Loading...
HomeMy WebLinkAboutC6.1 STORM PLAN AND PROFILESPROPOSED BUILDING ±21,633 GSF FFE = 907.90 TOWNE ROADSTR. 106 RIM=906.23 INV(S)=902.55 (12" RCP)STR. 100 RIM=906.52 INV(S)=900.59 (24" RCP) INV(N)=901.49 (12" RCP) INV(E)=900.49 (24" RCP) STR. 102 RIM=906.20 INV(E)=900.98 (24" RCP) INV(W)=901.08 (24" RCP) STR. 101 RIM=906.05 INV(W)=900.79 (24" RCP) INV(N)=900.69 (24" RCP) INV(W)=902.12 (8" HDPE) STR. 103 RIM=906.20 INV(W)=901.41 (18" RCP) INV(NE)=902.64 (10" HDPE) INV(E)=901.31 (24" RCP) STR. 105 RIM=906.27 INV(E)=902.26 (12" RCP) INV(N)=902.36 (12" RCP)STR. 104 RIM=906.06 INV(W)=902.04 (12" RCP) INV(E)=901.64 (18" RCP) INV(N)=902.47 (8" HDPE) INV(N)=902.64 (6" HDPE) STR. 100A RIM=905.52 INV(S)=901.65 (12" RCP)TOWNE ROADM PROPOSED 25' ACCESS EAEMENT 9' - 6" PVC SDR 35 @ 2.08% MIN. SANITARY CLEANOUT TYPE II 3' - 6" PVC SDR 35 @ 2.08% MIN. FDC PIV COORDINATE UTILITY LOCATIONS AT BUILDING WITH MEP DRAWINGS TRANSFORMER PAD COORDINATE W/ UTILITY EXISTING STORM STRUCTURE TO BE CORE DRILLED, CONNECTION TO BE SEALED WITH NON SHRINK GROUT AND ENTIRELY ENCASED IN CONCRETE ON EXTERIOR OF EXISTING STRUCTURE. CONTRACTOR TO USE EXTREME CAUTION WHEN EXCAVATING UNDER OVERHEAD UTILITY LINES 15' - SSD (TYP) 15' - SSD (TYP) 15' - SSD (TYP) FIRE HYDRANT TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION. ADJUST TO GRADE. EXISTING 8" DIP WATER MAIN TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION COORDINATE SANITARY CONNECTION AT BUILDING WITH MEP PLANS COORDINATE ROOF DRAIN CONNECTION AT BUILDING WITH MEP PLANS COORDINATE ROOF DRAIN CONNECTION AT BUILDING WITH MEP PLANS COORDINATE ELECTRICAL SERVICE ROUTE WITH UTILITY CONSTRUCTION LIMITS (TYP) WATER METER 2" TYPE K COPPER DOMESTIC SERVICE LINE GAS SERVICE LINE. COORDINATE WITH UTILITY 68' - 1 2 " R C P @ 0 . 3 2 % 92' - 18" RCP @ 0.25%117' - 24" RCP @ 0.20% 36' - 24" RCP @ 0.20% STR. BMP RIM=905.60 INV(W)=900.47 (24" RCP) INV(E)=900.37 (24" RCP) COORDINATE ROOF DRAIN CONNECTION AT BUILDING WITH MEP PLANS COORDINATE TRENCH DRAIN CONNECTION IN OUTDOOR AREA WITH MEP PLANS 44' - 6" HDPE @ 1.00% 44' - 8" HDPE @ 1.00%49' - 24" RCP @ 0.20%93' - 24" R C P @ 0 . 2 0 %49' - 12" RCP @ 0.32%10' - 24" RCP @ 0.20% 57' - 8" HDPE @ 1.00%56' - 10" HDPE @ 1.00%59' - 12" RCP @ 0.32%HORIZONTAL SCALE: 1"=20' VERTICAL SCALE:1"=5' 885 890 895 900 905 910 915 920 885 890 895 900 905 910 915 920 0+00904.5905.3906.531+00905.8906.16906.4906.812+00907.0906.34907.1906.953+00906.7906.30907.0906.654+00907.2906.10907.1906.595+00906.8906.50INV.=900.30 W (24" RCP)INV.=899.30 N (30" RCP)INV.=899.40 S (30" RCP)INV.=899.40 E (12" RCP)STR. #EX.MH 2 -RIM.=905.0236' - 24" RCP @ 0.20%INV.=900.47 W (24" RCP)INV.=900.37 E (24" RCP)STR. #BMP - CS-6 WQURIM.=905.6010' - 24" RCP @ 0.20%INV.=900.59 S (24" RCP)INV.=901.49 N (12" RCP)INV.=900.49 E (24" RCP)STR. #100 - 60" MANHOLERIM.=906.5249' - 24" RCP @ 0.20%INV.=900.79 W (24" RCP)INV.=900.69 N (24" RCP)INV.=902.12 W (8" HDPE)STR. #101 - 60" MANHOLERIM.=906.0593' - 24" RCP @ 0.20%117' - 24" RCP @ 0.20%INV.=900.98 E (24" RCP)INV.=901.08 W (24" RCP)STR. #102 - 60" MANHOLERIM.=906.20INV.=901.41 W (18" RCP)INV.=902.64 NE (10" HDPE)INV.=901.31 E (24" RCP)STR. #103 - 48" MANHOLERIM.=906.2092' - 18" RCP @ 0.25%INV.=902.04 W (12" RCP)INV.=901.64 E (18" RCP)INV.=902.47 N (8" HDPE)INV.=902.64 N (6" HDPE)STR. #104 - 48" MANHOLERIM.=906.0668' - 12" RCP @ 0.32%INV.=902.26 E (12" RCP)INV.=902.36 N (12" RCP)STR. #105 - 48" MANHOLERIM.=906.2759' - 12" RCP @ 0.32%INV.=902.55 S (12" RCP)STR. #106 - 48" MANHOLERIM.=906.233850 Priority Way South Drive, Suite 110Indianapolis, IN 46240Phone: (317) 779-2194NO.DATEREMARKSFILENAME: DATE: JOB NO. SHEET 02/14/2023 12357 ACE HARDWAREVillage of WestClay2425 HARLESTON STREET, CARMEL, IN 46032FILENAME: 12357_C6.0 UT SCALE 1" = 20' 200 40 N R CERTIFIED BY106/06/2023REVISIONS PER TAC REVIEW207/07/2023ADDENDUM 2307/07/2023ISSUED FOR CONSTRUCTION407/25/2023BULLETIN 2STORM PLAN AND PROFILESC6.1 GRANULAR BACKFILL PER CARMEL DRAWING 10-31 EXISTING GRADE PROPOSED GRADE HYDRAULIC GRADE LINE PROFILE LEGEND: NOTE: THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH DEVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS-BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 FPS OR LEE OR 10 FPS OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS-BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS-BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL