HomeMy WebLinkAboutMonroe, LLC/ENG/$-32,700/CO #1/16-ENG-97A DocuSign Envelope ID:A783BF4D-1315-40FE-B644-39D2680629DF
City of Carmel Project 16- ENG-97A
{Gray Road Path }
APPROVED
By Sergey Grechukhin at 11:29 am,Aug 09,2023
CHANGE ORDER #1
See attachment.
Contract Price prior to this Change Order $649,940.00
Contract Price will be decreased by this Change Order $-32,700
New Contract Price including this Change Order $617,240
Amount Adjusted Contract Cumulative%Change
Price from Original Contract
Original Contract $649,940.00 N/A
CM $-32,700 $617,240 -5.03%
DocuSign Envelope ID:A783BF4D-1315-40FE-B644-39D2680629DF
CITY OF CARMEL
TO: CONTRACT CHANGE ORDER NO.:1
DATE:8/8/2023
PROJECT NAME:Gray Road Path 16-ENG-97A
CITY REQ. NO.:
CITY PO NO.: 108517
CITY PO DATE:12/17/2022
I. You are directed to make the following changes in this Contract:
(Brief Description)
SCHEDULED ADJUSTMENT
ITEM AMOUNT CO OR(-) DAYS
II. The following referenced Documents further describe the changes outlined in Paragraph I, and
are to be considered a part of this Change Order: R.F.P.: N/A W.D.C. No.: N/A
Other:See attached proposals
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $649,940.00
Contract Price will be increased/decreased by this Change Order $-32,700.00
New Contract Price including this Change Order $617,240
Contract Time Prior to this Change Order N/A Days 0813112023 Completion Date
Net increased/decreased resulting from this Change Ordere Days
Current Contract Time including this Change Order N/A Days 0910 8/2 02 3 Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are Approved:
Recommended ' Accepted: DocuSigned by:
City of Carmel �` Li, i
ENGINEER ( CQ CTOR y bRirainard, Mayor
1 Civic Square �/ 11"-HO Nt' \r1� (4(Q'� /lbt&. t,
Address Address D uSi A gnedmgt3EFttirke,Member
Fovi %{S W
Li2tt , Member
Carmel,IN 46033 Na., \\V
City/State/Zip City/State/Zip I J y ashma , PE,
City Engineer
B . By: ATTEST:
DocuSigned by:
Phone:317 571 441 Phone: 3\1 j'1 - �„Ceel) �S t�gt
StiirMlfgang, Clerk
Date: Date: ) Date: 8 16/2023
DocuSign Envelope ID:A783BF4D-1315-40FE-B644-39D2680629DF
11.11111111.111 4440 West St Rd 46
Nashville, IN 47448
IVI N R O E [IC (812) 988-1615
1 TE �k+/V�1~7 R F< (317) 847-2697
Change Order Summary
Date: 8/8/23
Customer: City of Carmel
Job Location: Gray Rd Pathway 106th to 116th
Additional work added to project
• Well Retirement - $4,500
• Tree removal at lift station - $800
• Private residence 4" drain tie-in - $1,800
• Fire hydrant 18"extension and valve box replacement - $5,000
Reduction is project scope
• Fire hydrant assembly - (10,000)
• Signal pole pedestal—2 @ (7,000)
• Rectangular rapid flashing beacon—2 @ (7,900)
• Pedestrian push button aps—2 @ (2,500)
Costs
Proposal shall cover all necessary manpower, and equipment, as well as hauling and
disposal of material generated on job site. All work to be performed to customer
satisfaction. Monroe LLC will not be responsible for damage to buried utilities that are
unable to be located.