Loading...
HomeMy WebLinkAboutRieth-Riley Construction Co., Inc/ENG/$102,383.56/CO #8/20-ENG-01 DocuSign Envelope ID:A783BF4D-1315-40FE-B644-39D2680629DF City of Carmel Project 20-ENG-Ol APPROVED By Sa,gey Grechakhin of 2:21 pm,.I t20,2023 Smoky Row Road Reconstruction from Old Meridian Road to Rangeline Road CHANGE ORDER #8 This Change Order shall consist of establishing additional new contract pay items for added work associated with the Smoky Row Contract for Project 20-ENG-01.This change in contract items consists of incorporating additional items performed on a time and materials basis or additional items added to the contract which were not in the original scope of work. These items include but not limited to adjustments in cost for providing winter concrete,cost associated with additional mobilizations,the cost for resetting of existing guardrail and new guardrail end treatment Type OS, the cost to adjust an existing hydrant along with providing additional material stolen for Rangeline Decorative Wall and the substitution of mulch in lieu of sod. Contract Price prior to this Change Order $8,507,872.25 Contract Price will be increased/decreased by this Change Order $ 102,383.56 New Contract Price including this Change Order $8,610,255.81 Amount Adjusted Contract Cumulative%Change Price from Original Contract Original Contract $7,198,416.21 $7,198,416.21 N/A COI $ 67,144.18 $7,265,560.39 0.93% CO2 $ 793,523.68 $8,059,084.07 11.96% CO3 $ 171,824.40 $8,230,908.47 14.34% C04 $ -21,052.12 $8,209,856.35 14.05% CO5 $ 36,949.54 $8,246,805.89 14.56% CO6 $ 59,928.64 $8,306,734.53 15.40% C07 $ 201,137.72 $8,507,872.25 18.19% CO8 $ 102,383.56 $8,610,255.81 19.61% DocuSign Envelope ID:A783BF4D-1315-40FE-B644-39D2680629DF CITY OF CARMEL TO: Rieth-Riley Construction CONTRACT CHANGE ORDER NO.: 8 1751 W. Minnesota Street DATE: 7/07/23 Indianapolis, IN. 46221 PROJECT NAME: Smoky Row Road Reconstruction CITY REQ.NO.: 20-ENG-01 CITY P. O.NO.: 106303 CITY P. O.DATE.: 2/23/22 I. You are directed to make the following changes in this Contract: This Change Order shall consist of establishing additional new contract pay items for added work associated with the Smoky Row Contract for Project 20-ENG-01. This change in contract items consists of incorporating additional items performed on a time and materials basis or additional items added to the contract which were not in the original scope of work. These items include but not limited to adjustments in cost for providing winter concrete, cost associated with additional mobilizations, the cost for resetting of existing guardrail and new guardrail end treatment Type OS, the cost to adjust an existing hydrant along with providing additional material stolen for Rangeline Decorative Wall and the substitution of mulch in lieu of sod. II. The following referenced documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C.No.: Other: ATTACHMENT A The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 8,507,872.25 Contract Price will be increased/decreased by this Change Order $ 102,383.56 New Contract Price including this Change Order $ 8,610,255,81 Contract Time Prior to this Change Order 0 Days 12/2/23 Completion Date Net increased/decreased resulting from this Change Order Days Current Contract Time including this Change Order 0 Days 12/2/23 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended: Accepted: DocuSigned by Beam,Longest and Neff LLC Rieth-RileyConstruction Inc. 072.0r0210D0471-. ENGINEER CONTRACTOR SBrrai:nard, Mayor 8320 Craig Street 1751 W. Minnesota Street Ma Qvui.. uvt, Address Adddd ass l,° Miurke,Member L `6Wuts n, Member Indianapolis, IN 46250 Indianapolis, 6221 City/State/Zip City/State/Zip J�iy."Kashman,PE, City Engineer By: v By: A'1`l'hST: Michael A.Jaskela,Area Manager D sy d by Phone: 317-849-5832 Phone: 317-634-5561 �S� °� Sue '8TfS"aah Clerk Date: 7/13/23 Date: 74 72,2 Date: 8/16/2023g DocuSign Envelope ID:A783BF4D-1315-40FE-B644-39D2680629DF ATTACHMENT A CHANGE ORDER NO. 8 Item Desception Units Unit Price Quaintly Amount No, Increase Decrease Increase Decrease 217 Fire Hydrant Extension Each $ 2,608.86 1 $2,606.86 30.00 218 Additional Mobilization for signage and crosswalk at Monon Trail!Smoky Row crossing Leum $ 1.768.25 1 $1,768.25 $0.00 219 Additional Mobilization for Guardrail Reset Laurin $ 2,685,59 1 $2,685.59 $0.00 220 Guardrail,Reset LR $ 18.26 231.5 S4,227.19 $0,00 221 Guardrail End Treatment,OS Each $ 3,115.29 1 $3,115.29 $0.00 222 Winter Concrete Loser $76,140.79 1 376,140.79 _ $0.00 223 Furnish Missing Cast Stone Coping Caps _ Lsum $ 4,549.39 1 $4,549.39 $0.00 224 Shredded Hardwood Bark Mulch Cys $ 118.17 60 _ $7,090.20 $0.00 $0.00 $0.00 SUBTOTAL $102,383.56 $0.00 TOTAL NET INCREASE $102,383.56 A-2