4/17/2006
o
o
o
o
D
o
W
D
D
W
q
Q
q
Q
q
D
D
D
D
D-
I
U
D
D
Project: Liberty Mutual Parking Garage
Location: Carmel, IN
Prepared By: JRS
Existing
Basin
Proposed
Basin
Date: 4/17/2006
Runoff Coefficient - C
Surface Description C Area C x Area
Grass 0.25 1.14 0.285
Pavement 0.85 1.27 1.0795
Rooftop 0.90 0.00 0
0
Total: 2.41 1.36
c= 0.57
Surface Description C Area C x Area
Grass 0.25 1.03 0.2575
Pavement 0.85 1.38 1.173
Rooftop 0.9.0 0.00 0
0
Total: 2.41 1.43
c= 0.59
u
o
D
l
W
D
D
W'~
U
U
o
o
1
o
U
D
D
D
W
U
o
Project: liberty Mutual Parking Garage
Location: Carmel, IN
Prepared By: JRS
Inlet: 201
Inlet: 202
Inlet: 204
Date: 4/19/2006
Runoff Coefficient - C
Surface Description C Area C x Area
Grass 0.25 0.21 0.0525
Pavement 0.85 0.05 0.0425
Rooftop 0.90 0.00 0
0
Total: 0.26 0.10
c= 0.37
Surface Description C Area C x Area
Grass 0.25 0.03 0.0075
Pavement 0.85 0.07 0.0595
Rooftop 0.90 0.00 0
0
Total: 0.10 0.07
c= 0.67
Surface Description C Area C x Area
Grass 0.25 0.01 0.0025
Pavement 0.85 0.15 0.1275
Rooftop 0.90 0.00 0
0
Total: 0.16 0.13
c= 0.81
U
D
U
D. .
o
D
I
D
U
U
D
W
D
o
0'
U
D
I .
W
D'
I
U
Inlet: 209
Inlet: 210
Surface Description C Area C x Area
Grass 0.25 0.01 0.0025
Pavement 0.85 0.02 0.017
Rooftop 0.90 0.00 0
0
Total: 0.03 0.02
c= 0.65
Surface Description C Area C x Area
Grass 0.25 0.04 0.01
Pavement 0.85 0.01 0.0085
Rooftop 0.90 0.00 0
0
Total: 0.05 0.02
.
c= 0.37
~-~c~~~~~-~ ~~~~-~r~~~ ~-~~-~
Storm Sewer Tabulation Page 1
Station Len Orng Area Rnoff AreaxC Te Rain Total Cap Vel Pipe Invert Elev HGL Elev Gmd 1 Rim Elev Line 10
eoeff (I) flow full
Line To Iner Total Iner Total Inlet Syst Size Slope Up On Up On Up On
Line
(ft) (ae) (ae) (e) (m!n) (m!n) (In/hr) (efs) (ets) (ftIs) (In) (%) (ft) (ft) (ft) (ft) (ft) (ft)
1 End 74.0 0.26 0.96 0.37 0.10 0.40 18.0 32.0 3.0 1,20 7.22 2.95 18 0.47 829.22 828.87 829.64 829.29 843.00 0.00 201 to Ex-5
2 1 60.0 0.00 0.60 0.00 0.00 0.24 0.0 31.1 3,0 0.73 3.08 2.21 12 0.75 829.95 829.50 830.31 830.07 839.50 843.00 203 to 201
3 2 115.0 0.16 0.60 0.81 0.13 0.24 5.0 29.2 3.1 0.75 3.08 2.47 12 0.75 830.81 829.95 831.18 830.42 834.50 839,50 204 to 203
4 3 122.0 0.44 0.44 0.25 0.11 0.11 25.0 25,0 3.4 0,38 2.52 2.31 12 0.50 833;47 832.86 833.73 833.12 836.12 834.50 Ex-2 to 204
5 1 103.0 0.10 0.10 0.67 0.07 0.07 5.0 5.0 7.0 0.47 3.08 1.74 12 0.75 830.27 829.50 830.56 830.07 833.75 843.00 202 to 201
6 End 65.0 0.00 1.13 0.00 0.00 0.96 0.0 5.5 6.8 6.52 6.77 4.67 18 0.42 830.77 830.50 831.84 831.55 834.25 0.00 206 to 205
7 6 40.0 0.00 1.13 0.00 0.00 0.96 0,0 5.3 6.9 6.59 6.64 4.55 18 0.40 831.18 831.02 832.26 832.14 834.25 834.25 207 to 206
8 7 75.0 1.13 1.13 0.85 0.96 0.96 5.0 5.0 7.0 6.71 6.75 4.01 18 0.41 831.50 831.19 832.57 832.57 834.25 834.25 208 to 207
LIBERTY MUTUAL PARKING GARAGE Number of lines: 8 Run Date: 04-20-2006
NOTES: Intensity = 56.971 (Inlet time + 9.00) ^ 0.80; Return period = 10 Yrs.
