Loading...
HomeMy WebLinkAboutMonroe, LLC/ENG/$-32,700/CO #1/16-ENG-97A DocuSign Envelope ID:A783BF4D-1315-40FE-B644-39D2680629DF City of Carmel Project 16- ENG-97A {Gray Road Path } APPROVED By Sergey Grechukhin at 11:29 am,Aug 09,2023 CHANGE ORDER #1 See attachment. Contract Price prior to this Change Order $649,940.00 Contract Price will be decreased by this Change Order $-32,700 New Contract Price including this Change Order $617,240 Amount Adjusted Contract Cumulative%Change Price from Original Contract Original Contract $649,940.00 N/A CM $-32,700 $617,240 -5.03% DocuSign Envelope ID:A783BF4D-1315-40FE-B644-39D2680629DF CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.:1 DATE:8/8/2023 PROJECT NAME:Gray Road Path 16-ENG-97A CITY REQ. NO.: CITY PO NO.: 108517 CITY PO DATE:12/17/2022 I. You are directed to make the following changes in this Contract: (Brief Description) SCHEDULED ADJUSTMENT ITEM AMOUNT CO OR(-) DAYS II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C. No.: N/A Other:See attached proposals The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $649,940.00 Contract Price will be increased/decreased by this Change Order $-32,700.00 New Contract Price including this Change Order $617,240 Contract Time Prior to this Change Order N/A Days 0813112023 Completion Date Net increased/decreased resulting from this Change Ordere Days Current Contract Time including this Change Order N/A Days 0910 8/2 02 3 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended ' Accepted: DocuSigned by: City of Carmel �` Li, i ENGINEER ( CQ CTOR y bRirainard, Mayor 1 Civic Square �/ 11"-HO Nt' \r1� (4(Q'� /lbt&. t, Address Address D uSi A gnedmgt3EFttirke,Member Fovi %{S W Li2tt , Member Carmel,IN 46033 Na., \\V City/State/Zip City/State/Zip I J y ashma , PE, City Engineer B . By: ATTEST: DocuSigned by: Phone:317 571 441 Phone: 3\1 j'1 - �„Ceel) �S t�gt StiirMlfgang, Clerk Date: Date: ) Date: 8 16/2023 DocuSign Envelope ID:A783BF4D-1315-40FE-B644-39D2680629DF 11.11111111.111 4440 West St Rd 46 Nashville, IN 47448 IVI N R O E [IC (812) 988-1615 1 TE �k+/V�1~7 R F< (317) 847-2697 Change Order Summary Date: 8/8/23 Customer: City of Carmel Job Location: Gray Rd Pathway 106th to 116th Additional work added to project • Well Retirement - $4,500 • Tree removal at lift station - $800 • Private residence 4" drain tie-in - $1,800 • Fire hydrant 18"extension and valve box replacement - $5,000 Reduction is project scope • Fire hydrant assembly - (10,000) • Signal pole pedestal—2 @ (7,000) • Rectangular rapid flashing beacon—2 @ (7,900) • Pedestrian push button aps—2 @ (2,500) Costs Proposal shall cover all necessary manpower, and equipment, as well as hauling and disposal of material generated on job site. All work to be performed to customer satisfaction. Monroe LLC will not be responsible for damage to buried utilities that are unable to be located.