HomeMy WebLinkAboutCrown Castle Cover Letter.pdf
The Foundation for a Wireless World
CrownCastle.com
370 Mallory Station Rd
Franklin, TN 37067
Phone: (615) 771-1553
www.crowncastle.com
August 15, 2023
IN - CITY OF CARMEL
Department of Community Services
1 CIVIC SQUARE
CARMEL, IN 46032
Via Electronic Delivery
**********NOTICE OF ELIGIBLE FACILITIES REQUEST**********
RE: Request for Minor Modification to Existing Wireless Facility – Section 6409
Site Address: 5484 E 126th St, Carmel, IN 46033
Crown Site Number: 877635 / Crown Site Name: Carmel - Plum Creek
Customer Site Number: MW04116A / Application Number: 649582
Attention Department of Community Services:
On behalf of Sprint Spectrum LLC, f/k/a Sprint Spectrum L.P. (“Sprint PCS” or “Applicant”), Crown Castle USA Inc.
(“Crown Castle”) is pleased to submit this request to modify the existing wireless facility noted above through the
collocation, replacement and/or removal of the Applicant’s equipment as an eligible facilities request for a minor
modification under Section 64091 and the rules of the Federal Communications Commission (“FCC”).2
Section 6409 mandates that state and local governments must approve any eligible facilities request for the modification
of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or
base station. Under Section 6409, to toll the review period, if the reviewing authority determines that the application is
incomplete, it must provide written notice to the applicant within 30 days, which clearly and specifically delineates all
missing documents or information reasonably related to whether the request meets the federal requirements.3
Additionally, if a state or local government, fails to issue any approvals required for this request within 60 days, these
approvals are deemed granted. The FCC has clarified that the 30-day and 60-day deadlines begins when an applicant: (1)
takes the first step required under state or local law; and (2) submits information sufficient to inform the jurisdiction that
this modification qualifies under the federal law4. IN - CITY OF CARMEL requires the electronic submission of
applications for . Please allow this letter to confirm that, on August 15, 2023, Applicant submitted its electronic
application through the appropriate forum. This letter supplements the electronic filing for purposes of starting the review
period. Accordingly, the deadline for written notice of incomplete application is September 14, 2023, and the deadline for
issuance of approval is October 14, 2023.
1 Middle Class Tax Relief and Job Creation Act of 2012, Pub. L. No. 112-96, § 6409 (2012) (codified at 47 U.S.C. § 1455).
2 Acceleration of Broadband Deployment by Improving Wireless Facility Siting Policies, 29 FCC Rcd. 12865 (2014) (codified at 47
CFR § 1.6100); and Implementation of State & Local Governments’ Obligation to Approve Certain Wireless Facility Modification
Requests Under Section 6409(a) of the Spectrum Act of 2012, WT Docket No. 19-250 (June 10, 2020).
3 See 47 CFR § 1.6100 (c)(3). 4 See 2020 Upgrade Order at paragraph 16.
The Foundation for a Wireless World
CrownCastle.com
370 Mallory Station Rd
Franklin, TN 37067
Phone: (615) 771-1553
www.crowncastle.com
The proposed scope of work for this project includes:
Add or replace antennas, ancillary equipment and ground equipment as per plans for an existing carrier on an existing
wireless communication facility.
At the end of this letter is a checklist of the applicable substantial change criteria under Section 6409. Additionally, please
find enclosed the following information in support of this request:
(1) Construction Drawings;
(2) Structural Analysis; and
(3) Section 6409 Substantial Change Checklist.
As these documents indicate, (i) the modification involves the collocation, removal or replacement of transmission
equipment; and (ii) such modification will not substantially change the physical dimensions of such tower or base station.
As such, it is an “eligible facilities request” as defined in the FCC’s rules to which the 60-day deadline for approval applies.
Accordingly, Applicant requests all authorization necessary for this proposed minor modification under Section 6409.
Our goal is to work with you to obtain approvals earlier than the deadline. We will respond promptly to any request for
related information you may have in connection with this request. Please let us know how we can work with you to
expedite the approval process. We look forward to working with you on this important project, which will improve wireless
telecommunication services in your community using collocation on existing infrastructure. If you have any questions,
please do not hesitate to contact me.
Regards,
Donna Davis
Donna Davis
Site Acquisition Specialist
Crown Castle, Agent for Applicant
(615) 771-1553
Donna.Davis@crowncastle.com
The Foundation for a Wireless World
CrownCastle.com
370 Mallory Station Rd
Franklin, TN 37067
Phone: (615) 771-1553
www.crowncastle.com
Section 6409 Substantial Change Checklist
Towers Outside of the Public Right of Way
The Federal Communications Commission has determined that a modification substantially changes the physical dimension of a wireless tower or
base station under 47 U.S.C. § 1455(a) if it meets one of six enumerated criteria under 47 C.F.R. § 1.6100.
Criteria for Towers Outside the Public Rights of Way
YES/NO
NO
Does the modification increase the height of the tower by more than the greater of:
(a) 10%
(b) or, the height of an additional antenna array plus separation of up to 20 feet from the top of
the nearest existing antenna?
YES/NO
NO
Does the modification add an appurtenance to the body of the tower that would protrude from the
edge of the tower more than 20 feet or more than the width of the tower structure at the level of the
appurtenance, whichever is greater?
YES/NO
NO
Does the modification involve the installation of more than the standard number of new equipment
cabinets for the technology involved or add more than four new equipment cabinets?
YES/NO
NO
Does the modification entail an increase in square footage by more than two thousand five hundred
(2,500) square feet?
YES/NO
NO
Does the modification defeat the concealment elements of the eligible support structure?
YES/NO
NO
Does the modification violate conditions associated with the siting approval with the prior approval the
tower or base station other than as specified in 47 C.F.R. § 1.6100(c)(7)(i) – (iv)?
If all questions in the above section are answered “NO,” then the modification does not constitute a substantial change to the existing
tower under 47 C.F.R. § 1.6100.