Hydraflow Stonn Sewers 2005
rr ! ~
81lr SV3t1V 3~VNIVtlQ .L3'NI C?
"'-
~111~1 F~rl 111\' Ov~9v VNVIONI 'SI10dVNVIONI '133~lS 4\96 lSV3 Og~ 0 .. J Ii
J I
"'- Z
~ 'II. I"~~ j II ·
.,,~: !I~ I-~ eO/lr:/tO 3~VtlV~ ~NI)ltlVd (ANVdWOO 30NVtlnSNI VNVI NU ex: f _CD
~u - I f Q ..
Cluh dnOH~ 1'1n.LnW A.LH3BI1 J ~
- -
Q51
i
lil
~
1
LI-
o
I
I-
J:
<.:>
CE
VI
L
5l
~
is
~
i
o
....
11\ .
I: r \~
ii
J:
I
1
r-. !'
Ul
f"")
0
.J'f;.~"
==
1
---I
--.,
---I
I
--,
--.,
__...J
I
--,
i:l'
~
~~ I
~ ~,\
Po: !ii III
~~ :::
--~
~
"'-
1
I
I
f-..,-
_-I L~
I \
I \
1 \
1 I
1 I
I I
1 I
1 I
1 I
1
L.,
1
1
I
I
__J
1
--l
-.;:;.;;;--~;;;.;--.....-::;;~;:;..;;,.;;;,;:;;..;:;..:;..;..-
.....- ...... ..-. .--.................... ",.... -..... .............. .....
.'
..
.-------------------
.
.
.
I
I
() I I I I I I t I I
I I I I I I t I I
I I I I I I I I I I
. . I I I ! I I I I I
I I I t r S~dSlONI)QfVdltC' I
i ~--~-~--~--~--+--t--~-+:::l
f ' I I I , , r , I "II
I ' I I I I , I , I:::'
I r I I I ! I 1 I 1.,,1
, I lIt I I , I I""
'.' , , I I , , I 'i~ I
nil II II' "1::1 I I
I lIt , , , I '" I I
I t I 1 . I , , 1 ::1 I .
I I I I , I 1 I f I~"I I ,
I I , I t I I I I 1_,::' I I
I I I I t I I 1 I 1,,,1 I t
} -_J- _-1__ -l-_04 - -+~ -j. - -J-- _I-.......h -~ --i-
I ,
f j
(II
~ I
..J
5
c:a
- -
:JAd ,,8
o
III
,.., co
Cl ..t
CO)
z co
Q
-J ui
5
a:l u:
u:
/
/
/
r--.../
I
I
I
I
I
I
I
I
I
I
I
I 1
I 1
L_____________-I
Cl
z
Q
..J
5
c:a
15 ON OJOO lon1"" veqn 19r~ I10.,OJd S:O
II. to:~;:OI 9ootlo~/t 'JltPl.~S:A8 P.'oS 110'
6.P'NOI'-II"'8I\() poo.....Od '&.P'90-tl-tO - p6I8R""Q" 16.p'Q-Lst;s !6ap'd-L t;s !6ap'9tt~~1'1I-'St;9 ",t.lX ' ".&OWI 'SU'NI '"WON QO! 1"0.(0' I
u
U
D
o
D
o
o
i
q
o
i
o
q
U
i
q
q
q
q
Q
l
'0
[
Q
DRAINAGE BASIN MAPS
Woo/pert, Inc.
April 2006
Uberty Mutual Group (Indiana Insurance Company)
Parking Garage
I~